RSRM Segment Train Derailment and Recovery

On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying Reusable Solid Rocket Motors (RSRM) 98 center and forward segments (STS-120) and RSRM 99 aft segments (STS-122)....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Taylor Jr, Robert H., McConnaugghey, Paul K., Beaman, David E., Moore, Dennis R., Reed, Harry
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Taylor Jr, Robert H.
McConnaugghey, Paul K.
Beaman, David E.
Moore, Dennis R.
Reed, Harry
description On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying Reusable Solid Rocket Motors (RSRM) 98 center and forward segments (STS-120) and RSRM 99 aft segments (STS-122). Initially, it was not known if the segments had been seriously damaged. Four segments dropped approximately 10 feet when the trestle collapsed and one of those four rolled off the track onto its side. The exit cones and the other four segments, not yet on the trestle, remained on solid ground. ATK and NASA immediately dispatched an investigation and recovery team to determine the safety of the situation and eventually the usability of the segments and exit cones for flight. Instrumentation on each segment provided invaluable data to determine the acceleration loads imparted into each loaded segment and exit cone. This paper details the incident, recovery plan and the team work that created a success story that ended with the safe launch of STS120 using the four center segments and the launch of STS122 using the Aft exit cones assemblies.
format Conference Proceeding
fullrecord <record><control><sourceid>nasa_CYI</sourceid><recordid>TN_cdi_nasa_ntrs_20080032810</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>20080032810</sourcerecordid><originalsourceid>FETCH-nasa_ntrs_200800328103</originalsourceid><addsrcrecordid>eNrjZNAKCg7yVQhOTc9NzStRCClKzMxTcEkFUjlggcS8FIWg1OT8stSiSh4G1rTEnOJUXijNzSDj5hri7KGbl1icGJ9XUlQcb2RgYGFgYGxkYWhgTEAaACcYJCs</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>RSRM Segment Train Derailment and Recovery</title><source>NASA Technical Reports Server</source><creator>Taylor Jr, Robert H. ; McConnaugghey, Paul K. ; Beaman, David E. ; Moore, Dennis R. ; Reed, Harry</creator><creatorcontrib>Taylor Jr, Robert H. ; McConnaugghey, Paul K. ; Beaman, David E. ; Moore, Dennis R. ; Reed, Harry</creatorcontrib><description>On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying Reusable Solid Rocket Motors (RSRM) 98 center and forward segments (STS-120) and RSRM 99 aft segments (STS-122). Initially, it was not known if the segments had been seriously damaged. Four segments dropped approximately 10 feet when the trestle collapsed and one of those four rolled off the track onto its side. The exit cones and the other four segments, not yet on the trestle, remained on solid ground. ATK and NASA immediately dispatched an investigation and recovery team to determine the safety of the situation and eventually the usability of the segments and exit cones for flight. Instrumentation on each segment provided invaluable data to determine the acceleration loads imparted into each loaded segment and exit cone. This paper details the incident, recovery plan and the team work that created a success story that ended with the safe launch of STS120 using the four center segments and the launch of STS122 using the Aft exit cones assemblies.</description><language>eng</language><publisher>Marshall Space Flight Center</publisher><subject>Ground Support Systems And Facilities (Space)</subject><creationdate>2008</creationdate><rights>Copyright Determination: PUBLIC_USE_PERMITTED</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,780,800</link.rule.ids><linktorsrc>$$Uhttps://ntrs.nasa.gov/citations/20080032810$$EView_record_in_NASA$$FView_record_in_$$GNASA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Taylor Jr, Robert H.</creatorcontrib><creatorcontrib>McConnaugghey, Paul K.</creatorcontrib><creatorcontrib>Beaman, David E.</creatorcontrib><creatorcontrib>Moore, Dennis R.