Impact of RTO size on the reliable and secure operation of the Eastern Interconnection
In its recent NOPR of regional transmission organizations (RTOs), FERC reasons that the existence of large regional transmission organizations will promote reliable and secure operation of the bulk power grid. This presentation explores the factors that influence reliable operation and that relate t...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 1259 vol. 2 |
---|---|
container_issue | |
container_start_page | 1258 |
container_title | |
container_volume | 2 |
creator | Dag Rappen, N. |
description | In its recent NOPR of regional transmission organizations (RTOs), FERC reasons that the existence of large regional transmission organizations will promote reliable and secure operation of the bulk power grid. This presentation explores the factors that influence reliable operation and that relate to RTO size and the characteristics of the power system. Ignoring present institutional boundaries, specific RTO configurations for the Eastern Interconnection are postulated. Central themes include the impact of a large number of transactions on scheduling and dispatching within security constraints, redispatching transactions to maintain secure operation and handling of emergency conditions. |
doi_str_mv | 10.1109/PESS.2000.867566 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_867566</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>867566</ieee_id><sourcerecordid>867566</sourcerecordid><originalsourceid>FETCH-LOGICAL-i104t-8cf452ae459b6980cd2602e5f17e8c8a9e58e43a4009f91b84190222df5d74af3</originalsourceid><addsrcrecordid>eNotj0FLxDAUhAMiKGvv4il_oPUlTdLkKEvVwsKKu3pd0vQFI920pPWgv94uuzAwh29mYAi5Z1AwBubxrd7tCg4AhVaVVOqKZKbSsKhUggO_Idk0fS8chBQa-C35bI6jdTMdPH3fb-kU_pAOkc5fSBP2wbY9Uhs7OqH7SQsaMdk5LImlcArVdpoxRdrExdwQI7oTviPX3vYTZhdfkY_ner9-zTfbl2b9tMkDAzHn2nkhuUUhTauMBtdxBRylZxVqp61BqVGUVgAYb1irBTPAOe-87CphfbkiD-fdgIiHMYWjTb-H8_nyHyBYTyo</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Impact of RTO size on the reliable and secure operation of the Eastern Interconnection</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Dag Rappen, N.</creator><creatorcontrib>Dag Rappen, N.</creatorcontrib><description>In its recent NOPR of regional transmission organizations (RTOs), FERC reasons that the existence of large regional transmission organizations will promote reliable and secure operation of the bulk power grid. This presentation explores the factors that influence reliable operation and that relate to RTO size and the characteristics of the power system. Ignoring present institutional boundaries, specific RTO configurations for the Eastern Interconnection are postulated. Central themes include the impact of a large number of transactions on scheduling and dispatching within security constraints, redispatching transactions to maintain secure operation and handling of emergency conditions.</description><identifier>ISBN: 9780780364202</identifier><identifier>ISBN: 0780364201</identifier><identifier>DOI: 10.1109/PESS.2000.867566</identifier><language>eng</language><publisher>IEEE</publisher><subject>Control systems ; Economic forecasting ; Impedance ; Maintenance ; Power generation economics ; Power grids ; Power system interconnection ; Power system reliability ; Power system security ; Uncertainty</subject><ispartof>2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134), 2000, Vol.2, p.1258-1259 vol. 2</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/867566$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,776,780,785,786,2052,4036,4037,27902,54895</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/867566$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Dag Rappen, N.</creatorcontrib><title>Impact of RTO size on the reliable and secure operation of the Eastern Interconnection</title><title>2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134)</title><addtitle>PESS</addtitle><description>In its recent NOPR of regional transmission organizations (RTOs), FERC reasons that the existence of large regional transmission organizations will promote reliable and secure operation of the bulk power grid. This presentation explores the factors that influence reliable operation and that relate to RTO size and the characteristics of the power system. Ignoring present institutional boundaries, specific RTO configurations for the Eastern Interconnection are postulated. Central themes include the impact of a large number of transactions on scheduling and dispatching within security constraints, redispatching transactions to maintain secure operation and handling of emergency conditions.</description><subject>Control systems</subject><subject>Economic forecasting</subject><subject>Impedance</subject><subject>Maintenance</subject><subject>Power generation economics</subject><subject>Power grids</subject><subject>Power system interconnection</subject><subject>Power system reliability</subject><subject>Power system security</subject><subject>Uncertainty</subject><isbn>9780780364202</isbn><isbn>0780364201</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2000</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNotj0FLxDAUhAMiKGvv4il_oPUlTdLkKEvVwsKKu3pd0vQFI920pPWgv94uuzAwh29mYAi5Z1AwBubxrd7tCg4AhVaVVOqKZKbSsKhUggO_Idk0fS8chBQa-C35bI6jdTMdPH3fb-kU_pAOkc5fSBP2wbY9Uhs7OqH7SQsaMdk5LImlcArVdpoxRdrExdwQI7oTviPX3vYTZhdfkY_ner9-zTfbl2b9tMkDAzHn2nkhuUUhTauMBtdxBRylZxVqp61BqVGUVgAYb1irBTPAOe-87CphfbkiD-fdgIiHMYWjTb-H8_nyHyBYTyo</recordid><startdate>2000</startdate><enddate>2000</enddate><creator>Dag Rappen, N.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>2000</creationdate><title>Impact of RTO size on the reliable and secure operation of the Eastern Interconnection</title><author>Dag Rappen, N.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i104t-8cf452ae459b6980cd2602e5f17e8c8a9e58e43a4009f91b84190222df5d74af3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Control systems</topic><topic>Economic forecasting</topic><topic>Impedance</topic><topic>Maintenance</topic><topic>Power generation economics</topic><topic>Power grids</topic><topic>Power system interconnection</topic><topic>Power system reliability</topic><topic>Power system security</topic><topic>Uncertainty</topic><toplevel>online_resources</toplevel><creatorcontrib>Dag Rappen, N.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Dag Rappen, N.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Impact of RTO size on the reliable and secure operation of the Eastern Interconnection</atitle><btitle>2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134)</btitle><stitle>PESS</stitle><date>2000</date><risdate>2000</risdate><volume>2</volume><spage>1258</spage><epage>1259 vol. 2</epage><pages>1258-1259 vol. 2</pages><isbn>9780780364202</isbn><isbn>0780364201</isbn><abstract>In its recent NOPR of regional transmission organizations (RTOs), FERC reasons that the existence of large regional transmission organizations will promote reliable and secure operation of the bulk power grid. This presentation explores the factors that influence reliable operation and that relate to RTO size and the characteristics of the power system. Ignoring present institutional boundaries, specific RTO configurations for the Eastern Interconnection are postulated. Central themes include the impact of a large number of transactions on scheduling and dispatching within security constraints, redispatching transactions to maintain secure operation and handling of emergency conditions.</abstract><pub>IEEE</pub><doi>10.1109/PESS.2000.867566</doi></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISBN: 9780780364202 |
ispartof | 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134), 2000, Vol.2, p.1258-1259 vol. 2 |
issn | |
language | eng |
recordid | cdi_ieee_primary_867566 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Control systems Economic forecasting Impedance Maintenance Power generation economics Power grids Power system interconnection Power system reliability Power system security Uncertainty |
title | Impact of RTO size on the reliable and secure operation of the Eastern Interconnection |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-10T20%3A22%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Impact%20of%20RTO%20size%20on%20the%20reliable%20and%20secure%20operation%20of%20the%20Eastern%20Interconnection&rft.btitle=2000%20Power%20Engineering%20Society%20Summer%20Meeting%20(Cat.%20No.00CH37134)&rft.au=Dag%20Rappen,%20N.&rft.date=2000&rft.volume=2&rft.spage=1258&rft.epage=1259%20vol.%202&rft.pages=1258-1259%20vol.%202&rft.isbn=9780780364202&rft.isbn_list=0780364201&rft_id=info:doi/10.1109/PESS.2000.867566&rft_dat=%3Cieee_6IE%3E867566%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=867566&rfr_iscdi=true |