Optimization-based decision support algorithms for a team-in-the-loop planning experiment

Asset assignment and scheduling algorithms were developed and implemented to support a team-in-the-loop planning experiment conducted at the Naval Postgraduate School (NPS) in March 2009. The experiment examined planning and information flows among three cells in an abstracted and simplified Maritim...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Huy Bui, Xu Han, Mandal, S., Pattipati, K.R., Kleinman, D.L.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 4689
container_issue
container_start_page 4684
container_title
container_volume
creator Huy Bui
Xu Han
Mandal, S.
Pattipati, K.R.
Kleinman, D.L.
description Asset assignment and scheduling algorithms were developed and implemented to support a team-in-the-loop planning experiment conducted at the Naval Postgraduate School (NPS) in March 2009. The experiment examined planning and information flows among three cells in an abstracted and simplified Maritime Operations Center (MOC). This paper describes two optimization-based modules that focused on the Future Operations (FOPS) cell's planning activities. Module 1, a FOPS Planning Module, was a decision aid that presented the planners with N-best asset packages that would meet individual task requirements, while maximizing task execution accuracy. Module 2, a Scheduling Module, was an optimization-based scheduling algorithm that was used by experiment designers to set the conditions for the mission planning activity (e.g., asset types and numbers, task requirements and asset capabilities), and to assure that the tasks presented to the human planners would be achievable to a specified level of accuracy. A third module, termed Current Operations (COPS) Risk Analysis module, not discussed in detail here, was also implemented to assist COPS players on the consequences of redirecting assets from an ongoing task.
doi_str_mv 10.1109/ICSMC.2009.5346103
format Conference Proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_5346103</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>5346103</ieee_id><sourcerecordid>5346103</sourcerecordid><originalsourceid>FETCH-LOGICAL-i175t-ed1b833f47e7721870ca221308494e38b20731510002f6add2658a66506225903</originalsourceid><addsrcrecordid>eNpVUMlKA0EUbJeAScwP6KV_oOPr1_tRBpdAJAcV9BR6Mj1Jy2zMtKB-vQPm4qkoCmoj5IrDknNwN6vs-SlbIoBbKiE1B3FCFs5YLlFKNE66UzJFZQzjWqmzf5rAczLloJE5xLcJmY021oHWFi7IbBg-ABAkt1PyvulSrOOPT7FtWO6HUNAi7OIwUjp8dl3bJ-qrfdvHdKgHWrY99TQFX7PYsHQIrGrbjnaVb5rY7Gn46kIf69CkSzIpfTWExRHn5PX-7iV7ZOvNwyq7XbPIjUosFDy3QpTSBGOQWwM7j8gFWOlkEDZHMIIrDmPlUvuiQK2s11qN61A5EHNy_ecbQwjbbgz3_ff2eJn4BeLJWLs</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Optimization-based decision support algorithms for a team-in-the-loop planning experiment</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Huy Bui ; Xu Han ; Mandal, S. ; Pattipati, K.R. ; Kleinman, D.L.</creator><creatorcontrib>Huy Bui ; Xu Han ; Mandal, S. ; Pattipati, K.R. ; Kleinman, D.L.</creatorcontrib><description>Asset assignment and scheduling algorithms were developed and implemented to support a team-in-the-loop planning experiment conducted at the Naval Postgraduate School (NPS) in March 2009. The experiment examined planning and information flows among three cells in an abstracted and simplified Maritime Operations Center (MOC). This paper describes two optimization-based modules that focused on the Future Operations (FOPS) cell's planning activities. Module 1, a FOPS Planning Module, was a decision aid that presented the planners with N-best asset packages that would meet individual task requirements, while maximizing task execution accuracy. Module 2, a Scheduling Module, was an optimization-based scheduling algorithm that was used by experiment designers to set the conditions for the mission planning activity (e.g., asset types and numbers, task requirements and asset capabilities), and to assure that the tasks presented to the human planners would be achievable to a specified level of accuracy. A third module, termed Current Operations (COPS) Risk Analysis module, not discussed in detail here, was also implemented to assist COPS players on the consequences of redirecting assets from an ongoing task.