Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations
In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the beh...
Gespeichert in:
Veröffentlicht in: | Journal of International Council of Electrical Engineering 2012, Vol.2 (3), p.283-289 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | kor |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 289 |
---|---|
container_issue | 3 |
container_start_page | 283 |
container_title | Journal of International Council of Electrical Engineering |
container_volume | 2 |
creator | Aihara, Ryota Yokoyama, Akihiko Nomiyama, Fumitoshi Kosugi, Narifumi |
description | In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented. |
format | Article |
fullrecord | <record><control><sourceid>kisti</sourceid><recordid>TN_cdi_kisti_ndsl_JAKO201219240567622</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JAKO201219240567622</sourcerecordid><originalsourceid>FETCH-kisti_ndsl_JAKO2012192405676223</originalsourceid><addsrcrecordid>eNqNT8FqwkAQXaRCpfUf5tJjIFkTY45F2kpbSCDeZeuOZuhmN-yOFX-m39pYc_AoDLx57w3vMSMxkXKWRosil3f_-yzKiiy5F9MQ6CtO07yfpJiI37JjapWBskOvmJyFetugPhiye3A7qA5thxpqdl7tEVYn7R1U7ogeKqMsg7Ia1g36c8iVHoDswOtTYGzhSNyAgk_l-5wKLfJQeG5pHLsfZ1jRFt5672KFRzHeKRNwOuCDeHp9WS9X0TcFpo3VwWzenz9KGScyKWQaZ_N83r97690fPvhb1w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</creator><creatorcontrib>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</creatorcontrib><description>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</description><identifier>ISSN: 2233-5951</identifier><identifier>EISSN: 2234-8972</identifier><language>kor</language><ispartof>Journal of International Council of Electrical Engineering, 2012, Vol.2 (3), p.283-289</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,777,781,882,4010</link.rule.ids></links><search><creatorcontrib>Aihara, Ryota</creatorcontrib><creatorcontrib>Yokoyama, Akihiko</creatorcontrib><creatorcontrib>Nomiyama, Fumitoshi</creatorcontrib><creatorcontrib>Kosugi, Narifumi</creatorcontrib><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><title>Journal of International Council of Electrical Engineering</title><addtitle>Journal of international council on electrical engineering</addtitle><description>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</description><issn>2233-5951</issn><issn>2234-8972</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><sourceid>JDI</sourceid><recordid>eNqNT8FqwkAQXaRCpfUf5tJjIFkTY45F2kpbSCDeZeuOZuhmN-yOFX-m39pYc_AoDLx57w3vMSMxkXKWRosil3f_-yzKiiy5F9MQ6CtO07yfpJiI37JjapWBskOvmJyFetugPhiye3A7qA5thxpqdl7tEVYn7R1U7ogeKqMsg7Ia1g36c8iVHoDswOtTYGzhSNyAgk_l-5wKLfJQeG5pHLsfZ1jRFt5672KFRzHeKRNwOuCDeHp9WS9X0TcFpo3VwWzenz9KGScyKWQaZ_N83r97690fPvhb1w</recordid><startdate>2012</startdate><enddate>2012</enddate><creator>Aihara, Ryota</creator><creator>Yokoyama, Akihiko</creator><creator>Nomiyama, Fumitoshi</creator><creator>Kosugi, Narifumi</creator><scope>JDI</scope></search><sort><creationdate>2012</creationdate><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><author>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-kisti_ndsl_JAKO2012192405676223</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>kor</language><creationdate>2012</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Aihara, Ryota</creatorcontrib><creatorcontrib>Yokoyama, Akihiko</creatorcontrib><creatorcontrib>Nomiyama, Fumitoshi</creatorcontrib><creatorcontrib>Kosugi, Narifumi</creatorcontrib><collection>KoreaScience</collection><jtitle>Journal of International Council of Electrical Engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Aihara, Ryota</au><au>Yokoyama, Akihiko</au><au>Nomiyama, Fumitoshi</au><au>Kosugi, Narifumi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</atitle><jtitle>Journal of International Council of Electrical Engineering</jtitle><addtitle>Journal of international council on electrical engineering</addtitle><date>2012</date><risdate>2012</risdate><volume>2</volume><issue>3</issue><spage>283</spage><epage>289</epage><pages>283-289</pages><issn>2233-5951</issn><eissn>2234-8972</eissn><abstract>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2233-5951 |
ispartof | Journal of International Council of Electrical Engineering, 2012, Vol.2 (3), p.283-289 |
issn | 2233-5951 2234-8972 |
language | kor |
recordid | cdi_kisti_ndsl_JAKO201219240567622 |
source | Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals |
title | Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T14%3A06%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-kisti&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Optimal%20Operation%20Scheduling%20of%20Pumped%20Storage%20Hydro%20Power%20Plant%20and%20Thermal%20Power%20Plants%20in%20Power%20System%20with%20a%20Large%20Penetration%20of%20Photovoltaic%20Generations&rft.jtitle=Journal%20of%20International%20Council%20of%20Electrical%20Engineering&rft.au=Aihara,%20Ryota&rft.date=2012&rft.volume=2&rft.issue=3&rft.spage=283&rft.epage=289&rft.pages=283-289&rft.issn=2233-5951&rft.eissn=2234-8972&rft_id=info:doi/&rft_dat=%3Ckisti%3EJAKO201219240567622%3C/kisti%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |