Leveraging IT project lifecycle data to predict support costs
There is an intuitive notion that the costs associated with project support actions, currently deemed too high and increasing, are directly related to the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationshi...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 256 |
---|---|
container_issue | |
container_start_page | 249 |
container_title | |
container_volume | |
creator | Dalmazo, B. L. Cordeiro, W. L. Rabelo, L. Wickboldt, J. A. Lunardi, R. C. dos Santos, Ricardo L. Gaspary, L. P. Granville, L. Z. Bartolini, C. Hickey, M. |
description | There is an intuitive notion that the costs associated with project support actions, currently deemed too high and increasing, are directly related to the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper tooling for both sharing information between IT project phases and learning from past experiences. To tackle this issue, in this paper we propose a solution that, leveraging existing IT project lifecycle data, is able to predict support costs. The solution has been evaluated through a case study based on the ISBSG dataset, producing correct estimates for more than 80% of the assessed scenarios. |
doi_str_mv | 10.1109/INM.2011.5990698 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_5990698</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>5990698</ieee_id><sourcerecordid>5990698</sourcerecordid><originalsourceid>FETCH-LOGICAL-i90t-ce5bcb706ae629ba71f00a75e4964140585aeeb00d1631ddd41c9aef29f200a83</originalsourceid><addsrcrecordid>eNotj01LxDAURSMqOI7dC276B1rfS5Omb-FCBj8KVTfdD2n6OkSqLU0U5t9bcFaXyzlcuELcIuSIQPf1-1suATHXRFBSdSauUUmlSErEc5GQqU4dCS7EBrUpMgBjrkQSgu9AVlCVRsNGPDT8y4s9-O9DWrfpvEyf7GI6-oHd0Y2c9jbaNE4r4d6vJPzM87TE1E0hhhtxOdgxcHLKrWifn9rda9Z8vNS7xybzBDFzrDvXGSgtl5I6a3AAsEazolKhAl1py9wB9FgW2Pe9QkeWB0mDXMWq2Iq7_1nPzPt58V92Oe5P54s_dvZLKQ</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Leveraging IT project lifecycle data to predict support costs</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Dalmazo, B. L. ; Cordeiro, W. L. ; Rabelo, L. ; Wickboldt, J. A. ; Lunardi, R. C. ; dos Santos, Ricardo L. ; Gaspary, L. P. ; Granville, L. Z. ; Bartolini, C. ; Hickey, M.</creator><creatorcontrib>Dalmazo, B. L. ; Cordeiro, W. L. ; Rabelo, L. ; Wickboldt, J. A. ; Lunardi, R. C. ; dos Santos, Ricardo L. ; Gaspary, L. P. ; Granville, L. Z. ; Bartolini, C. ; Hickey, M.</creatorcontrib><description>There is an intuitive notion that the costs associated with project support actions, currently deemed too high and increasing, are directly related to the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper tooling for both sharing information between IT project phases and learning from past experiences. To tackle this issue, in this paper we propose a solution that, leveraging existing IT project lifecycle data, is able to predict support costs. The solution has been evaluated through a case study based on the ISBSG dataset, producing correct estimates for more than 80% of the assessed scenarios.</description><identifier>ISSN: 1573-0077</identifier><identifier>ISBN: 9781424492190</identifier><identifier>ISBN: 142449219X</identifier><identifier>EISBN: 1424492211</identifier><identifier>EISBN: 9781424492206</identifier><identifier>EISBN: 9781424492213</identifier><identifier>EISBN: 1424492203</identifier><identifier>DOI: 10.1109/INM.2011.5990698</identifier><language>eng</language><publisher>IEEE</publisher><subject>Bayesian methods ; Computational modeling</subject><ispartof>12th IFIP/IEEE International Symposium on Integrated Network Management (IM 2011) and Workshops, 2011, p.249-256</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/5990698$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/5990698$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Dalmazo, B. L.</creatorcontrib><creatorcontrib>Cordeiro, W. L.</creatorcontrib><creatorcontrib>Rabelo, L.</creatorcontrib><creatorcontrib>Wickboldt, J. A.</creatorcontrib><creatorcontrib>Lunardi, R. C.</creatorcontrib><creatorcontrib>dos Santos, Ricardo L.</creatorcontrib><creatorcontrib>Gaspary, L. P.</creatorcontrib><creatorcontrib>Granville, L. Z.</creatorcontrib><creatorcontrib>Bartolini, C.</creatorcontrib><creatorcontrib>Hickey, M.</creatorcontrib><title>Leveraging IT project lifecycle data to predict support costs</title><title>12th IFIP/IEEE International Symposium on Integrated Network Management (IM 2011) and Workshops</title><addtitle>INM</addtitle><description>There is an intuitive notion that the costs associated with project support actions, currently deemed too high and increasing, are directly related to the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper tooling for both sharing information between IT project phases and learning from past experiences. To tackle this issue, in this paper we propose a solution that, leveraging existing IT project lifecycle data, is able to predict support costs. The solution has been evaluated through a case study based on the ISBSG dataset, producing correct estimates for more than 80% of the assessed scenarios.