PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study
Since both the information which is existed in an organization and its security play a terrific and significant role in a current competitive world, a stringent planning is required for the Information Security Management System implementation project. In this paper, a planning for executing the men...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 791 |
---|---|
container_issue | |
container_start_page | 788 |
container_title | |
container_volume | |
creator | Ghasemabadi, M. Ahmadzadeh Ashtiani, M. Gorji Mohammadipour, F. |
description | Since both the information which is existed in an organization and its security play a terrific and significant role in a current competitive world, a stringent planning is required for the Information Security Management System implementation project. In this paper, a planning for executing the mentioned project is proposed by considering five essential processes of project management. Since completion times of some activities are not admissible for the respective project customer, they need to be altered. Thus, a linear programming model with the cost minimization objective function is formulated. In other words, with the model and conditions proposed in this paper, no activity is forced to be eliminated for delivering the project within acceptable time and the dimensions of time, cost, quality and the scope are not sacrificed for one another and they are all noticed simultaneously. This project as it is described in this paper is planned and executed in one of Iranian leading IT-based companies. |
doi_str_mv | 10.1109/ICEMMS.2011.6015800 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_6015800</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>6015800</ieee_id><sourcerecordid>6015800</sourcerecordid><originalsourceid>FETCH-LOGICAL-i90t-a4da3f1d1d38c492bf207c35bd9f2802ab1f07cad979d73be7a8c6752be4ffac3</originalsourceid><addsrcrecordid>eNo1kN1OAjEQhWuMiYo8ATd9AbDtdndb75CgbmSDCdyT2XZqStifbKsJPr2L4NycOd_8XBxCJpzNOGf6sVgsy3IzE4zzWcZ4qhi7ImOdKy6FlDrLpLom9_8m1bdkHMKeDZVlWqj0jhw_yuf1O3X-G2nXtwZDoN0BGuranhabcnOiezSR-ro7YI1NhOjbhpq2Cd5i75vPoQ-Rtl30tf85T0_XQAeAf4uxB9_EJzqnBgLSEL_s8YHcODgEHF90RLYvy-3ibbpavxaL-WrqNYtTkBYSxy23iTJSi8oJlpskrax2QjEBFXcDAKtzbfOkwhyUyfJUVCidA5OMyOT81iPirut9Df1xdwkr-QUHJ2Cw</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Ghasemabadi, M. Ahmadzadeh ; Ashtiani, M. Gorji ; Mohammadipour, F.</creator><creatorcontrib>Ghasemabadi, M. Ahmadzadeh ; Ashtiani, M. Gorji ; Mohammadipour, F.</creatorcontrib><description>Since both the information which is existed in an organization and its security play a terrific and significant role in a current competitive world, a stringent planning is required for the Information Security Management System implementation project. In this paper, a planning for executing the mentioned project is proposed by considering five essential processes of project management. Since completion times of some activities are not admissible for the respective project customer, they need to be altered. Thus, a linear programming model with the cost minimization objective function is formulated. In other words, with the model and conditions proposed in this paper, no activity is forced to be eliminated for delivering the project within acceptable time and the dimensions of time, cost, quality and the scope are not sacrificed for one another and they are all noticed simultaneously. This project as it is described in this paper is planned and executed in one of Iranian leading IT-based companies.</description><identifier>ISBN: 1424496659</identifier><identifier>ISBN: 9781424496655</identifier><identifier>EISBN: 9781424496648</identifier><identifier>EISBN: 9781424496662</identifier><identifier>EISBN: 1424496640</identifier><identifier>EISBN: 1424496667</identifier><identifier>DOI: 10.1109/ICEMMS.2011.6015800</identifier><language>eng</language><publisher>IEEE</publisher><subject>Companies ; cost minimization ; five processes ; Information security ; information security management system ; Linear programming ; Planning ; Project management ; Standards organizations ; time reduction</subject><ispartof>2011 2nd IEEE International Conference on Emergency Management and Management Sciences, 2011, p.788-791</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/6015800$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,776,780,785,786,2052,27902,54895</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/6015800$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Ghasemabadi, M. Ahmadzadeh</creatorcontrib><creatorcontrib>Ashtiani, M. Gorji</creatorcontrib><creatorcontrib>Mohammadipour, F.</creatorcontrib><title>PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study</title><title>2011 2nd IEEE International Conference on Emergency Management and Management Sciences</title><addtitle>ICEMMS</addtitle><description>Since both the information which is existed in an organization and its security play a terrific and significant role in a current competitive world, a stringent planning is required for the Information Security Management System implementation project. In this paper, a planning for executing the mentioned project is proposed by considering five essential processes of project management. Since completion times of some activities are not admissible for the respective project customer, they need to be altered. Thus, a linear programming model with the cost minimization objective function is formulated. In other words, with the model and conditions proposed in this paper, no activity is forced to be eliminated for delivering the project within acceptable time and the dimensions of time, cost, quality and the scope are not sacrificed for one another and they are all noticed simultaneously. This project as it is described in this paper is planned and executed in one of Iranian leading IT-based companies.