Contractors' strategic approaches to risk assessment techniques at project planning stage
The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment amon...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 325 |
---|---|
container_issue | |
container_start_page | 320 |
container_title | |
container_volume | |
creator | Zaini, A. A. Takim, R. Endut, I. R. |
description | The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment among Malaysian contractors during the project planning stage is a proactive approach to achieve project objectives. Therefore, this research intends to achieve the following objectives: (1) to investigate the contractors' approaches of risk assessment techniques at the project planning stage, (2) to investigate the consequences of risk assessment techniques at the project planning stage, and (3) to determine the appropriate risk assessment techniques in dealing with the potential risk factors at the project planning stage. The research methodology applied for this research includes literature reviews and questionnaires. Findings from this research show that the application of risk assessment techniques in the Malaysian Construction Industry is still moderate. Hence, it is suggested that these contractors should try to implement formal risk assessment techniques during the project planning stage in order to achieve the project objectives. |
doi_str_mv | 10.1109/ISBEIA.2011.6088829 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_6088829</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>6088829</ieee_id><sourcerecordid>6088829</sourcerecordid><originalsourceid>FETCH-LOGICAL-i1359-1135f3a45417b9b1394300ac1d571eecd0ae587dd7e988efdd4113d31ed9a0213</originalsourceid><addsrcrecordid>eNpVULFOwzAQNUJIoJIv6OKNqcEXx7U9lqhApEoMwMBUXe1r69ImITYDf48lunDDvff03r3hGJuCKAGEvW9fH5btoqwEQDkXxpjKXrDCagO10hpUbdXlP23MNStiPIg887kxSt2wj6bv0ogu9WO84zHTRLvgOA7D2KPbU-Sp52OInxxjpBhP1CWeyO278PWdXUw8Jw_kMh6x60K3yzW4o1t2tcVjpOKME_b-uHxrnmerl6e2WaxmAaSyM8h7K7FWNeiN3YC0tRQCHXilgch5gaSM9l6TNYa23tf5xEsgb1FUICds-tcbiGg9jOGE48_6_BD5C9IpVac</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Contractors' strategic approaches to risk assessment techniques at project planning stage</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Zaini, A. A. ; Takim, R. ; Endut, I. R.</creator><creatorcontrib>Zaini, A. A. ; Takim, R. ; Endut, I. R.</creatorcontrib><description>The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment among Malaysian contractors during the project planning stage is a proactive approach to achieve project objectives. Therefore, this research intends to achieve the following objectives: (1) to investigate the contractors' approaches of risk assessment techniques at the project planning stage, (2) to investigate the consequences of risk assessment techniques at the project planning stage, and (3) to determine the appropriate risk assessment techniques in dealing with the potential risk factors at the project planning stage. The research methodology applied for this research includes literature reviews and questionnaires. Findings from this research show that the application of risk assessment techniques in the Malaysian Construction Industry is still moderate. Hence, it is suggested that these contractors should try to implement formal risk assessment techniques during the project planning stage in order to achieve the project objectives.</description><identifier>ISBN: 9781457715488</identifier><identifier>ISBN: 1457715481</identifier><identifier>EISBN: 9781457715495</identifier><identifier>EISBN: 1457715473</identifier><identifier>EISBN: 9781457715471</identifier><identifier>EISBN: 145771549X</identifier><identifier>DOI: 10.1109/ISBEIA.2011.6088829</identifier><language>eng</language><publisher>IEEE</publisher><subject>Companies ; Construction industry ; Contractors ; Planning ; Project Planning Stage ; Risk ; Risk Assessment ; Risk management ; Training</subject><ispartof>2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA), 2011, p.320-325</ispartof><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/6088829$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,776,780,785,786,2052,27902,54895</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/6088829$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Zaini, A. A.</creatorcontrib><creatorcontrib>Takim, R.</creatorcontrib><creatorcontrib>Endut, I. R.</creatorcontrib><title>Contractors' strategic approaches to risk assessment techniques at project planning stage</title><title>2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)</title><addtitle>ISBEIA</addtitle><description>The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment among Malaysian contractors during the project planning stage is a proactive approach to achieve project objectives. Therefore, this research intends to achieve the following objectives: (1) to investigate the contractors' approaches of risk assessment techniques at the project planning stage, (2) to investigate the consequences of risk assessment techniques at the project planning stage, and (3) to determine the appropriate risk assessment techniques in dealing with the potential risk factors at the project planning stage. The research methodology applied for this research includes literature reviews and questionnaires. Findings from this research show that the application of risk assessment techniques in the Malaysian Construction Industry is still moderate. Hence, it is suggested that these contractors should try to implement formal risk assessment techniques during the project planning stage in order to achieve the project objectives.</description><subject>Companies</subject><subject>Construction industry</subject><subject>Contractors</subject><subject>Planning</subject><subject>Project Planning Stage</subject><subject>Risk</subject><subject>Risk Assessment</subject><subject>Risk management</subject><subject>Training</subject><isbn>9781457715488</isbn><isbn>1457715481</isbn><isbn>9781457715495</isbn><isbn>1457715473</isbn><isbn>9781457715471</isbn><isbn>145771549X</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2011</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNpVULFOwzAQNUJIoJIv6OKNqcEXx7U9lqhApEoMwMBUXe1r69ImITYDf48lunDDvff03r3hGJuCKAGEvW9fH5btoqwEQDkXxpjKXrDCagO10hpUbdXlP23MNStiPIg887kxSt2wj6bv0ogu9WO84zHTRLvgOA7D2KPbU-Sp52OInxxjpBhP1CWeyO278PWdXUw8Jw_kMh6x60K3yzW4o1t2tcVjpOKME_b-uHxrnmerl6e2WaxmAaSyM8h7K7FWNeiN3YC0tRQCHXilgch5gaSM9l6TNYa23tf5xEsgb1FUICds-tcbiGg9jOGE48_6_BD5C9IpVac</recordid><startdate>201109</startdate><enddate>201109</enddate><creator>Zaini, A. A.</creator><creator>Takim, R.</creator><creator>Endut, I. R.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201109</creationdate><title>Contractors' strategic approaches to risk assessment techniques at project planning stage</title><author>Zaini, A. A. ; Takim, R. ; Endut, I. R.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i1359-1135f3a45417b9b1394300ac1d571eecd0ae587dd7e988efdd4113d31ed9a0213</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2011</creationdate><topic>Companies</topic><topic>Construction industry</topic><topic>Contractors</topic><topic>Planning</topic><topic>Project Planning Stage</topic><topic>Risk</topic><topic>Risk Assessment</topic><topic>Risk management</topic><topic>Training</topic><toplevel>online_resources</toplevel><creatorcontrib>Zaini, A. A.</creatorcontrib><creatorcontrib>Takim, R.</creatorcontrib><creatorcontrib>Endut, I. R.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Zaini, A. A.</au><au>Takim, R.</au><au>Endut, I. R.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Contractors' strategic approaches to risk assessment techniques at project planning stage</atitle><btitle>2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA)</btitle><stitle>ISBEIA</stitle><date>2011-09</date><risdate>2011</risdate><spage>320</spage><epage>325</epage><pages>320-325</pages><isbn>9781457715488</isbn><isbn>1457715481</isbn><eisbn>9781457715495</eisbn><eisbn>1457715473</eisbn><eisbn>9781457715471</eisbn><eisbn>145771549X</eisbn><abstract>The construction industry is still plagued by poor quality, poor workmanship, poor safety and health environment, and poor practices. The current main problem in the Malaysian Construction Industry is delayed projects under the Ninth Malaysia Plan. The idea of introducing formal risk assessment among Malaysian contractors during the project planning stage is a proactive approach to achieve project objectives. Therefore, this research intends to achieve the following objectives: (1) to investigate the contractors' approaches of risk assessment techniques at the project planning stage, (2) to investigate the consequences of risk assessment techniques at the project planning stage, and (3) to determine the appropriate risk assessment techniques in dealing with the potential risk factors at the project planning stage. The research methodology applied for this research includes literature reviews and questionnaires. Findings from this research show that the application of risk assessment techniques in the Malaysian Construction Industry is still moderate. Hence, it is suggested that these contractors should try to implement formal risk assessment techniques during the project planning stage in order to achieve the project objectives.</abstract><pub>IEEE</pub><doi>10.1109/ISBEIA.2011.6088829</doi><tpages>6</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISBN: 9781457715488 |
ispartof | 2011 IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA), 2011, p.320-325 |
issn | |
language | eng |
recordid | cdi_ieee_primary_6088829 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Companies Construction industry Contractors Planning Project Planning Stage Risk Risk Assessment Risk management Training |
title | Contractors' strategic approaches to risk assessment techniques at project planning stage |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-19T22%3A06%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Contractors'%20strategic%20approaches%20to%20risk%20assessment%20techniques%20at%20project%20planning%20stage&rft.btitle=2011%20IEEE%20Symposium%20on%20Business,%20Engineering%20and%20Industrial%20Applications%20(ISBEIA)&rft.au=Zaini,%20A.%20A.&rft.date=2011-09&rft.spage=320&rft.epage=325&rft.pages=320-325&rft.isbn=9781457715488&rft.isbn_list=1457715481&rft_id=info:doi/10.1109/ISBEIA.2011.6088829&rft_dat=%3Cieee_6IE%3E6088829%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=9781457715495&rft.eisbn_list=1457715473&rft.eisbn_list=9781457715471&rft.eisbn_list=145771549X&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=6088829&rfr_iscdi=true |