</description><subject>Bayesian methods</subject><subject>Computational modeling</subject><issn>1573-0077</issn><isbn>9781424492190</isbn><isbn>142449219X</isbn><isbn>1424492211</isbn><isbn>9781424492206</isbn><isbn>9781424492213</isbn><isbn>1424492203</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2011</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNotj01LxDAURSMqOI7dC276B1rfS5Omb-FCBj8KVTfdD2n6OkSqLU0U5t9bcFaXyzlcuELcIuSIQPf1-1suATHXRFBSdSauUUmlSErEc5GQqU4dCS7EBrUpMgBjrkQSgu9AVlCVRsNGPDT8y4s9-O9DWrfpvEyf7GI6-oHd0Y2c9jbaNE4r4d6vJPzM87TE1E0hhhtxOdgxcHLKrWifn9rda9Z8vNS7xybzBDFzrDvXGSgtl5I6a3AAsEazolKhAl1py9wB9FgW2Pe9QkeWB0mDXMWq2Iq7_1nPzPt58V92Oe5P54s_dvZLKQ</recordid><startdate>201105</startdate><enddate>201105</enddate><creator>Dalmazo, B. L.</creator><creator>Cordeiro, W. L.</creator><creator>Rabelo, L.</creator><creator>Wickboldt, J. A.</creator><creator>Lunardi, R. C.</creator><creator>dos Santos, Ricardo L.</creator><creator>Gaspary, L. P.</creator><creator>Granville, L. Z.</creator><creator>Bartolini, C.</creator><creator>Hickey, M.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201105</creationdate><title>Leveraging IT project lifecycle data to predict support costs</title><author>Dalmazo, B. L. ; Cordeiro, W. L. ; Rabelo, L. ; Wickboldt, J. A. ; Lunardi, R. C. ; dos Santos, Ricardo L. ; Gaspary, L. P. ; Granville, L. Z. ; Bartolini, C. ; Hickey, M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i90t-ce5bcb706ae629ba71f00a75e4964140585aeeb00d1631ddd41c9aef29f200a83</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2011</creationdate><topic>Bayesian methods</topic><topic>Computational modeling</topic><toplevel>online_resources</toplevel><creatorcontrib>Dalmazo, B. L.</creatorcontrib><creatorcontrib>Cordeiro, W. L.</creatorcontrib><creatorcontrib>Rabelo, L.</creatorcontrib><creatorcontrib>Wickboldt, J. A.</creatorcontrib><creatorcontrib>Lunardi, R. C.</creatorcontrib><creatorcontrib>dos Santos, Ricardo L.</creatorcontrib><creatorcontrib>Gaspary, L. P.</creatorcontrib><creatorcontrib>Granville, L. Z.</creatorcontrib><creatorcontrib>Bartolini, C.</creatorcontrib><creatorcontrib>Hickey, M.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Xplore</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Dalmazo, B. L.</au><au>Cordeiro, W. L.</au><au>Rabelo, L.</au><au>Wickboldt, J. A.</au><au>Lunardi, R. C.</au><au>dos Santos, Ricardo L.</au><au>Gaspary, L. P.</au><au>Granville, L. Z.</au><au>Bartolini, C.</au><au>Hickey, M.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Leveraging IT project lifecycle data to predict support costs</atitle><btitle>12th IFIP/IEEE International Symposium on Integrated Network Management (IM 2011) and Workshops</btitle><stitle>INM</stitle><date>2011-05</date><risdate>2011</risdate><spage>249</spage><epage>256</epage><pages>249-256</pages><issn>1573-0077</issn><isbn>9781424492190</isbn><isbn>142449219X</isbn><eisbn>1424492211</eisbn><eisbn>9781424492206</eisbn><eisbn>9781424492213</eisbn><eisbn>1424492203</eisbn><abstract>There is an intuitive notion that the costs associated with project support actions, currently deemed too high and increasing, are directly related to the effort spent during their development and test phases. Despite the importance of systematically characterizing and understanding this relationship, little has been done in this realm mainly due to the lack of proper tooling for both sharing information between IT project phases and learning from past experiences. To tackle this issue, in this paper we propose a solution that, leveraging existing IT project lifecycle data, is able to predict support costs. The solution has been evaluated through a case study based on the ISBSG dataset, producing correct estimates for more than 80% of the assessed scenarios.</abstract><pub>IEEE</pub><doi>10.1109/INM.2011.5990698</doi><tpages>8</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISSN: 1573-0077 |
ispartof | 12th IFIP/IEEE International Symposium on Integrated Network Management (IM 2011) and Workshops, 2011, p.249-256 |
issn | 1573-0077 |
language | eng |
recordid | cdi_ieee_primary_5990698 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Bayesian methods Computational modeling |
title | Leveraging IT project lifecycle data to predict support costs |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T19%3A37%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Leveraging%20IT%20project%20lifecycle%20data%20to%20predict%20support%20costs&rft.btitle=12th%20IFIP/IEEE%20International%20Symposium%20on%20Integrated%20Network%20Management%20(IM%202011)%20and%20Workshops&rft.au=Dalmazo,%20B.%20L.&rft.date=2011-05&rft.spage=249&rft.epage=256&rft.pages=249-256&rft.issn=1573-0077&rft.isbn=9781424492190&rft.isbn_list=142449219X&rft_id=info:doi/10.1109/INM.2011.5990698&rft_dat=%3Cieee_6IE%3E5990698%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=1424492211&rft.eisbn_list=9781424492206&rft.eisbn_list=9781424492213&rft.eisbn_list=1424492203&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=5990698&rfr_iscdi=true |