Closed Loop Requirements and Analysis Management
Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocati...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Lamoreaux, Michael Verhoef, Brett |
description | Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed. |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>nasa_CYI</sourceid><recordid>TN_cdi_nasa_ntrs_20150009414</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>20150009414</sourcerecordid><originalsourceid>FETCH-nasa_ntrs_201500094143</originalsourceid><addsrcrecordid>eNrjZDBwzskvTk1R8MnPL1AISi0szSxKzU3NKylWSMxLUXDMS8ypLM4sVvBNzEtMB0vwMLCmJeYUp_JCaW4GGTfXEGcP3bzE4sT4vJKi4ngjA0NTAwMDSxNDE2MC0gB_XicF</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Closed Loop Requirements and Analysis Management</title><source>NASA Technical Reports Server</source><creator>Lamoreaux, Michael ; Verhoef, Brett</creator><creatorcontrib>Lamoreaux, Michael ; Verhoef, Brett</creatorcontrib><description>Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.</description><language>eng</language><publisher>Marshall Space Flight Center</publisher><subject>Computer Programming And Software</subject><creationdate>2015</creationdate><rights>Copyright Determination: PUBLIC_USE_PERMITTED</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,776,796</link.rule.ids><linktorsrc>$$Uhttps://ntrs.nasa.gov/citations/20150009414$$EView_record_in_NASA$$FView_record_in_$$GNASA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Lamoreaux, Michael</creatorcontrib><creatorcontrib>Verhoef, Brett</creatorcontrib><title>Closed Loop Requirements and Analysis Management</title><description>Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.</description><subject>Computer Programming And Software</subject><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2015</creationdate><recordtype>conference_proceeding</recordtype><sourceid>CYI</sourceid><recordid>eNrjZDBwzskvTk1R8MnPL1AISi0szSxKzU3NKylWSMxLUXDMS8ypLM4sVvBNzEtMB0vwMLCmJeYUp_JCaW4GGTfXEGcP3bzE4sT4vJKi4ngjA0NTAwMDSxNDE2MC0gB_XicF</recordid><startdate>20150430</startdate><enddate>20150430</enddate><creator>Lamoreaux, Michael</creator><creator>Verhoef, Brett</creator><scope>CYE</scope><scope>CYI</scope></search><sort><creationdate>20150430</creationdate><title>Closed Loop Requirements and Analysis Management</title><author>Lamoreaux, Michael ; Verhoef, Brett</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-nasa_ntrs_201500094143</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Computer Programming And Software</topic><toplevel>online_resources</toplevel><creatorcontrib>Lamoreaux, Michael</creatorcontrib><creatorcontrib>Verhoef, Brett</creatorcontrib><collection>NASA Scientific and Technical Information</collection><collection>NASA Technical Reports Server</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Lamoreaux, Michael</au><au>Verhoef, Brett</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Closed Loop Requirements and Analysis Management</atitle><date>2015-04-30</date><risdate>2015</risdate><abstract>Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.</abstract><cop>Marshall Space Flight Center</cop><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_nasa_ntrs_20150009414 |
source | NASA Technical Reports Server |
subjects | Computer Programming And Software |
title | Closed Loop Requirements and Analysis Management |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T17%3A45%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-nasa_CYI&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Closed%20Loop%20Requirements%20and%20Analysis%20Management&rft.au=Lamoreaux,%20Michael&rft.date=2015-04-30&rft_id=info:doi/&rft_dat=%3Cnasa_CYI%3E20150009414%3C/nasa_CYI%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |