Demand Market Participation (DMP) on smaller energy users

In order to ensure a reliable and sustainable national electrical distribution grid,the electrical energy supply must be able to meet the demand while ensuring that sufficient power reserves are not compromised. In the past, when electricity reserves margins were sufficient, stability was easily mai...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Vosloo, J. C., Kruger, I. D., van Rensburg, J. F.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 5
container_issue
container_start_page 1
container_title
container_volume
creator Vosloo, J. C.
Kruger, I. D.
van Rensburg, J. F.
description In order to ensure a reliable and sustainable national electrical distribution grid,the electrical energy supply must be able to meet the demand while ensuring that sufficient power reserves are not compromised. In the past, when electricity reserves margins were sufficient, stability was easily maintained by varying supply to meet the demand. Recently however, the demand has tended to exceed the maximum national electricity supply capacity causing Eskom to utilise the reserve margins. As a result of the energy shortfall, Eskom has initiated a program called Demand Market Participation (DMP) [1]. This program initially focused on large electrical energy consuming equipment.However, to ensure feasible DMP for both Eskom and the client, minor energy consumers can also now collectively reduce energy usage of multiple, less intensive energy consuming components. This cumulative action will contribute to a predetermined load reduction target. However, due to the dynamic and unpredictable elements of DMP, managing multiple loads is often a complex and difficult task. Production forecasts, maintenance, previous electricity consumption and non-scheduled maintenance are factors that need to be considered when smaller participating customers place DMP bids. To assist these minor energy consumers, a simulation model was developed that integrates all these aspects so that DMP can be successfully implemented. Results of an actual case study implementation are also discussed.
format Conference Proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_6330140</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>6330140</ieee_id><sourcerecordid>6330140</sourcerecordid><originalsourceid>FETCH-ieee_primary_63301403</originalsourceid><addsrcrecordid>eNp9ybEOgjAUQNEaNRGUL3DpqANJH621nUXjQsLg4EZe9GmqgKTFgb_XwdnpnuSOWCysASUBjB6zGJTeSsgUnCcsykDrVGwMzFgSwkMIIcFYrWzEbE4NtldeoH9Sz0v0vbu4Dnv3avkqL8o1_yI0WNfkObXk7wN_B_JhwaY3rAMlv87Z8rA_7Y6pI6Kq865BP1RaSgFKyP_3A7QHM_s</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Demand Market Participation (DMP) on smaller energy users</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Vosloo, J. C. ; Kruger, I. D. ; van Rensburg, J. F.</creator><creatorcontrib>Vosloo, J. C. ; Kruger, I. D. ; van Rensburg, J. F.</creatorcontrib><description>In order to ensure a reliable and sustainable national electrical distribution grid,the electrical energy supply must be able to meet the demand while ensuring that sufficient power reserves are not compromised. In the past, when electricity reserves margins were sufficient, stability was easily maintained by varying supply to meet the demand. Recently however, the demand has tended to exceed the maximum national electricity supply capacity causing Eskom to utilise the reserve margins. As a result of the energy shortfall, Eskom has initiated a program called Demand Market Participation (DMP) [1]. This program initially focused on large electrical energy consuming equipment.However, to ensure feasible DMP for both Eskom and the client, minor energy consumers can also now collectively reduce energy usage of multiple, less intensive energy consuming components. This cumulative action will contribute to a predetermined load reduction target. However, due to the dynamic and unpredictable elements of DMP, managing multiple loads is often a complex and difficult task. Production forecasts, maintenance, previous electricity consumption and non-scheduled maintenance are factors that need to be considered when smaller participating customers place DMP bids. To assist these minor energy consumers, a simulation model was developed that integrates all these aspects so that DMP can be successfully implemented. Results of an actual case study implementation are also discussed.</description><identifier>ISSN: 2166-0581</identifier><identifier>ISBN: 146731241X</identifier><identifier>ISBN: 9781467312417</identifier><identifier>EISBN: 0981431186</identifier><identifier>EISBN: 9780981431185</identifier><language>eng</language><publisher>IEEE</publisher><subject>Educational institutions ; Electricity ; Load modeling ; Maintenance engineering ; Production ; Reliability ; Schedules</subject><ispartof>2012 Proceedings of the 9th Industrial and Commercial Use of Energy Conference, 2012, p.1-5</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/6330140$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>310,311,782,786,791,792,2062,54929</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/6330140$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Vosloo, J. C.</creatorcontrib><creatorcontrib>Kruger, I. D.</creatorcontrib><creatorcontrib>van Rensburg, J. F.