Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System

The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation [1]. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6,5 MW. Steady state operation of high power RF sources and components is chall...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Delpech, L, Achard, J, Berger-By, G, Bouquey, F, El Khaldi, M, Guilhem, D, Goletto, C, Hillairet, J, Magne, R, Marfisi, L, Mollard, P, Negrier, V, Poli, S, Prou, M, Samaille, F, Volpe, D, Kazarian, F, Beunas, A, Boghossian, E
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 434
container_issue 1
container_start_page 431
container_title
container_volume 1187
creator Delpech, L
Achard, J
Berger-By, G
Bouquey, F
El Khaldi, M
Guilhem, D
Goletto, C
Hillairet, J
Magne, R
Marfisi, L
Mollard, P
Negrier, V
Poli, S
Prou, M
Samaille, F
Volpe, D
Kazarian, F
Beunas, A
Boghossian, E
description The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation [1]. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6,5 MW. Steady state operation of high power RF sources and components is challenging and requires careful validation before the system can be commissioned on the tokamak. Results on the validation of CW klystrons, improvements on the RF components forming part of the power generation circuit and the development of an RF water load to sustain CW pulses under 700kW RF power are presented.
doi_str_mv 10.1063/1.3273785
format Conference Proceeding
fullrecord <record><control><sourceid>proquest_osti_</sourceid><recordid>TN_cdi_osti_scitechconnect_21335762</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>743550558</sourcerecordid><originalsourceid>FETCH-LOGICAL-o215t-4d76d2facf933dc39c26ae8d99e084d3c6618804f8a3cc4cac2aad198562ff703</originalsourceid><addsrcrecordid>eNotzMtKAzEYQOHgBay1C98g4MLV1CR_rksZrRUKiq2X3RBysSPTSZ1kEN9eQVdn83EQOqdkTomEKzoHpkBpcYAmVAhaKUnlIZoZpYkCwYkSwI_QhBDDK8bh7QSd5vxBCDNK6QnavNiu9ba0qccp4voVL9v3LX5MX2HA6zQOLmRse4-fFrhOu33qQ18yjmnAZRvwJg0Br8f9YPFqWd_g9XcuYXeGjqPtcpj9d4qeF7ebelmtHu7u6-tVlRgVpeJeSc-iddEAeAfGMWmD9sYEorkHJyXVmvCoLTjHnXXMWk-NFpLFqAhM0cXfN-XSNtm1JbitS30fXGkYBRBKsl91-af2Q_ocQy7Nrs0udJ3tQxpzozgIQYTQ8AM7bGBV</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype><pqid>743550558</pqid></control><display><type>conference_proceeding</type><title>Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System</title><source>AIP Journals Complete</source><creator>Delpech, L ; Achard, J ; Berger-By, G ; Bouquey, F ; El Khaldi, M ; Guilhem, D ; Goletto, C ; Hillairet, J ; Magne, R ; Marfisi, L ; Mollard, P ; Negrier, V ; Poli, S ; Prou, M ; Samaille, F ; Volpe, D ; Kazarian, F ; Beunas, A ; Boghossian, E</creator><creatorcontrib>Delpech, L ; Achard, J ; Berger-By, G ; Bouquey, F ; El Khaldi, M ; Guilhem, D ; Goletto, C ; Hillairet, J ; Magne, R ; Marfisi, L ; Mollard, P ; Negrier, V ; Poli, S ; Prou, M ; Samaille, F ; Volpe, D ; Kazarian, F ; Beunas, A ; Boghossian, E</creatorcontrib><description>The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation [1]. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6,5 MW. Steady state operation of high power RF sources and components is challenging and requires careful validation before the system can be commissioned on the tokamak. Results on the validation of CW klystrons, improvements on the RF components forming part of the power generation circuit and the development of an RF water load to sustain CW pulses under 700kW RF power are presented.