Multi objective placement of distributed generation

The distributed generation (DG) interconnection into the distribution network may lead to significant changes in system. The installation of DG must be met network requirement such as: breaking capacity of switchgears, decreasing loss, increasing reliability and voltage quality. Beside, in this work...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Phan Thi Thanh Binh, Nguyen Huu Quoc, Phan Quoc Dung, Le Dinh Khoa
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 489
container_issue
container_start_page 484
container_title
container_volume
creator Phan Thi Thanh Binh
Nguyen Huu Quoc
Phan Quoc Dung
Le Dinh Khoa
description The distributed generation (DG) interconnection into the distribution network may lead to significant changes in system. The installation of DG must be met network requirement such as: breaking capacity of switchgears, decreasing loss, increasing reliability and voltage quality. Beside, in this work, the paper also considers the objective function concerning the utility and DG private owner benefits. The resolving is based on fuzzy set and genetic algorithm (GA). These objectives are chosen more suitable for Vietnamese conditions. The DG with unavailable energy source such as solar and wind are considered. The paper also presented the general case when many types of DG can be involved.
doi_str_mv 10.1109/PEOCO.2010.5559156
format Conference Proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_5559156</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>5559156</ieee_id><sourcerecordid>5559156</sourcerecordid><originalsourceid>FETCH-LOGICAL-i90t-b21ef2ccc279854f48cf5b454580803f5353514a275fabc4674e388baa94fb763</originalsourceid><addsrcrecordid>eNpVj8tqwzAURFVKoCX1D6Qb_4BTPe61pGUx6QNS3EX2QVKuioJjB1sp9O9raDadsxjOZmAYWwm-FoLbp89N27RryWdHRCuwvmGF1UaABNBC1ur2n2t-x4ppOvI5gBIB7pn6uHQ5lYM_Usjpm8pz5wKdqM_lEMtDmvKY_CXTofyinkaX09A_sEV03UTFtZds97LZNW_Vtn19b563VbI8V14KijKEILU1CBFMiOgBAQ03XEVUMwKc1BidD1BrIGWMd85C9LpWS_b4N5uIaH8e08mNP_vrU_ULSmpGZw</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Multi objective placement of distributed generation</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Phan Thi Thanh Binh ; Nguyen Huu Quoc ; Phan Quoc Dung ; Le Dinh Khoa</creator><creatorcontrib>Phan Thi Thanh Binh ; Nguyen Huu Quoc ; Phan Quoc Dung ; Le Dinh Khoa</creatorcontrib><description>The distributed generation (DG) interconnection into the distribution network may lead to significant changes in system. The installation of DG must be met network requirement such as: breaking capacity of switchgears, decreasing loss, increasing reliability and voltage quality. Beside, in this work, the paper also considers the objective function concerning the utility and DG private owner benefits. The resolving is based on fuzzy set and genetic algorithm (GA). These objectives are chosen more suitable for Vietnamese conditions. The DG with unavailable energy source such as solar and wind are considered. The paper also presented the general case when many types of DG can be involved.</description><identifier>ISBN: 9781424471270</identifier><identifier>ISBN: 1424471273</identifier><identifier>EISBN: 9781424471263</identifier><identifier>EISBN: 1424471281</identifier><identifier>EISBN: 1424471265</identifier><identifier>EISBN: 9781424471287</identifier><identifier>DOI: 10.1109/PEOCO.2010.5559156</identifier><language>eng</language><publisher>IEEE</publisher><subject>Availability ; Circuit faults ; Fuses ; Optimization ; Power engineering ; Switches</subject><ispartof>2010 4th International Power Engineering and Optimization Conference (PEOCO), 2010, p.484-489</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/5559156$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/5559156$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Phan Thi Thanh Binh</creatorcontrib><creatorcontrib>Nguyen Huu Quoc</creatorcontrib><creatorcontrib>Phan Quoc Dung</creatorcontrib><creatorcontrib>Le Dinh Khoa</creatorcontrib><title>Multi objective placement of distributed generation</title><title>2010 4th International Power Engineering and Optimization Conference (PEOCO)</title><addtitle>PEOCO</addtitle><description>The distributed generation (DG) interconnection into the distribution network may lead to significant changes in system. The installation of DG must be met network requirement such as: breaking capacity of switchgears, decreasing loss, increasing reliability and voltage quality. Beside, in this work, the paper also considers the objective function concerning the utility and DG private owner benefits. The resolving is based on fuzzy set and genetic algorithm (GA). These objectives are chosen more suitable for Vietnamese conditions. The DG with unavailable energy source such as solar and wind are considered. The paper also presented the general case when many types of DG can be involved.