Optimal work breaks in deterministic and probabilistic repetitive projects
An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for de...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Tagungsbericht |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 2150 |
---|---|
container_issue | |
container_start_page | 2141 |
container_title | |
container_volume | |
creator | Ioannou, P.G. Srisuwanrat, C. |
description | An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for determining the optimal location and duration of work breaks for both deterministic and probabilistic activity durations. The procedure is described in detail and is applied to an example project with 9 activities with probabilistic durations that repeat over 10 similar work units. The solution employs concepts from the Repetitive Scheduling Method (RSM), the Sequence Step Algorithm (SQS-AL), and is modeled in STROBOSCOPE, an activity-based simulation system. Numerical and graphical results explain the process and the underlying time and cost tradeoffs. |
doi_str_mv | 10.1109/WSC.2007.4419848 |
format | Conference Proceeding |
fullrecord | <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_4419848</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4419848</ieee_id><sourcerecordid>4419848</sourcerecordid><originalsourceid>FETCH-LOGICAL-i1328-1d0405921bbfa4f18c4e78dc74a938d7d48bfee1fc04d881b7b5b37989932b1b3</originalsourceid><addsrcrecordid>eNpVkMtqwzAURNUXNE2zL3SjH7Crq0d0tSymTwJZtKXLIFnXoMRxjGxa-vdNSTZdDTMHhmEYuwFRAgh39_lWlVIIW2oNDjWesJmzCFruvRJzc8omYAwWWglz9o8ZPGcTgQ4Ka9X8kl0Nw1oIQANywl6X_Zi2vuXfu7zhIZPfDDx1PNJIeZu6NIyp5r6LvM-74ENqD0mmnsY0pi_6A2uqx-GaXTS-HWh21Cn7eHx4r56LxfLppbpfFAmUxAKi0MI4CSE0XjeAtSaLsbbaO4XRRo2hIYKmFjoiQrDBBGUdOqdkgKCm7PbQm4ho1ef9_PyzOt6ifgHvOlJ5</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>Optimal work breaks in deterministic and probabilistic repetitive projects</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Ioannou, P.G. ; Srisuwanrat, C.</creator><creatorcontrib>Ioannou, P.G. ; Srisuwanrat, C.</creatorcontrib><description>An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for determining the optimal location and duration of work breaks for both deterministic and probabilistic activity durations. The procedure is described in detail and is applied to an example project with 9 activities with probabilistic durations that repeat over 10 similar work units. The solution employs concepts from the Repetitive Scheduling Method (RSM), the Sequence Step Algorithm (SQS-AL), and is modeled in STROBOSCOPE, an activity-based simulation system. Numerical and graphical results explain the process and the underlying time and cost tradeoffs.</description><identifier>ISSN: 0891-7736</identifier><identifier>ISBN: 9781424413058</identifier><identifier>ISBN: 1424413052</identifier><identifier>EISSN: 1558-4305</identifier><identifier>EISBN: 9781424413065</identifier><identifier>EISBN: 1424413060</identifier><identifier>DOI: 10.1109/WSC.2007.4419848</identifier><language>eng</language><publisher>IEEE</publisher><subject>Buildings ; Continuous production ; Costs ; Delay ; Floors ; Road transportation ; Scheduling algorithm ; Tunneling</subject><ispartof>2007 Winter Simulation Conference, 2007, p.2141-2150</ispartof><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4419848$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>310,311,781,785,790,791,2059,27930,54925</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4419848$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Ioannou, P.G.</creatorcontrib><creatorcontrib>Srisuwanrat, C.</creatorcontrib><title>Optimal work breaks in deterministic and probabilistic repetitive projects</title><title>2007 Winter Simulation Conference</title><addtitle>WSC</addtitle><description>An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for determining the optimal location and duration of work breaks for both deterministic and probabilistic activity durations. The procedure is described in detail and is applied to an example project with 9 activities with probabilistic durations that repeat over 10 similar work units. The solution employs concepts from the Repetitive Scheduling Method (RSM), the Sequence Step Algorithm (SQS-AL), and is modeled in STROBOSCOPE, an activity-based simulation system. Numerical and graphical results explain the process and the underlying time and cost tradeoffs.