</description><identifier>ISSN: 0094-243X</identifier><identifier>ISBN: 9780735407534</identifier><identifier>ISBN: 0735407533</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/1.3273785</identifier><language>eng</language><publisher>United States</publisher><subject>70 PLASMA PHYSICS AND FUSION TECHNOLOGY ; GHZ RANGE ; KLYSTRONS ; LOWER HYBRID CURRENT DRIVE ; PLASMA ; PULSES ; RF SYSTEMS ; STEADY-STATE CONDITIONS ; TORE SUPRA TOKAMAK ; WAVEGUIDES</subject><ispartof>AIP conference proceedings, 2009, Vol.1187 (1), p.431-434</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,776,780,881,27901,27902</link.rule.ids><backlink>$$Uhttps://www.osti.gov/biblio/21335762$$D View this record in Osti.gov$$Hfree_for_read</backlink></links><search><creatorcontrib>Delpech, L</creatorcontrib><creatorcontrib>Achard, J</creatorcontrib><creatorcontrib>Berger-By, G</creatorcontrib><creatorcontrib>Bouquey, F</creatorcontrib><creatorcontrib>El Khaldi, M</creatorcontrib><creatorcontrib>Guilhem, D</creatorcontrib><creatorcontrib>Goletto, C</creatorcontrib><creatorcontrib>Hillairet, J</creatorcontrib><creatorcontrib>Magne, R</creatorcontrib><creatorcontrib>Marfisi, L</creatorcontrib><creatorcontrib>Mollard, P</creatorcontrib><creatorcontrib>Negrier, V</creatorcontrib><creatorcontrib>Poli, S</creatorcontrib><creatorcontrib>Prou, M</creatorcontrib><creatorcontrib>Samaille, F</creatorcontrib><creatorcontrib>Volpe, D</creatorcontrib><creatorcontrib>Kazarian, F</creatorcontrib><creatorcontrib>Beunas, A</creatorcontrib><creatorcontrib>Boghossian, E</creatorcontrib><title>Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System</title><title>AIP conference proceedings</title><description>The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation [1]. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6,5 MW. Steady state operation of high power RF sources and components is challenging and requires careful validation before the system can be commissioned on the tokamak. Results on the validation of CW klystrons, improvements on the RF components forming part of the power generation circuit and the development of an RF water load to sustain CW pulses under 700kW RF power are presented.</description><subject>70 PLASMA PHYSICS AND FUSION TECHNOLOGY</subject><subject>GHZ RANGE</subject><subject>KLYSTRONS</subject><subject>LOWER HYBRID CURRENT DRIVE</subject><subject>PLASMA</subject><subject>PULSES</subject><subject>RF SYSTEMS</subject><subject>STEADY-STATE CONDITIONS</subject><subject>TORE SUPRA TOKAMAK</subject><subject>WAVEGUIDES</subject><issn>0094-243X</issn><issn>1551-7616</issn><isbn>9780735407534</isbn><isbn>0735407533</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2009</creationdate><recordtype>conference_proceeding</recordtype><recordid>eNotzMtKAzEYQOHgBay1C98g4MLV1CR_rksZrRUKiq2X3RBysSPTSZ1kEN9eQVdn83EQOqdkTomEKzoHpkBpcYAmVAhaKUnlIZoZpYkCwYkSwI_QhBDDK8bh7QSd5vxBCDNK6QnavNiu9ba0qccp4voVL9v3LX5MX2HA6zQOLmRse4-fFrhOu33qQ18yjmnAZRvwJg0Br8f9YPFqWd_g9XcuYXeGjqPtcpj9d4qeF7ebelmtHu7u6-tVlRgVpeJeSc-iddEAeAfGMWmD9sYEorkHJyXVmvCoLTjHnXXMWk-NFpLFqAhM0cXfN-XSNtm1JbitS30fXGkYBRBKsl91-af2Q_ocQy7Nrs0udJ3tQxpzozgIQYTQ8AM7bGBV</recordid><startdate>20090101</startdate><enddate>20090101</enddate><creator>Delpech, L</creator><creator>Achard, J</creator><creator>Berger-By, G</creator><creator>Bouquey, F</creator><creator>El Khaldi, M</creator><creator>Guilhem, D</creator><creator>Goletto, C</creator><creator>Hillairet, J</creator><creator>Magne, R</creator><creator>Marfisi, L</creator><creator>Mollard, P</creator><creator>Negrier, V</creator><creator>Poli, S</creator><creator>Prou, M</creator><creator>Samaille, F</creator><creator>Volpe, D</creator><creator>Kazarian, F</creator><creator>Beunas, A</creator><creator>Boghossian, E</creator><scope>7U5</scope><scope>8FD</scope><scope>L7M</scope><scope>OTOTI</scope></search><sort><creationdate>20090101</creationdate><title>Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System</title><author>Delpech, L ; Achard, J ; Berger-By, G ; Bouquey, F ; El Khaldi, M ; Guilhem, D ; Goletto, C ; Hillairet, J ; Magne, R ; Marfisi, L ; Mollard, P ; Negrier, V ; Poli, S ; Prou, M ; Samaille, F ; Volpe, D ; Kazarian, F ; Beunas, A ; Boghossian, E</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-o215t-4d76d2facf933dc39c26ae8d99e084d3c6618804f8a3cc4cac2aad198562ff703</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2009</creationdate><topic>70 