</creatorcontrib><creatorcontrib>Reed, Harry</creatorcontrib><title>RSRM Segment Train Derailment and Recovery</title><description>On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying Reusable Solid Rocket Motors (RSRM) 98 center and forward segments (STS-120) and RSRM 99 aft segments (STS-122). Initially, it was not known if the segments had been seriously damaged. Four segments dropped approximately 10 feet when the trestle collapsed and one of those four rolled off the track onto its side. The exit cones and the other four segments, not yet on the trestle, remained on solid ground. ATK and NASA immediately dispatched an investigation and recovery team to determine the safety of the situation and eventually the usability of the segments and exit cones for flight. Instrumentation on each segment provided invaluable data to determine the acceleration loads imparted into each loaded segment and exit cone. This paper details the incident, recovery plan and the team work that created a success story that ended with the safe launch of STS120 using the four center segments and the launch of STS122 using the Aft exit cones assemblies.</description><subject>Ground Support Systems And Facilities (Space)</subject><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2008</creationdate><recordtype>conference_proceeding</recordtype><sourceid>CYI</sourceid><recordid>eNrjZNAKCg7yVQhOTc9NzStRCClKzMxTcEkFUjlggcS8FIWg1OT8stSiSh4G1rTEnOJUXijNzSDj5hri7KGbl1icGJ9XUlQcb2RgYGFgYGxkYWhgTEAaACcYJCs</recordid><startdate>20080512</startdate><enddate>20080512</enddate><creator>Taylor Jr, Robert H.</creator><creator>McConnaugghey, Paul K.</creator><creator>Beaman, David E.</creator><creator>Moore, Dennis R.</creator><creator>Reed, Harry</creator><scope>CYE</scope><scope>CYI</scope></search><sort><creationdate>20080512</creationdate><title>RSRM Segment Train Derailment and Recovery</title><author>Taylor Jr, Robert H. ; McConnaugghey, Paul K. ; Beaman, David E. ; Moore, Dennis R. ; Reed, Harry</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-nasa_ntrs_200800328103</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2008</creationdate><topic>Ground Support Systems And Facilities (Space)</topic><toplevel>online_resources</toplevel><creatorcontrib>Taylor Jr, Robert H.</creatorcontrib><creatorcontrib>McConnaugghey, Paul K.</creatorcontrib><creatorcontrib>Beaman, David E.</creatorcontrib><creatorcontrib>Moore, Dennis R.</creatorcontrib><creatorcontrib>Reed, Harry</creatorcontrib><collection>NASA Scientific and Technical Information</collection><collection>NASA Technical Reports Server</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Taylor Jr, Robert H.</au><au>McConnaugghey, Paul K.</au><au>Beaman, David E.</au><au>Moore, Dennis R.</au><au>Reed, Harry</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>RSRM Segment Train Derailment and Recovery</atitle><date>2008-05-12</date><risdate>2008</risdate><abstract>On May 2, 2007, a freight train carrying segments of the space shuttle's solid rocket boosters derailed in Myrtlewood, Alabama, after a rail trestle collapsed. The train was carrying Reusable Solid Rocket Motors (RSRM) 98 center and forward segments (STS-120) and RSRM 99 aft segments (STS-122). Initially, it was not known if the segments had been seriously damaged. Four segments dropped approximately 10 feet when the trestle collapsed and one of those four rolled off the track onto its side. The exit cones and the other four segments, not yet on the trestle, remained on solid ground. ATK and NASA immediately dispatched an investigation and recovery team to determine the safety of the situation and eventually the usability of the segments and exit cones for flight. Instrumentation on each segment provided invaluable data to determine the acceleration loads imparted into each loaded segment and exit cone. This paper details the incident, recovery plan and the team work that created a success story that ended with the safe launch of STS120 using the four center segments and the launch of STS122 using the Aft exit cones assemblies.</abstract><cop>Marshall Space Flight Center</cop><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_nasa_ntrs_20080032810
source NASA Technical Reports Server
subjects Ground Support Systems And Facilities (Space)
title RSRM Segment Train Derailment and Recovery
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T05%3A14%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-nasa_CYI&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=RSRM%20Segment%20Train%20Derailment%20and%20Recovery&rft.au=Taylor%20Jr,%20Robert%20H.&rft.date=2008-05-12&rft_id=info:doi/&rft_dat=%3Cnasa_CYI%3E20080032810%3C/nasa_CYI%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true