</description><subject>Buildings</subject><subject>Continuous production</subject><subject>Costs</subject><subject>Delay</subject><subject>Floors</subject><subject>Road transportation</subject><subject>Scheduling algorithm</subject><subject>Tunneling</subject><issn>0891-7736</issn><issn>1558-4305</issn><isbn>9781424413058</isbn><isbn>1424413052</isbn><isbn>9781424413065</isbn><isbn>1424413060</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>2007</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNpVkMtqwzAURNUXNE2zL3SjH7Crq0d0tSymTwJZtKXLIFnXoMRxjGxa-vdNSTZdDTMHhmEYuwFRAgh39_lWlVIIW2oNDjWesJmzCFruvRJzc8omYAwWWglz9o8ZPGcTgQ4Ka9X8kl0Nw1oIQANywl6X_Zi2vuXfu7zhIZPfDDx1PNJIeZu6NIyp5r6LvM-74ENqD0mmnsY0pi_6A2uqx-GaXTS-HWh21Cn7eHx4r56LxfLppbpfFAmUxAKi0MI4CSE0XjeAtSaLsbbaO4XRRo2hIYKmFjoiQrDBBGUdOqdkgKCm7PbQm4ho1ef9_PyzOt6ifgHvOlJ5</recordid><startdate>200712</startdate><enddate>200712</enddate><creator>Ioannou, P.G.</creator><creator>Srisuwanrat, C.</creator><general>IEEE</general><scope>6IE</scope><scope>6IH</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIO</scope></search><sort><creationdate>200712</creationdate><title>Optimal work breaks in deterministic and probabilistic repetitive projects</title><author>Ioannou, P.G. ; Srisuwanrat, C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i1328-1d0405921bbfa4f18c4e78dc74a938d7d48bfee1fc04d881b7b5b37989932b1b3</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>2007</creationdate><topic>Buildings</topic><topic>Continuous production</topic><topic>Costs</topic><topic>Delay</topic><topic>Floors</topic><topic>Road transportation</topic><topic>Scheduling algorithm</topic><topic>Tunneling</topic><toplevel>online_resources</toplevel><creatorcontrib>Ioannou, P.G.</creatorcontrib><creatorcontrib>Srisuwanrat, C.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan (POP) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP) 1998-present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Ioannou, P.G.</au><au>Srisuwanrat, C.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>Optimal work breaks in deterministic and probabilistic repetitive projects</atitle><btitle>2007 Winter Simulation Conference</btitle><stitle>WSC</stitle><date>2007-12</date><risdate>2007</risdate><spage>2141</spage><epage>2150</epage><pages>2141-2150</pages><issn>0891-7736</issn><eissn>1558-4305</eissn><isbn>9781424413058</isbn><isbn>1424413052</isbn><eisbn>9781424413065</eisbn><eisbn>1424413060</eisbn><abstract>An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for determining the optimal location and duration of work breaks for both deterministic and probabilistic activity durations. The procedure is described in detail and is applied to an example project with 9 activities with probabilistic durations that repeat over 10 similar work units. The solution employs concepts from the Repetitive Scheduling Method (RSM), the Sequence Step Algorithm (SQS-AL), and is modeled in STROBOSCOPE, an activity-based simulation system. Numerical and graphical results explain the process and the underlying time and cost tradeoffs.</abstract><pub>IEEE</pub><doi>10.1109/WSC.2007.4419848</doi><tpages>10</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISSN: 0891-7736 |
ispartof | 2007 Winter Simulation Conference, 2007, p.2141-2150 |
issn | 0891-7736 1558-4305 |
language | eng |
recordid | cdi_ieee_primary_4419848 |
source | IEEE Electronic Library (IEL) Conference Proceedings |
subjects | Buildings Continuous production Costs Delay Floors Road transportation Scheduling algorithm Tunneling |
title | Optimal work breaks in deterministic and probabilistic repetitive projects |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-15T00%3A53%3A54IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=Optimal%20work%20breaks%20in%20deterministic%20and%20probabilistic%20repetitive%20projects&rft.btitle=2007%20Winter%20Simulation%20Conference&rft.au=Ioannou,%20P.G.&rft.date=2007-12&rft.spage=2141&rft.epage=2150&rft.pages=2141-2150&rft.issn=0891-7736&rft.eissn=1558-4305&rft.isbn=9781424413058&rft.isbn_list=1424413052&rft_id=info:doi/10.1109/WSC.2007.4419848&rft_dat=%3Cieee_6IE%3E4419848%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&rft.eisbn=9781424413065&rft.eisbn_list=1424413060&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4419848&rfr_iscdi=true |