First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility

The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Physical review special topics. PRST-AB. Accelerators and beams 2012-06, Vol.13 (9)
Hauptverfasser: Bai, Sha, /Beijing, Inst. High Energy Phys, Aryshev, Alexander, /KEK, Tsukuba, Bambade, Philip, /KEK, Tsukuba /Orsay, IPN, McCormick, Doug, /SLAC, Bolzon, Benoit, /Annecy, LAPP, Gao, Jie, Tauchi, Toshiaki, Zhou, Feng
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 9
container_start_page
container_title Physical review special topics. PRST-AB. Accelerators and beams
container_volume 13
creator Bai, Sha
/Beijing, Inst. High Energy Phys
Aryshev, Alexander
/KEK, Tsukuba
Bambade, Philip
/KEK, Tsukuba /Orsay, IPN
McCormick, Doug
/SLAC
Bolzon, Benoit
/Annecy, LAPP
Gao, Jie
Tauchi, Toshiaki
Zhou, Feng
description The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.
format Article
fullrecord <record><control><sourceid>osti</sourceid><recordid>TN_cdi_osti_scitechconnect_1043836</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1043836</sourcerecordid><originalsourceid>FETCH-osti_scitechconnect_10438363</originalsourceid><addsrcrecordid>eNqNjMsKwjAQRYMoWB__MLgXUhOkLlUMQnUnuCwhjHSkTSEzXfj3irpw6eoeuIczUFmuN8XSWr0a_vBYTZjvWufGWJupylFigR36Fq6eXnhGz33CFqMwUASpERxF34DrQs8f9UQRwcv7LA8lbEPABpOXLsEFXxXnAzUkj5ka3XzDOP_uVC3c4bI_LjsWqjiQYKhDFyMGqXJtTWHW5i_pCTq2Q-k</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility</title><source>DOAJ Directory of Open Access Journals</source><source>American Physical Society Journals</source><creator>Bai, Sha ; /Beijing, Inst. High Energy Phys ; Aryshev, Alexander ; /KEK, Tsukuba ; Bambade, Philip ; /KEK, Tsukuba /Orsay, IPN ; McCormick, Doug ; /SLAC ; Bolzon, Benoit ; /Annecy, LAPP ; Gao, Jie ; Tauchi, Toshiaki ; Zhou, Feng</creator><creatorcontrib>Bai, Sha ; /Beijing, Inst. High Energy Phys ; Aryshev, Alexander ; /KEK, Tsukuba ; Bambade, Philip ; /KEK, Tsukuba /Orsay, IPN ; McCormick, Doug ; /SLAC ; Bolzon, Benoit ; /Annecy, LAPP ; Gao, Jie ; Tauchi, Toshiaki ; Zhou, Feng ; SLAC National Accelerator Lab., Menlo Park, CA (United States)</creatorcontrib><description>The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.</description><identifier>ISSN: 1098-4402</identifier><identifier>EISSN: 1098-4402</identifier><language>eng</language><publisher>United States</publisher><subject>ACCELERATORS ; Accelerators,ACCPHY ; COMMISSIONING ; CONSTRUCTION ; DESIGN ; LINEAR COLLIDERS ; OPTICS ; PARTICLE ACCELERATORS ; TUNGSTEN ; TUNING</subject><ispartof>Physical review special topics. PRST-AB. Accelerators and beams, 2012-06, Vol.13 (9)</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,780,784,885</link.rule.ids><backlink>$$Uhttps://www.osti.gov/biblio/1043836$$D View this record in Osti.gov$$Hfree_for_read</backlink></links><search><creatorcontrib>Bai, Sha</creatorcontrib><creatorcontrib>/Beijing, Inst. High Energy Phys</creatorcontrib><creatorcontrib>Aryshev, Alexander</creatorcontrib><creatorcontrib>/KEK, Tsukuba</creatorcontrib><creatorcontrib>Bambade, Philip</creatorcontrib><creatorcontrib>/KEK, Tsukuba /Orsay, IPN</creatorcontrib><creatorcontrib>McCormick, Doug</creatorcontrib><creatorcontrib>/SLAC</creatorcontrib><creatorcontrib>Bolzon, Benoit</creatorcontrib><creatorcontrib>/Annecy, LAPP</creatorcontrib><creatorcontrib>Gao, Jie</creatorcontrib><creatorcontrib>Tauchi, Toshiaki</creatorcontrib><creatorcontrib>Zhou, Feng</creatorcontrib><creatorcontrib>SLAC National Accelerator Lab., Menlo Park, CA (United States)</creatorcontrib><title>First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility</title><title>Physical review special topics. PRST-AB. Accelerators and beams</title><description>The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.</description><subject>ACCELERATORS</subject><subject>Accelerators,ACCPHY</subject><subject>COMMISSIONING</subject><subject>CONSTRUCTION</subject><subject>DESIGN</subject><subject>LINEAR COLLIDERS</subject><subject>OPTICS</subject><subject>PARTICLE ACCELERATORS</subject><subject>TUNGSTEN</subject><subject>TUNING</subject><issn>1098-4402</issn><issn>1098-4402</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><recordid>eNqNjMsKwjAQRYMoWB__MLgXUhOkLlUMQnUnuCwhjHSkTSEzXfj3irpw6eoeuIczUFmuN8XSWr0a_vBYTZjvWufGWJupylFigR36Fq6eXnhGz33CFqMwUASpERxF34DrQs8f9UQRwcv7LA8lbEPABpOXLsEFXxXnAzUkj5ka3XzDOP_uVC3c4bI_LjsWqjiQYKhDFyMGqXJtTWHW5i_pCTq2Q-k</recordid><startdate>20120622</startdate><enddate>20120622</enddate><creator>Bai, Sha</creator><creator>/Beijing, Inst. High Energy Phys</creator><creator>Aryshev, Alexander</creator><creator>/KEK, Tsukuba</creator><creator>Bambade, Philip</creator><creator>/KEK, Tsukuba /Orsay, IPN</creator><creator>McCormick, Doug</creator><creator>/SLAC</creator><creator>Bolzon, Benoit</creator><creator>/Annecy, LAPP</creator><creator>Gao, Jie</creator><creator>Tauchi, Toshiaki</creator><creator>Zhou, Feng</creator><scope>OTOTI</scope></search><sort><creationdate>20120622</creationdate><title>First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility</title><author>Bai, Sha ; /Beijing, Inst. High Energy Phys ; Aryshev, Alexander ; /KEK, Tsukuba ; Bambade, Philip ; /KEK, Tsukuba /Orsay, IPN ; McCormick, Doug ; /SLAC ; Bolzon, Benoit ; /Annecy, LAPP ; Gao, Jie ; Tauchi, Toshiaki ; Zhou, Feng</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-osti_scitechconnect_10438363</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2012</creationdate><topic>ACCELERATORS</topic><topic>Accelerators,ACCPHY</topic><topic>COMMISSIONING</topic><topic>CONSTRUCTION</topic><topic>DESIGN</topic><topic>LINEAR COLLIDERS</topic><topic>OPTICS</topic><topic>PARTICLE ACCELERATORS</topic><topic>TUNGSTEN</topic><topic>TUNING</topic><toplevel>online_resources</toplevel><creatorcontrib>Bai, Sha</creatorcontrib><creatorcontrib>/Beijing, Inst. High Energy Phys</creatorcontrib><creatorcontrib>Aryshev, Alexander</creatorcontrib><creatorcontrib>/KEK, Tsukuba</creatorcontrib><creatorcontrib>Bambade, Philip</creatorcontrib><creatorcontrib>/KEK, Tsukuba /Orsay, IPN</creatorcontrib><creatorcontrib>McCormick, Doug</creatorcontrib><creatorcontrib>/SLAC</creatorcontrib><creatorcontrib>Bolzon, Benoit</creatorcontrib><creatorcontrib>/Annecy, LAPP</creatorcontrib><creatorcontrib>Gao, Jie</creatorcontrib><creatorcontrib>Tauchi, Toshiaki</creatorcontrib><creatorcontrib>Zhou, Feng</creatorcontrib><creatorcontrib>SLAC National Accelerator Lab., Menlo Park, CA (United States)</creatorcontrib><collection>OSTI.GOV</collection><jtitle>Physical review special topics. PRST-AB. Accelerators and beams</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Bai, Sha</au><au>/Beijing, Inst. High Energy Phys</au><au>Aryshev, Alexander</au><au>/KEK, Tsukuba</au><au>Bambade, Philip</au><au>/KEK, Tsukuba /Orsay, IPN</au><au>McCormick, Doug</au><au>/SLAC</au><au>Bolzon, Benoit</au><au>/Annecy, LAPP</au><au>Gao, Jie</au><au>Tauchi, Toshiaki</au><au>Zhou, Feng</au><aucorp>SLAC National Accelerator Lab., Menlo Park, CA (United States)</aucorp><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility</atitle><jtitle>Physical review special topics. PRST-AB. Accelerators and beams</jtitle><date>2012-06-22</date><risdate>2012</risdate><volume>13</volume><issue>9</issue><issn>1098-4402</issn><eissn>1098-4402</eissn><abstract>The ATF2 project is the final focus system prototype for the ILC and CLIC linear collider projects, with a purpose to reach a 37 nm vertical beam size at the interaction point using compact optics based on a novel scheme of local chromaticity correction. Construction of all components and installation were completed at the end of 2008. An initial commissioning phase followed in 2009, using larger than nominal {beta} functions at the interaction point, corresponding to reduced demagnification factors in comparison to the design, to limit effects from higher-order optical aberrations and hence simplify beam tuning procedures while key instrumentation was being tested and calibrated. In this paper, first measurements of dispersion and Twiss parameters are presented based on scanning the beam during this period with a set of tungsten wires located just behind the interaction point, using two complementary analysis methods.</abstract><cop>United States</cop></addata></record>
fulltext fulltext
identifier ISSN: 1098-4402
ispartof Physical review special topics. PRST-AB. Accelerators and beams, 2012-06, Vol.13 (9)
issn 1098-4402
1098-4402
language eng
recordid cdi_osti_scitechconnect_1043836
source DOAJ Directory of Open Access Journals; American Physical Society Journals
subjects ACCELERATORS
Accelerators,ACCPHY
COMMISSIONING
CONSTRUCTION
DESIGN
LINEAR COLLIDERS
OPTICS
PARTICLE ACCELERATORS
TUNGSTEN
TUNING
title First Beam Waist Measurements in the Final Focus Beam Line at the KEK Accelerator Test Facility
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T00%3A21%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-osti&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=First%20Beam%20Waist%20Measurements%20in%20the%20Final%20Focus%20Beam%20Line%20at%20the%20KEK%20Accelerator%20Test%20Facility&rft.jtitle=Physical%20review%20special%20topics.%20PRST-AB.%20Accelerators%20and%20beams&rft.au=Bai,%20Sha&rft.aucorp=SLAC%20National%20Accelerator%20Lab.,%20Menlo%20Park,%20CA%20(United%20States)&rft.date=2012-06-22&rft.volume=13&rft.issue=9&rft.issn=1098-4402&rft.eissn=1098-4402&rft_id=info:doi/&rft_dat=%3Costi%3E1043836%3C/osti%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true