A heuristic approach to synchronize production and transportation planning in a mineral water industry
Planning problems arise in different circumstances with a set of parameters, decision variables and constraints, particularly capacity constraints. Synchronizing production plan and transportation plan at item level in medium-short term, however, has received little attention in the prior literature...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 888 |
---|---|
container_issue | |
container_start_page | 881 |
container_title | |
container_volume | |
creator | Yueru Zhong Chengbin Chu Jemai, Z. |
description | Planning problems arise in different circumstances with a set of parameters, decision variables and constraints, particularly capacity constraints. Synchronizing production plan and transportation plan at item level in medium-short term, however, has received little attention in the prior literature. This paper aims at solving a production planning problem that depends not only on internal process and forecast data, but also on subsequent transportation planning. For a multi-product industrial case over a finite planning horizon, an adapted model is established and an improvement-based heuristic is proposed to find a near-optimal solution in a reasonable amount of computation time, with the data from a French mineral water company. The results are compared against those of Cplex to solve an MIP model and those of a combined heuristic-Cplex procedure. The comparison demonstrates that the proposed heuristic algorithm works efficiently. |
doi_str_mv | 10.1109/ICNSC.2013.6548854 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_6548854</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>6548854</ieee_id><sourcerecordid>6548854</sourcerecordid><originalsourceid>FETCH-LOGICAL-i175t-b8d7599bc6d60cac396682ca30e9bfc481a1dcdb4fd5093937e564827408c6273</originalsourceid><addsrcrecordid>eNo1kM1KAzEcxCMiqHVfQC95gdZk830si9pC0YN6Lv9Nsm6kzS5JitSnd9F6GuY3zBwGoVtKFpQSc79unl-bRU0oW0jBtRb8DF1TLhUT1Bh1jiqj9L_X5BJVOX8SQqayZIZfoW6Je39IIZdgMYxjGsD2uAw4H6Pt0xDDt8cTdQdbwhAxRIdLgpjHIRX4ReMOYgzxA4cpxvsQfYId_oLi04TcIZd0vEEXHeyyr046Q--PD2_Nar55eVo3y808UCXKvNVOCWNaK50kFiwzUuraAiPetJ3lmgJ11rW8c4IYZpjyQnJdK060lbViM3T3txu899sxhT2k4_Z0DfsBMD9Z-A</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>A heuristic approach to synchronize production and transportation planning in a mineral water industry</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Yueru Zhong ; Chengbin Chu ; Jemai, Z.</creator><creatorcontrib>Yueru Zhong ; Chengbin Chu ; Jemai, Z.</creatorcontrib><description>Planning problems arise in different circumstances with a set of parameters, decision variables and constraints, particularly capacity constraints. Synchronizing production plan and transportation plan at item level in medium-short term, however, has received little attention in the prior literature. This paper aims at solving a production planning problem that depends not only on internal process and forecast data, but also on subsequent transportation planning. For a multi-product industrial case over a finite planning horizon, an adapted model is established and an improvement-based heuristic is proposed to find a near-optimal solution in a reasonable amount of computation time, with the data from a French mineral water company. The results are compared against those of Cplex to solve an MIP model and those of a combined heuristic-Cplex procedure. The comparison demonstrates that the proposed heuristic algorithm works efficiently.</description><identifier>ISBN: 9781467351980</identifier><identifier>ISBN: 1467351989</identifier><identifier>EISBN: 1467351997</identifier><identifier>EISBN: 9781467351997</identifier><identifier>EISBN: 9781467352000</identifier><identifier>EISBN: 1467352004</identifier><identifier>DOI: 10.1109/ICNSC.2013.6548854</identifier><language>eng</language><publisher>IEEE</publisher><subject>Companies ; Minerals ; Planning ; Production planning ; Resource management ; Transportation</subject><ispartof>2013 10th IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2013, p.881-888</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/6548854$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>310,311,782,786,791,792,2062,27934,54929</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/6548854$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Yueru Zhong</creatorcontrib><creatorcontrib>Chengbin Chu</creatorcontrib><creatorcontrib>Jemai, Z.</creatorcontrib><title>A heuristic approach to synchronize production and transportation planning in a mineral water industry</title><title>2013 10th IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC)</title><addtitle>ICNSC</addtitle><description>Planning problems arise in different circumstances with a set of parameters, decision variables and constraints, particularly capacity constraints. Synchronizing production plan and transportation plan at item level in medium-short term, however, has received little attention in the prior literature. This paper aims at solving a production planning problem that depends not only on internal process and forecast data, but also on subsequent transportation planning. For a multi-product industrial case over a finite planning horizon, an adapted model is established and an improvement-based heuristic is proposed to find a near-optimal solution in a reasonable amount of computation time, with the data from a French mineral water company. The results are compared against those of Cplex to solve an MIP model and those of a combined heuristic-Cplex procedure. The comparison demonstrates that the proposed heuristic algorithm works efficiently.