</description><identifier>ISSN: 1062-922X</identifier><identifier>ISBN: 9781424427932</identifier><identifier>ISBN: 1424427932</identifier><identifier>EISSN: 2577-1655</identifier><identifier>EISBN: 9781424427949</identifier><identifier>EISBN: 1424427940</identifier><identifier>DOI: 10.1109/ICSMC.2009.5346103</identifier><identifier>LCCN: 2008906680</identifier><language>eng</language><publisher>IEEE</publisher><subject>asset packages ; Collaboration ; Command and control systems ; Cybernetics ; decision aids ; Humans ; Meeting planning ; mission planning ; mixed integer programming ; N-best assignments ; Packaging ; Predictive models ; Process planning ; scheduling ; Scheduling algorithm ; USA Councils</subject><ispartof>2009 IEEE International Conference on Systems, Man and Cybernetics, 2009, p.4684-4689</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/5346103$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/5346103$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Huy Bui</creatorcontrib><creatorcontrib>Xu Han</creatorcontrib><creatorcontrib>Mandal, S.</creatorcontrib><creatorcontrib>Pattipati, K.R.</creatorcontrib><creatorcontrib>Kleinman, D.L.</creatorcontrib><title>Optimization-based decision support algorithms for a team-in-the-loop planning experiment</title><title>2009 IEEE International Conference on Systems, Man and Cybernetics</title><addtitle>ICSMC</addtitle><description>Asset assignment and scheduling algorithms were developed and implemented to support a team-in-the-loop planning experiment conducted at the Naval Postgraduate School (NPS) in March 2009. The experiment examined planning and information flows among three cells in an abstracted and simplified Maritime Operations Center (MOC). This paper describes two optimization-based modules that focused on the Future Operations (FOPS) cell's planning activities. Module 1, a FOPS Planning Module, was a decision aid that presented the planners with N-best asset packages that would meet individual task requirements, while maximizing task execution accuracy. Module 2, a Scheduling Module, was an optimization-based scheduling algorithm that was used by experiment designers to set the conditions for the mission planning activity (e.g., asset types and numbers, task requirements and asset capabilities), and to assure that the tasks presented to the human planners would be achievable to a specified level of accuracy. A third module, termed Current Operations (COPS) Risk Analysis module, not discussed in detail here, was also implemented to assist COPS players on the consequences of redirecting assets from an ongoing task.</description><subject>asset packages</subject><subject>Collaboration</subject><subject>Command and control systems</subject><subject>Cybernetics</subject><subject>decision aids</subject><subject>Humans</subject><subject>Meeting planning</subject><subject>mission planning</subject><subject>mixed integer programming</subject><subject>N-best assignments</subject><subject>Packaging</subject><subject>Predictive models</subject><subject>Process planning</subject><subject>scheduling</subject><subject>Scheduling algorithm</subject><subject>USA Councils</subject><issn>1062-922X</issn><issn>2577-1655</issn><isbn>9781424427932</isbn><isbn>1424427932</isbn><isbn>9781424427949</isbn><isbn>1424427940</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2009</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNpVUMlKA0EUbJeAScwP6KV_oOPr1_tRBpdAJAcV9BR6Mj1Jy2zMtKB-vQPm4qkoCmoj5IrDknNwN6vs-SlbIoBbKiE1B3FCFs5YLlFKNE66UzJFZQzjWqmzf5rAczLloJE5xLcJmY021oHWFi7IbBg-ABAkt1PyvulSrOOPT7FtWO6HUNAi7OIwUjp8dl3bJ-qrfdvHdKgHWrY99TQFX7PYsHQIrGrbjnaVb5rY7Gn46kIf69CkSzIpfTWExRHn5PX-7iV7ZOvNwyq7XbPIjUosFDy3QpTSBGOQWwM7j8gFWOlkEDZHMIIrDmPlUvuiQK2s11qN61A5EHNy_ecbQwjbbgz3_ff2eJn4BeLJWLs</recordid><startdate>200910</startdate><enddate>200910</enddate><creator>Huy Bui</creator><creator>Xu Han</creator><creator>Mandal, S.</creator><creator>Pattipati, K.R.</creator><creator>Kleinman, D.L.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>200910</creationdate><title>Optimization-based decision support algorithms for a team-in-the-loop planning experiment</title><author>Huy Bui ; Xu Han ; Mandal, S. ; Pattipati, K.R. ; Kleinman, D.L.