Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel

This center operates a number of sophisticated wind tunnels in order to fulfill the needs of its researchers. Compressed air, which is kept in steel storage vessels, is used to power many of these tunnels. Some of these vessels have been in use for many years, and Langley is currently recertifying t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Hudson, C. M., Girouard, R. L., Young, C. P., Jr, Petley, D. H., Hudson, J. L., Jr, Hudgins, J. L.
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Hudson, C. M.
Girouard, R. L.
Young, C. P., Jr
Petley, D. H.
Hudson, J. L., Jr
Hudgins, J. L.
description This center operates a number of sophisticated wind tunnels in order to fulfill the needs of its researchers. Compressed air, which is kept in steel storage vessels, is used to power many of these tunnels. Some of these vessels have been in use for many years, and Langley is currently recertifying these vessels to insure their continued structural integrity. One of the first facilities to be recertified under this program was the Langley 8-foot high-temperature structures tunnel. This recertification involved (1) modification, hydrotesting, and inspection of the vessels; (2) repair of all relevant defects; (3) comparison of the original design of the vessel with the current design criteria of Section 8, Division 2, of the 1974 ASME Boiler and Pressure Vessel Code; (4) fracture-mechanics, thermal, and wind-induced vibration analyses of the vessels; and (5) development of operating envelopes and a future inspection plan for the vessels. Following these modifications, analyses, and tests, the vessels were recertified for operation at full design pressure (41.4 MPa (6000 psi)) within the operating envelope developed.
format Report
fullrecord <record><control><sourceid>nasa_CYI</sourceid><recordid>TN_cdi_nasa_ntrs_19770010521</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>19770010521</sourcerecordid><originalsourceid>FETCH-nasa_ntrs_197700105213</originalsourceid><addsrcrecordid>eNqFizEKwkAQRdNYiHoDi7lAYKNItBbFwkrsw7DOZhc2szIzEby9ROyt_oP3_rwqN_IklkLyaKkwlAAWCTAJID9gIIvIBGpFsCd4kSplBbRvdkXuM71hX4dSDGLqY200PEnQRpluMvqJFGxkprysZgGz0uq3i2p9Pt2Pl5pRsWMT7ZpD2zrXuN2m2f7RHz98PvY</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel</title><source>NASA Technical Reports Server</source><creator>Hudson, C. M. ; Girouard, R. L. ; Young, C. P., Jr ; Petley, D. H. ; Hudson, J. L., Jr ; Hudgins, J. L.</creator><creatorcontrib>Hudson, C. M. ; Girouard, R. L. ; Young, C. P., Jr ; Petley, D. H. ; Hudson, J. L., Jr ; Hudgins, J. L.</creatorcontrib><description>This center operates a number of sophisticated wind tunnels in order to fulfill the needs of its researchers. Compressed air, which is kept in steel storage vessels, is used to power many of these tunnels. Some of these vessels have been in use for many years, and Langley is currently recertifying these vessels to insure their continued structural integrity. One of the first facilities to be recertified under this program was the Langley 8-foot high-temperature structures tunnel. This recertification involved (1) modification, hydrotesting, and inspection of the vessels; (2) repair of all relevant defects; (3) comparison of the original design of the vessel with the current design criteria of Section 8, Division 2, of the 1974 ASME Boiler and Pressure Vessel Code; (4) fracture-mechanics, thermal, and wind-induced vibration analyses of the vessels; and (5) development of operating envelopes and a future inspection plan for the vessels. Following these modifications, analyses, and tests, the vessels were recertified for operation at full design pressure (41.4 MPa (6000 psi)) within the operating envelope developed.</description><language>eng</language><publisher>Legacy CDMS</publisher><subject>Mechanical Engineering</subject><creationdate>1977</creationdate><rights>Copyright Determination: GOV_PUBLIC_USE_PERMITTED</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>776,796</link.rule.ids><linktorsrc>$$Uhttps://ntrs.nasa.gov/citations/19770010521$$EView_record_in_NASA$$FView_record_in_$$GNASA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hudson, C. M.</creatorcontrib><creatorcontrib>Girouard, R. L.</creatorcontrib><creatorcontrib>Young, C. P., Jr</creatorcontrib><creatorcontrib>Petley, D. H.</creatorcontrib><creatorcontrib>Hudson, J. L., Jr</creatorcontrib><creatorcontrib>Hudgins, J. L.