Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations

In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the beh...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of International Council of Electrical Engineering 2012, Vol.2 (3), p.283-289
Hauptverfasser: Aihara, Ryota, Yokoyama, Akihiko, Nomiyama, Fumitoshi, Kosugi, Narifumi
Format: Artikel
Sprache:kor
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 289
container_issue 3
container_start_page 283
container_title Journal of International Council of Electrical Engineering
container_volume 2
creator Aihara, Ryota
Yokoyama, Akihiko
Nomiyama, Fumitoshi
Kosugi, Narifumi
description In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.
format Article
fullrecord <record><control><sourceid>kisti</sourceid><recordid>TN_cdi_kisti_ndsl_JAKO201219240567622</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JAKO201219240567622</sourcerecordid><originalsourceid>FETCH-kisti_ndsl_JAKO2012192405676223</originalsourceid><addsrcrecordid>eNqNT8FqwkAQXaRCpfUf5tJjIFkTY45F2kpbSCDeZeuOZuhmN-yOFX-m39pYc_AoDLx57w3vMSMxkXKWRosil3f_-yzKiiy5F9MQ6CtO07yfpJiI37JjapWBskOvmJyFetugPhiye3A7qA5thxpqdl7tEVYn7R1U7ogeKqMsg7Ia1g36c8iVHoDswOtTYGzhSNyAgk_l-5wKLfJQeG5pHLsfZ1jRFt5672KFRzHeKRNwOuCDeHp9WS9X0TcFpo3VwWzenz9KGScyKWQaZ_N83r97690fPvhb1w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</creator><creatorcontrib>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</creatorcontrib><description>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</description><identifier>ISSN: 2233-5951</identifier><identifier>EISSN: 2234-8972</identifier><language>kor</language><ispartof>Journal of International Council of Electrical Engineering, 2012, Vol.2 (3), p.283-289</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,777,781,882,4010</link.rule.ids></links><search><creatorcontrib>Aihara, Ryota</creatorcontrib><creatorcontrib>Yokoyama, Akihiko</creatorcontrib><creatorcontrib>Nomiyama, Fumitoshi</creatorcontrib><creatorcontrib>Kosugi, Narifumi</creatorcontrib><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><title>Journal of International Council of Electrical Engineering</title><addtitle>Journal of international council on electrical engineering</addtitle><description>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</description><issn>2233-5951</issn><issn>2234-8972</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><sourceid>JDI</sourceid><recordid>eNqNT8FqwkAQXaRCpfUf5tJjIFkTY45F2kpbSCDeZeuOZuhmN-yOFX-m39pYc_AoDLx57w3vMSMxkXKWRosil3f_-yzKiiy5F9MQ6CtO07yfpJiI37JjapWBskOvmJyFetugPhiye3A7qA5thxpqdl7tEVYn7R1U7ogeKqMsg7Ia1g36c8iVHoDswOtTYGzhSNyAgk_l-5wKLfJQeG5pHLsfZ1jRFt5672KFRzHeKRNwOuCDeHp9WS9X0TcFpo3VwWzenz9KGScyKWQaZ_N83r97690fPvhb1w</recordid><startdate>2012</startdate><enddate>2012</enddate><creator>Aihara, Ryota</creator><creator>Yokoyama, Akihiko</creator><creator>Nomiyama, Fumitoshi</creator><creator>Kosugi, Narifumi</creator><scope>JDI</scope></search><sort><creationdate>2012</creationdate><title>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</title><author>Aihara, Ryota ; Yokoyama, Akihiko ; Nomiyama, Fumitoshi ; Kosugi, Narifumi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-kisti_ndsl_JAKO2012192405676223</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>kor</language><creationdate>2012</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Aihara, Ryota</creatorcontrib><creatorcontrib>Yokoyama, Akihiko</creatorcontrib><creatorcontrib>Nomiyama, Fumitoshi</creatorcontrib><creatorcontrib>Kosugi, Narifumi</creatorcontrib><collection>KoreaScience</collection><jtitle>Journal of International Council of Electrical Engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Aihara, Ryota</au><au>Yokoyama, Akihiko</au><au>Nomiyama, Fumitoshi</au><au>Kosugi, Narifumi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations</atitle><jtitle>Journal of International Council of Electrical Engineering</jtitle><addtitle>Journal of international council on electrical engineering</addtitle><date>2012</date><risdate>2012</risdate><volume>2</volume><issue>3</issue><spage>283</spage><epage>289</epage><pages>283-289</pages><issn>2233-5951</issn><eissn>2234-8972</eissn><abstract>In recent years, a substantial amount of photovoltaic (PV) generations have been installed in power systems. However, the power output from the PV is random and intermittent in nature. Therefore, the PV generation poses many challenges to the power system operation. To evaluate the impact of the behavior of PV on power supply reliability, we have developed a power supply reliability evaluation model considering a large integration of PV generation into power system. As a result, the power supply reliability is getting worse as the PV penetration level increases. To solve this issue, we have proposed that pumped storage hydro power plant (PSHPP) is used effectively to improve the reliability. In this paper a cooperative scheduling method for the PSHPP and thermal power plants that makes it possible to improve both reliability and economy is presented.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2233-5951
ispartof Journal of International Council of Electrical Engineering, 2012, Vol.2 (3), p.283-289
issn 2233-5951
2234-8972
language kor
recordid cdi_kisti_ndsl_JAKO201219240567622
source Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals
title Optimal Operation Scheduling of Pumped Storage Hydro Power Plant and Thermal Power Plants in Power System with a Large Penetration of Photovoltaic Generations
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T14%3A06%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-kisti&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Optimal%20Operation%20Scheduling%20of%20Pumped%20Storage%20Hydro%20Power%20Plant%20and%20Thermal%20Power%20Plants%20in%20Power%20System%20with%20a%20Large%20Penetration%20of%20Photovoltaic%20Generations&rft.jtitle=Journal%20of%20International%20Council%20of%20Electrical%20Engineering&rft.au=Aihara,%20Ryota&rft.date=2012&rft.volume=2&rft.issue=3&rft.spage=283&rft.epage=289&rft.pages=283-289&rft.issn=2233-5951&rft.eissn=2234-8972&rft_id=info:doi/&rft_dat=%3Ckisti%3EJAKO201219240567622%3C/kisti%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true