Circuit-breaker requirements for alternative configurations of a 500 kV transmission system
This paper describes a study made to assess the electrical stresses imposed on line circuit breakers of a new 500 kV AC expansion of the FURNAS transmission system, to be possibly installed in the Brazilian central region. The study has considered three configurations of the transmission lines, two...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power delivery 1999-01, Vol.14 (1), p.169-175 |
---|---|