Delay-Dependent Optimal Load Frequency Control for Sampling Systems With Demand Response

The continuous-time model is widely used to design load frequency control (LFC) schemes for power systems with delays and demand response (DR). In practice, however, the LFC system works in a sampled-data manner. The plant operates continuously while the control updates every few seconds. This paper...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 2022-11, Vol.37 (6), p.4310-4324
Hauptverfasser: Lin, Chengrong, Hu, Bo, Shao, Changzheng, Li, Weizhan, Li, Chunyan, Xie, Kaigui
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!