</description><subject>Companies</subject><subject>Minerals</subject><subject>Planning</subject><subject>Production planning</subject><subject>Resource management</subject><subject>Transportation</subject><isbn>9781467351980</isbn><isbn>1467351989</isbn><isbn>1467351997</isbn><isbn>9781467351997</isbn><isbn>9781467352000</isbn><isbn>1467352004</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2013</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNo1kM1KAzEcxCMiqHVfQC95gdZk830si9pC0YN6Lv9Nsm6kzS5JitSnd9F6GuY3zBwGoVtKFpQSc79unl-bRU0oW0jBtRb8DF1TLhUT1Bh1jiqj9L_X5BJVOX8SQqayZIZfoW6Je39IIZdgMYxjGsD2uAw4H6Pt0xDDt8cTdQdbwhAxRIdLgpjHIRX4ReMOYgzxA4cpxvsQfYId_oLi04TcIZd0vEEXHeyyr046Q--PD2_Nar55eVo3y808UCXKvNVOCWNaK50kFiwzUuraAiPetJ3lmgJ11rW8c4IYZpjyQnJdK060lbViM3T3txu899sxhT2k4_Z0DfsBMD9Z-A</recordid><startdate>201304</startdate><enddate>201304</enddate><creator>Yueru Zhong</creator><creator>Chengbin Chu</creator><creator>Jemai, Z.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201304</creationdate><title>A heuristic approach to synchronize production and transportation planning in a mineral water industry</title><author>Yueru Zhong ; Chengbin Chu ; Jemai, Z.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i175t-b8d7599bc6d60cac396682ca30e9bfc481a1dcdb4fd5093937e564827408c6273</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Companies</topic><topic>Minerals</topic><topic>Planning</topic><topic>Production planning</topic><topic>Resource management</topic><topic>Transportation</topic><toplevel>online_resources</toplevel><creatorcontrib>Yueru Zhong</creatorcontrib><creatorcontrib>Chengbin Chu</creatorcontrib><creatorcontrib>Jemai, Z.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Yueru Zhong</au><au>Chengbin Chu</au><au>Jemai, Z.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>A heuristic approach to synchronize production and transportation planning in a mineral water industry</atitle><btitle>2013 10th IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC)</btitle><stitle>ICNSC</stitle><date>2013-04</date><risdate>2013</risdate><spage>881</spage><epage>888</epage><pages>881-888</pages><isbn>9781467351980</isbn><isbn>1467351989</isbn><eisbn>1467351997</eisbn><eisbn>9781467351997</eisbn><eisbn>9781467352000</eisbn><eisbn>1467352004</eisbn><abstract>Planning problems arise in different circumstances with a set of parameters, decision variables and constraints, particularly capacity constraints. Synchronizing production plan and transportation plan at item level in medium-short term, however, has received little attention in the prior literature. This paper aims at solving a production planning problem that depends not only on internal process and forecast data, but also on subsequent transportation planning. For a multi-product industrial case over a finite planning horizon, an adapted model is established and an improvement-based heuristic is proposed to find a near-optimal solution in a reasonable amount of computation time, with the data from a French mineral water company. The results are compared against those of Cplex to solve an MIP model and those of a combined heuristic-Cplex procedure. The comparison demonstrates that the proposed heuristic algorithm works efficiently.</abstract><pub>IEEE</pub><doi>10.1109/ICNSC.2013.6548854</doi><tpages>8</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISBN: 9781467351980 |
ispartof | 2013 10th IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2013, p.881-888 |
issn | |
language | eng |
recordid | cdi_ieee_primary_6548854 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Companies Minerals Planning Production planning Resource management Transportation |
title | A heuristic approach to synchronize production and transportation planning in a mineral water industry |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-03T06%3A12%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=A%20heuristic%20approach%20to%20synchronize%20production%20and%20transportation%20planning%20in%20a%20mineral%20water%20industry&rft.btitle=2013%2010th%20IEEE%20INTERNATIONAL%20CONFERENCE%20ON%20NETWORKING,%20SENSING%20AND%20CONTROL%20(ICNSC)&rft.au=Yueru%20Zhong&rft.date=2013-04&rft.spage=881&rft.epage=888&rft.pages=881-888&rft.isbn=9781467351980&rft.isbn_list=1467351989&rft_id=info:doi/10.1109/ICNSC.2013.6548854&rft_dat=%3Cieee_6IE%3E6548854%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=1467351997&rft.eisbn_list=9781467351997&rft.eisbn_list=9781467352000&rft.eisbn_list=1467352004&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=6548854&rfr_iscdi=true |