</description><subject>Availability</subject><subject>Circuit faults</subject><subject>Fuses</subject><subject>Optimization</subject><subject>Power engineering</subject><subject>Switches</subject><isbn>9781424471270</isbn><isbn>1424471273</isbn><isbn>9781424471263</isbn><isbn>1424471281</isbn><isbn>1424471265</isbn><isbn>9781424471287</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2010</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNpVj8tqwzAURFVKoCX1D6Qb_4BTPe61pGUx6QNS3EX2QVKuioJjB1sp9O9raDadsxjOZmAYWwm-FoLbp89N27RryWdHRCuwvmGF1UaABNBC1ur2n2t-x4ppOvI5gBIB7pn6uHQ5lYM_Usjpm8pz5wKdqM_lEMtDmvKY_CXTofyinkaX09A_sEV03UTFtZds97LZNW_Vtn19b563VbI8V14KijKEILU1CBFMiOgBAQ03XEVUMwKc1BidD1BrIGWMd85C9LpWS_b4N5uIaH8e08mNP_vrU_ULSmpGZw</recordid><startdate>201006</startdate><enddate>201006</enddate><creator>Phan Thi Thanh Binh</creator><creator>Nguyen Huu Quoc</creator><creator>Phan Quoc Dung</creator><creator>Le Dinh Khoa</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>201006</creationdate><title>Multi objective placement of distributed generation</title><author>Phan Thi Thanh Binh ; Nguyen Huu Quoc ; Phan Quoc Dung ; Le Dinh Khoa</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i90t-b21ef2ccc279854f48cf5b454580803f5353514a275fabc4674e388baa94fb763</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Availability</topic><topic>Circuit faults</topic><topic>Fuses</topic><topic>Optimization</topic><topic>Power engineering</topic><topic>Switches</topic><toplevel>online_resources</toplevel><creatorcontrib>Phan Thi Thanh Binh</creatorcontrib><creatorcontrib>Nguyen Huu Quoc</creatorcontrib><creatorcontrib>Phan Quoc Dung</creatorcontrib><creatorcontrib>Le Dinh Khoa</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Phan Thi Thanh Binh</au><au>Nguyen Huu Quoc</au><au>Phan Quoc Dung</au><au>Le Dinh Khoa</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Multi objective placement of distributed generation</atitle><btitle>2010 4th International Power Engineering and Optimization Conference (PEOCO)</btitle><stitle>PEOCO</stitle><date>2010-06</date><risdate>2010</risdate><spage>484</spage><epage>489</epage><pages>484-489</pages><isbn>9781424471270</isbn><isbn>1424471273</isbn><eisbn>9781424471263</eisbn><eisbn>1424471281</eisbn><eisbn>1424471265</eisbn><eisbn>9781424471287</eisbn><abstract>The distributed generation (DG) interconnection into the distribution network may lead to significant changes in system. The installation of DG must be met network requirement such as: breaking capacity of switchgears, decreasing loss, increasing reliability and voltage quality. Beside, in this work, the paper also considers the objective function concerning the utility and DG private owner benefits. The resolving is based on fuzzy set and genetic algorithm (GA). These objectives are chosen more suitable for Vietnamese conditions. The DG with unavailable energy source such as solar and wind are considered. The paper also presented the general case when many types of DG can be involved.</abstract><pub>IEEE</pub><doi>10.1109/PEOCO.2010.5559156</doi><tpages>6</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISBN: 9781424471270
ispartof 2010 4th International Power Engineering and Optimization Conference (PEOCO), 2010, p.484-489
issn
language eng
recordid cdi_ieee_primary_5559156
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Availability
Circuit faults
Fuses
Optimization
Power engineering
Switches
title Multi objective placement of distributed generation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T12%3A55%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Multi%20objective%20placement%20of%20distributed%20generation&rft.btitle=2010%204th%20International%20Power%20Engineering%20and%20Optimization%20Conference%20(PEOCO)&rft.au=Phan%20Thi%20Thanh%20Binh&rft.date=2010-06&rft.spage=484&rft.epage=489&rft.pages=484-489&rft.isbn=9781424471270&rft.isbn_list=1424471273&rft_id=info:doi/10.1109/PEOCO.2010.5559156&rft_dat=%3Cieee_6IE%3E5559156%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=9781424471263&rft.eisbn_list=1424471281&rft.eisbn_list=1424471265&rft.eisbn_list=9781424471287&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=5559156&rfr_iscdi=true