Fix series capacitor for increasing power transfer on transmission 150 kV at Sumatera interconection system
The power transfer restrictions on the transmission lines 150 kV in Sumatera Interconnection System caused electric power generated by the power plant with lower cost in fuel at Southern Sumatera cannot be optimally delivered to the load centers in Northern Sumatra. One of technical solution that is...