</description><subject>Companies</subject><subject>cost minimization</subject><subject>five processes</subject><subject>Information security</subject><subject>information security management system</subject><subject>Linear programming</subject><subject>Planning</subject><subject>Project management</subject><subject>Standards organizations</subject><subject>time reduction</subject><isbn>1424496659</isbn><isbn>9781424496655</isbn><isbn>9781424496648</isbn><isbn>9781424496662</isbn><isbn>1424496640</isbn><isbn>1424496667</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2011</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNo1kN1OAjEQhWuMiYo8ATd9AbDtdndb75CgbmSDCdyT2XZqStifbKsJPr2L4NycOd_8XBxCJpzNOGf6sVgsy3IzE4zzWcZ4qhi7ImOdKy6FlDrLpLom9_8m1bdkHMKeDZVlWqj0jhw_yuf1O3X-G2nXtwZDoN0BGuranhabcnOiezSR-ro7YI1NhOjbhpq2Cd5i75vPoQ-Rtl30tf85T0_XQAeAf4uxB9_EJzqnBgLSEL_s8YHcODgEHF90RLYvy-3ibbpavxaL-WrqNYtTkBYSxy23iTJSi8oJlpskrax2QjEBFXcDAKtzbfOkwhyUyfJUVCidA5OMyOT81iPirut9Df1xdwkr-QUHJ2Cw</recordid><startdate>201108</startdate><enddate>201108</enddate><creator>Ghasemabadi, M. Ahmadzadeh</creator><creator>Ashtiani, M. Gorji</creator><creator>Mohammadipour, F.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201108</creationdate><title>PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study</title><author>Ghasemabadi, M. Ahmadzadeh ; Ashtiani, M. Gorji ; Mohammadipour, F.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i90t-a4da3f1d1d38c492bf207c35bd9f2802ab1f07cad979d73be7a8c6752be4ffac3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2011</creationdate><topic>Companies</topic><topic>cost minimization</topic><topic>five processes</topic><topic>Information security</topic><topic>information security management system</topic><topic>Linear programming</topic><topic>Planning</topic><topic>Project management</topic><topic>Standards organizations</topic><topic>time reduction</topic><toplevel>online_resources</toplevel><creatorcontrib>Ghasemabadi, M. Ahmadzadeh</creatorcontrib><creatorcontrib>Ashtiani, M. Gorji</creatorcontrib><creatorcontrib>Mohammadipour, F.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Ghasemabadi, M. Ahmadzadeh</au><au>Ashtiani, M. Gorji</au><au>Mohammadipour, F.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study</atitle><btitle>2011 2nd IEEE International Conference on Emergency Management and Management Sciences</btitle><stitle>ICEMMS</stitle><date>2011-08</date><risdate>2011</risdate><spage>788</spage><epage>791</epage><pages>788-791</pages><isbn>1424496659</isbn><isbn>9781424496655</isbn><eisbn>9781424496648</eisbn><eisbn>9781424496662</eisbn><eisbn>1424496640</eisbn><eisbn>1424496667</eisbn><abstract>Since both the information which is existed in an organization and its security play a terrific and significant role in a current competitive world, a stringent planning is required for the Information Security Management System implementation project. In this paper, a planning for executing the mentioned project is proposed by considering five essential processes of project management. Since completion times of some activities are not admissible for the respective project customer, they need to be altered. Thus, a linear programming model with the cost minimization objective function is formulated. In other words, with the model and conditions proposed in this paper, no activity is forced to be eliminated for delivering the project within acceptable time and the dimensions of time, cost, quality and the scope are not sacrificed for one another and they are all noticed simultaneously. This project as it is described in this paper is planned and executed in one of Iranian leading IT-based companies.</abstract><pub>IEEE</pub><doi>10.1109/ICEMMS.2011.6015800</doi><tpages>4</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISBN: 1424496659 |
ispartof | 2011 2nd IEEE International Conference on Emergency Management and Management Sciences, 2011, p.788-791 |
issn | |
language | eng |
recordid | cdi_ieee_primary_6015800 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Companies cost minimization five processes Information security information security management system Linear programming Planning Project management Standards organizations time reduction |
title | PMBOK five process plan for ISMS project implementation considering cost optimization for a time constraint: A case study |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T21%3A10%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=PMBOK%20five%20process%20plan%20for%20ISMS%20project%20implementation%20considering%20cost%20optimization%20for%20a%20time%20constraint:%20A%20case%20study&rft.btitle=2011%202nd%20IEEE%20International%20Conference%20on%20Emergency%20Management%20and%20Management%20Sciences&rft.au=Ghasemabadi,%20M.%20Ahmadzadeh&rft.date=2011-08&rft.spage=788&rft.epage=791&rft.pages=788-791&rft.isbn=1424496659&rft.isbn_list=9781424496655&rft_id=info:doi/10.1109/ICEMMS.2011.6015800&rft_dat=%3Cieee_6IE%3E6015800%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=9781424496648&rft.eisbn_list=9781424496662&rft.eisbn_list=1424496640&rft.eisbn_list=1424496667&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=6015800&rfr_iscdi=true |