Advancement of LANSCE accelerator facility as a 1-MW Fusion Prototypic Neutron Source

The Fusion Prototypic Neutron Source (FPNS) is considered to be a testbed for scientific understanding of material degradation in future nuclear fusion reactors (Zinkle and Moeslang, 2013; Summary Report on the FPNS Workshop, 2018; Pitcher et al., 2019). The primary mission of FPNS is to provide a d...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 2020-04, Vol.960 (C), p.163569, Article 163569
Hauptverfasser: Batygin, Yuri K., Pitcher, Eric J.
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The Fusion Prototypic Neutron Source (FPNS) is considered to be a testbed for scientific understanding of material degradation in future nuclear fusion reactors (Zinkle and Moeslang, 2013; Summary Report on the FPNS Workshop, 2018; Pitcher et al., 2019). The primary mission of FPNS is to provide a damage rate in iron samples of 8-11 dpa/calendar year with He/dpa ratio of ∼10 appm in irradiation volume of 50 cm3 or larger with irradiation temperature 300–1000 °C and flux gradient less than 20%/cm in the plane of the sample. The Los Alamos Neutron Science Center (LANSCE) is an attractive candidate for the FPNS project. The Accelerator Facility was designed and operated for an extended period as a 0.8-MW Meson Factory. The existing setup of the LANSCE accelerator complex can nearly fulfill requirements of the fusion neutron source station. The primary function of the upgraded accelerator systems is the safe and reliable delivery of a 1.25-mA continuous proton beam current at 800-MeV beam energy from the switchyard to the target assembly to create 1 MW power of proton beam interacting with a solid tungsten target. The present study describes existing accelerator setup and further development required to meet the needs of FPNS project.
ISSN:0168-9002
1872-9576
DOI:10.1016/j.nima.2020.163569