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i175t-ed1b833f47e7721870ca221308494e38b20731510002f6add2658a66506225903</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2009</creationdate><topic>asset packages</topic><topic>Collaboration</topic><topic>Command and control systems</topic><topic>Cybernetics</topic><topic>decision aids</topic><topic>Humans</topic><topic>Meeting planning</topic><topic>mission planning</topic><topic>mixed integer programming</topic><topic>N-best assignments</topic><topic>Packaging</topic><topic>Predictive models</topic><topic>Process planning</topic><topic>scheduling</topic><topic>Scheduling algorithm</topic><topic>USA Councils</topic><toplevel>online_resources</toplevel><creatorcontrib>Huy Bui</creatorcontrib><creatorcontrib>Xu Han</creatorcontrib><creatorcontrib>Mandal, S.</creatorcontrib><creatorcontrib>Pattipati, K.R.</creatorcontrib><creatorcontrib>Kleinman, D.L.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Huy Bui</au><au>Xu Han</au><au>Mandal, S.</au><au>Pattipati, K.R.</au><au>Kleinman, D.L.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Optimization-based decision support algorithms for a team-in-the-loop planning experiment</atitle><btitle>2009 IEEE International Conference on Systems, Man and Cybernetics</btitle><stitle>ICSMC</stitle><date>2009-10</date><risdate>2009</risdate><spage>4684</spage><epage>4689</epage><pages>4684-4689</pages><issn>1062-922X</issn><eissn>2577-1655</eissn><isbn>9781424427932</isbn><isbn>1424427932</isbn><eisbn>9781424427949</eisbn><eisbn>1424427940</eisbn><abstract>Asset assignment and scheduling algorithms were developed and implemented to support a team-in-the-loop planning experiment conducted at the Naval Postgraduate School (NPS) in March 2009. The experiment examined planning and information flows among three cells in an abstracted and simplified Maritime Operations Center (MOC). This paper describes two optimization-based modules that focused on the Future Operations (FOPS) cell's planning activities. Module 1, a FOPS Planning Module, was a decision aid that presented the planners with N-best asset packages that would meet individual task requirements, while maximizing task execution accuracy. Module 2, a Scheduling Module, was an optimization-based scheduling algorithm that was used by experiment designers to set the conditions for the mission planning activity (e.g., asset types and numbers, task requirements and asset capabilities), and to assure that the tasks presented to the human planners would be achievable to a specified level of accuracy. A third module, termed Current Operations (COPS) Risk Analysis module, not discussed in detail here, was also implemented to assist COPS players on the consequences of redirecting assets from an ongoing task.</abstract><pub>IEEE</pub><doi>10.1109/ICSMC.2009.5346103</doi><tpages>6</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 1062-922X
ispartof 2009 IEEE International Conference on Systems, Man and Cybernetics, 2009, p.4684-4689
issn 1062-922X
2577-1655
language eng
recordid cdi_ieee_primary_5346103
source IEEE Electronic Library (IEL) Conference Proceedings
subjects asset packages
Collaboration
Command and control systems
Cybernetics
decision aids
Humans
Meeting planning
mission planning
mixed integer programming
N-best assignments
Packaging
Predictive models
Process planning
scheduling
Scheduling algorithm
USA Councils
title Optimization-based decision support algorithms for a team-in-the-loop planning experiment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T17%3A31%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Optimization-based%20decision%20support%20algorithms%20for%20a%20team-in-the-loop%20planning%20experiment&rft.btitle=2009%20IEEE%20International%20Conference%20on%20Systems,%20Man%20and%20Cybernetics&rft.au=Huy%20Bui&rft.date=2009-10&rft.spage=4684&rft.epage=4689&rft.pages=4684-4689&rft.issn=1062-922X&rft.eissn=2577-1655&rft.isbn=9781424427932&rft.isbn_list=1424427932&rft_id=info:doi/10.1109/ICSMC.2009.5346103&rft_dat=%3Cieee_6IE%3E5346103%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=9781424427949&rft.eisbn_list=1424427940&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=5346103&rfr_iscdi=true