</creatorcontrib><title>Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel</title><description>This center operates a number of sophisticated wind tunnels in order to fulfill the needs of its researchers. Compressed air, which is kept in steel storage vessels, is used to power many of these tunnels. Some of these vessels have been in use for many years, and Langley is currently recertifying these vessels to insure their continued structural integrity. One of the first facilities to be recertified under this program was the Langley 8-foot high-temperature structures tunnel. This recertification involved (1) modification, hydrotesting, and inspection of the vessels; (2) repair of all relevant defects; (3) comparison of the original design of the vessel with the current design criteria of Section 8, Division 2, of the 1974 ASME Boiler and Pressure Vessel Code; (4) fracture-mechanics, thermal, and wind-induced vibration analyses of the vessels; and (5) development of operating envelopes and a future inspection plan for the vessels. Following these modifications, analyses, and tests, the vessels were recertified for operation at full design pressure (41.4 MPa (6000 psi)) within the operating envelope developed.</description><subject>Mechanical Engineering</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1977</creationdate><recordtype>report</recordtype><sourceid>CYI</sourceid><recordid>eNqFizEKwkAQRdNYiHoDi7lAYKNItBbFwkrsw7DOZhc2szIzEby9ROyt_oP3_rwqN_IklkLyaKkwlAAWCTAJID9gIIvIBGpFsCd4kSplBbRvdkXuM71hX4dSDGLqY200PEnQRpluMvqJFGxkprysZgGz0uq3i2p9Pt2Pl5pRsWMT7ZpD2zrXuN2m2f7RHz98PvY</recordid><startdate>19770201</startdate><enddate>19770201</enddate><creator>Hudson, C. M.</creator><creator>Girouard, R. L.</creator><creator>Young, C. P., Jr</creator><creator>Petley, D. H.</creator><creator>Hudson, J. L., Jr</creator><creator>Hudgins, J. L.</creator><scope>CYE</scope><scope>CYI</scope></search><sort><creationdate>19770201</creationdate><title>Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel</title><author>Hudson, C. M. ; Girouard, R. L. ; Young, C. P., Jr ; Petley, D. H. ; Hudson, J. L., Jr ; Hudgins, J. L.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-nasa_ntrs_197700105213</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1977</creationdate><topic>Mechanical Engineering</topic><toplevel>online_resources</toplevel><creatorcontrib>Hudson, C. M.</creatorcontrib><creatorcontrib>Girouard, R. L.</creatorcontrib><creatorcontrib>Young, C. P., Jr</creatorcontrib><creatorcontrib>Petley, D. H.</creatorcontrib><creatorcontrib>Hudson, J. L., Jr</creatorcontrib><creatorcontrib>Hudgins, J. L.</creatorcontrib><collection>NASA Scientific and Technical Information</collection><collection>NASA Technical Reports Server</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hudson, C. M.</au><au>Girouard, R. L.</au><au>Young, C. P., Jr</au><au>Petley, D. H.</au><au>Hudson, J. L., Jr</au><au>Hudgins, J. L.</au><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel</btitle><date>1977-02-01</date><risdate>1977</risdate><abstract>This center operates a number of sophisticated wind tunnels in order to fulfill the needs of its researchers. Compressed air, which is kept in steel storage vessels, is used to power many of these tunnels. Some of these vessels have been in use for many years, and Langley is currently recertifying these vessels to insure their continued structural integrity. One of the first facilities to be recertified under this program was the Langley 8-foot high-temperature structures tunnel. This recertification involved (1) modification, hydrotesting, and inspection of the vessels; (2) repair of all relevant defects; (3) comparison of the original design of the vessel with the current design criteria of Section 8, Division 2, of the 1974 ASME Boiler and Pressure Vessel Code; (4) fracture-mechanics, thermal, and wind-induced vibration analyses of the vessels; and (5) development of operating envelopes and a future inspection plan for the vessels. Following these modifications, analyses, and tests, the vessels were recertified for operation at full design pressure (41.4 MPa (6000 psi)) within the operating envelope developed.</abstract><cop>Legacy CDMS</cop><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_nasa_ntrs_19770010521
source NASA Technical Reports Server
subjects Mechanical Engineering
title Recertification of the air and methane storage vessels at the Langley 8-foot high-temperature structures tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T05%3A19%3A35IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-nasa_CYI&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Recertification%20of%20the%20air%20and%20methane%20storage%20vessels%20at%20the%20Langley%208-foot%20high-temperature%20structures%20tunnel&rft.au=Hudson,%20C.%20M.&rft.date=1977-02-01&rft_id=info:doi/&rft_dat=%3Cnasa_CYI%3E19770010521%3C/nasa_CYI%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true