The Wendelstein 7-X trim coil system commissioning and first operational results

•The Wendelstein 7-X stellarator fusion experiment has a normal conducting trim coil system, consisting of 5 coils.•The paper explains briefly the commissioning steps of the trim coil system performed in December 2014 during the first operational phase of Wendelstein 7-X.•The trim coil system were u...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fusion engineering and design 2017-11, Vol.124 (C), p.94-98
Hauptverfasser: Füllenbach, F., Risse, K., Rummel, T., Fricke, M., Köster, E., Bosch, H.-S., Lazerson, S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!