</creatorcontrib><title>Demand Market Participation (DMP) on smaller energy users</title><title>2012 Proceedings of the 9th Industrial and Commercial Use of Energy Conference</title><addtitle>ICUE</addtitle><description>In order to ensure a reliable and sustainable national electrical distribution grid,the electrical energy supply must be able to meet the demand while ensuring that sufficient power reserves are not compromised. In the past, when electricity reserves margins were sufficient, stability was easily maintained by varying supply to meet the demand. Recently however, the demand has tended to exceed the maximum national electricity supply capacity causing Eskom to utilise the reserve margins. As a result of the energy shortfall, Eskom has initiated a program called Demand Market Participation (DMP) [1]. This program initially focused on large electrical energy consuming equipment.However, to ensure feasible DMP for both Eskom and the client, minor energy consumers can also now collectively reduce energy usage of multiple, less intensive energy consuming components. This cumulative action will contribute to a predetermined load reduction target. However, due to the dynamic and unpredictable elements of DMP, managing multiple loads is often a complex and difficult task. Production forecasts, maintenance, previous electricity consumption and non-scheduled maintenance are factors that need to be considered when smaller participating customers place DMP bids. To assist these minor energy consumers, a simulation model was developed that integrates all these aspects so that DMP can be successfully implemented. Results of an actual case study implementation are also discussed.</description><subject>Educational institutions</subject><subject>Electricity</subject><subject>Load modeling</subject><subject>Maintenance engineering</subject><subject>Production</subject><subject>Reliability</subject><subject>Schedules</subject><issn>2166-0581</issn><isbn>146731241X</isbn><isbn>9781467312417</isbn><isbn>0981431186</isbn><isbn>9780981431185</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2012</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNp9ybEOgjAUQNEaNRGUL3DpqANJH621nUXjQsLg4EZe9GmqgKTFgb_XwdnpnuSOWCysASUBjB6zGJTeSsgUnCcsykDrVGwMzFgSwkMIIcFYrWzEbE4NtldeoH9Sz0v0vbu4Dnv3avkqL8o1_yI0WNfkObXk7wN_B_JhwaY3rAMlv87Z8rA_7Y6pI6Kq865BP1RaSgFKyP_3A7QHM_s</recordid><startdate>201208</startdate><enddate>201208</enddate><creator>Vosloo, J. C.</creator><creator>Kruger, I. D.</creator><creator>van Rensburg, J. F.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201208</creationdate><title>Demand Market Participation (DMP) on smaller energy users</title><author>Vosloo, J. C. ; Kruger, I. D. ; van Rensburg, J. F.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-ieee_primary_63301403</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2012</creationdate><topic>Educational institutions</topic><topic>Electricity</topic><topic>Load modeling</topic><topic>Maintenance engineering</topic><topic>Production</topic><topic>Reliability</topic><topic>Schedules</topic><toplevel>online_resources</toplevel><creatorcontrib>Vosloo, J. C.</creatorcontrib><creatorcontrib>Kruger, I. D.</creatorcontrib><creatorcontrib>van Rensburg, J. F.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Vosloo, J. C.</au><au>Kruger, I. D.</au><au>van Rensburg, J. F.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Demand Market Participation (DMP) on smaller energy users</atitle><btitle>2012 Proceedings of the 9th Industrial and Commercial Use of Energy Conference</btitle><stitle>ICUE</stitle><date>2012-08</date><risdate>2012</risdate><spage>1</spage><epage>5</epage><pages>1-5</pages><issn>2166-0581</issn><isbn>146731241X</isbn><isbn>9781467312417</isbn><eisbn>0981431186</eisbn><eisbn>9780981431185</eisbn><abstract>In order to ensure a reliable and sustainable national electrical distribution grid,the electrical energy supply must be able to meet the demand while ensuring that sufficient power reserves are not compromised. In the past, when electricity reserves margins were sufficient, stability was easily maintained by varying supply to meet the demand. Recently however, the demand has tended to exceed the maximum national electricity supply capacity causing Eskom to utilise the reserve margins. As a result of the energy shortfall, Eskom has initiated a program called Demand Market Participation (DMP) [1]. This program initially focused on large electrical energy consuming equipment.However, to ensure feasible DMP for both Eskom and the client, minor energy consumers can also now collectively reduce energy usage of multiple, less intensive energy consuming components. This cumulative action will contribute to a predetermined load reduction target. However, due to the dynamic and unpredictable elements of DMP, managing multiple loads is often a complex and difficult task. Production forecasts, maintenance, previous electricity consumption and non-scheduled maintenance are factors that need to be considered when smaller participating customers place DMP bids. To assist these minor energy consumers, a simulation model was developed that integrates all these aspects so that DMP can be successfully implemented. Results of an actual case study implementation are also discussed.</abstract><pub>IEEE</pub></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 2166-0581
ispartof 2012 Proceedings of the 9th Industrial and Commercial Use of Energy Conference, 2012, p.1-5
issn 2166-0581
language eng
recordid cdi_ieee_primary_6330140
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Educational institutions
Electricity
Load modeling
Maintenance engineering
Production
Reliability
Schedules
title Demand Market Participation (DMP) on smaller energy users
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-02T12%3A52%3A05IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Demand%20Market%20Participation%20(DMP)%20on%20smaller%20energy%20users&rft.btitle=2012%20Proceedings%20of%20the%209th%20Industrial%20and%20Commercial%20Use%20of%20Energy%20Conference&rft.au=Vosloo,%20J.%20C.&rft.date=2012-08&rft.spage=1&rft.epage=5&rft.pages=1-5&rft.issn=2166-0581&rft.isbn=146731241X&rft.isbn_list=9781467312417&rft_id=info:doi/&rft_dat=%3Cieee_6IE%3E6330140%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=0981431186&rft.eisbn_list=9780981431185&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=6330140&rfr_iscdi=true