Fully integrated control for a rotor over-speed testing facility
The paper describes the fully digital control system of the new facility for rotor testing of Ansaldo Energia at Genova. This laboratory is used to drive at over-speed the turbine and generator rotors produced by the Ansaldo Factory. This operation is necessary to balance the rotors before their ins...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!