PLASMA PHYSICS AND FUSION TECHNOLOGY</topic><topic>GHZ RANGE</topic><topic>KLYSTRONS</topic><topic>LOWER HYBRID CURRENT DRIVE</topic><topic>PLASMA</topic><topic>PULSES</topic><topic>RF SYSTEMS</topic><topic>STEADY-STATE CONDITIONS</topic><topic>TORE SUPRA TOKAMAK</topic><topic>WAVEGUIDES</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Delpech, L</creatorcontrib><creatorcontrib>Achard, J</creatorcontrib><creatorcontrib>Berger-By, G</creatorcontrib><creatorcontrib>Bouquey, F</creatorcontrib><creatorcontrib>El Khaldi, M</creatorcontrib><creatorcontrib>Guilhem, D</creatorcontrib><creatorcontrib>Goletto, C</creatorcontrib><creatorcontrib>Hillairet, J</creatorcontrib><creatorcontrib>Magne, R</creatorcontrib><creatorcontrib>Marfisi, L</creatorcontrib><creatorcontrib>Mollard, P</creatorcontrib><creatorcontrib>Negrier, V</creatorcontrib><creatorcontrib>Poli, S</creatorcontrib><creatorcontrib>Prou, M</creatorcontrib><creatorcontrib>Samaille, F</creatorcontrib><creatorcontrib>Volpe, D</creatorcontrib><creatorcontrib>Kazarian, F</creatorcontrib><creatorcontrib>Beunas, A</creatorcontrib><creatorcontrib>Boghossian, E</creatorcontrib><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>OSTI.GOV</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Delpech, L</au><au>Achard, J</au><au>Berger-By, G</au><au>Bouquey, F</au><au>El Khaldi, M</au><au>Guilhem, D</au><au>Goletto, C</au><au>Hillairet, J</au><au>Magne, R</au><au>Marfisi, L</au><au>Mollard, P</au><au>Negrier, V</au><au>Poli, S</au><au>Prou, M</au><au>Samaille, F</au><au>Volpe, D</au><au>Kazarian, F</au><au>Beunas, A</au><au>Boghossian, E</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System</atitle><btitle>AIP conference proceedings</btitle><date>2009-01-01</date><risdate>2009</risdate><volume>1187</volume><issue>1</issue><spage>431</spage><epage>434</epage><pages>431-434</pages><issn>0094-243X</issn><eissn>1551-7616</eissn><isbn>9780735407534</isbn><isbn>0735407533</isbn><abstract>The upgraded 3.7 GHz Lower Hybrid Current Drive (LHCD) system for the Tore Supra (TS) tokamak is in the process of installation [1]. When complete, it will permit long pulse injection (1000s) at coupled power level up to 6,5 MW. Steady state operation of high power RF sources and components is challenging and requires careful validation before the system can be commissioned on the tokamak. Results on the validation of CW klystrons, improvements on the RF components forming part of the power generation circuit and the development of an RF water load to sustain CW pulses under 700kW RF power are presented.</abstract><cop>United States</cop><doi>10.1063/1.3273785</doi><tpages>4</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP conference proceedings, 2009, Vol.1187 (1), p.431-434
issn 0094-243X
1551-7616
language eng
recordid cdi_osti_scitechconnect_21335762
source AIP Journals Complete
subjects 70 PLASMA PHYSICS AND FUSION TECHNOLOGY
GHZ RANGE
KLYSTRONS
LOWER HYBRID CURRENT DRIVE
PLASMA
PULSES
RF SYSTEMS
STEADY-STATE CONDITIONS
TORE SUPRA TOKAMAK
WAVEGUIDES
title Validation of CW High Power Sources and RF Components for the Tore Supra LHCD System
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T11%3A55%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_osti_&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Validation%20of%20CW%20High%20Power%20Sources%20and%20RF%20Components%20for%20the%20Tore%20Supra%20LHCD%20System&rft.btitle=AIP%20conference%20proceedings&rft.au=Delpech,%20L&rft.date=2009-01-01&rft.volume=1187&rft.issue=1&rft.spage=431&rft.epage=434&rft.pages=431-434&rft.issn=0094-243X&rft.eissn=1551-7616&rft.isbn=9780735407534&rft.isbn_list=0735407533&rft_id=info:doi/10.1063/1.3273785&rft_dat=%3Cproquest_osti_%3E743550558%3C/proquest_osti_%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=743550558&rft_id=info:pmid/&rfr_iscdi=true