Building Operations Efficiencies into NASA's Crew Launch Vehicle Design
The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Dumbacher, Daniel L. |
description | The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers. |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>nasa_CYI</sourceid><recordid>TN_cdi_nasa_ntrs_20070001985</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>20070001985</sourcerecordid><originalsourceid>FETCH-nasa_ntrs_200700019853</originalsourceid><addsrcrecordid>eNrjZHB3Ks3MScnMS1fwL0gtSizJzM8rVnBNS8tMzkzNA-Jihcy8knwFP8dgR_ViBeei1HIFn8TSvOQMhbDUjMzknFQFl9TizPQ8HgbWtMSc4lReKM3NIOPmGuLsoZuXWJwYn1dSVBxvZGBgbmBgYGhpYWpMQBoAzbkuqA</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Building Operations Efficiencies into NASA's Crew Launch Vehicle Design</title><source>NASA Technical Reports Server</source><creator>Dumbacher, Daniel L.</creator><creatorcontrib>Dumbacher, Daniel L.</creatorcontrib><description>The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.</description><language>eng</language><publisher>Marshall Space Flight Center</publisher><subject>Launch Vehicles And Launch Operations</subject><creationdate>2006</creationdate><rights>Copyright Determination: GOV_PUBLIC_USE_PERMITTED</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>309,780,800</link.rule.ids><linktorsrc>$$Uhttps://ntrs.nasa.gov/citations/20070001985$$EView_record_in_NASA$$FView_record_in_$$GNASA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Dumbacher, Daniel L.</creatorcontrib><title>Building Operations Efficiencies into NASA's Crew Launch Vehicle Design</title><description>The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.</description><subject>Launch Vehicles And Launch Operations</subject><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2006</creationdate><recordtype>conference_proceeding</recordtype><sourceid>CYI</sourceid><recordid>eNrjZHB3Ks3MScnMS1fwL0gtSizJzM8rVnBNS8tMzkzNA-Jihcy8knwFP8dgR_ViBeei1HIFn8TSvOQMhbDUjMzknFQFl9TizPQ8HgbWtMSc4lReKM3NIOPmGuLsoZuXWJwYn1dSVBxvZGBgbmBgYGhpYWpMQBoAzbkuqA</recordid><startdate>20060101</startdate><enddate>20060101</enddate><creator>Dumbacher, Daniel L.</creator><scope>CYE</scope><scope>CYI</scope></search><sort><creationdate>20060101</creationdate><title>Building Operations Efficiencies into NASA's Crew Launch Vehicle Design</title><author>Dumbacher, Daniel L.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-nasa_ntrs_200700019853</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2006</creationdate><topic>Launch Vehicles And Launch Operations</topic><toplevel>online_resources</toplevel><creatorcontrib>Dumbacher, Daniel L.</creatorcontrib><collection>NASA Scientific and Technical Information</collection><collection>NASA Technical Reports Server</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Dumbacher, Daniel L.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Building Operations Efficiencies into NASA's Crew Launch Vehicle Design</atitle><date>2006-01-01</date><risdate>2006</risdate><abstract>The U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.</abstract><cop>Marshall Space Flight Center</cop><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_nasa_ntrs_20070001985 |
source | NASA Technical Reports Server |
subjects | Launch Vehicles And Launch Operations |
title | Building Operations Efficiencies into NASA's Crew Launch Vehicle Design |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T17%3A41%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-nasa_CYI&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Building%20Operations%20Efficiencies%20into%20NASA's%20Crew%20Launch%20Vehicle%20Design&rft.au=Dumbacher,%20Daniel%20L.&rft.date=2006-01-01&rft_id=info:doi/&rft_dat=%3Cnasa_CYI%3E20070001985%3C/nasa_CYI%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |