Real-Time Georobot Automatic Monitoring During Shield Under-crossing Existing Tunnel
During under-crossing shield, the monitoring of the existing tunnel has been done by the improved Georobot automatic deformation monitoring system. Results show the iron rails of existing tunnel have some regular settlement, difference settlement and lateral deformation. The vertical and lateral com...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!