Implication of Grid Code Requirements on Reactive Power Contribution and Voltage Control Strategies for Wind Power Integration

The exploitation of wind power is often limited due to the weak interconnection to the main grid. Little consideration given to the different boundary conditions, can either limit the exploitation of potential sites, or increase considerably the costs of integration. This paper explains the relation...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Di Marzio, G., Eek, J., Tande, J.O., Fosso, O.B.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!