Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project

The design, construction, and testing of one of the world's highest altitude high head pumped-storage projects presented extraordinary challenges to equipment designers, project design and construction engineers, as well as the testing and operating engineers. Considerations are described that...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power apparatus and systems 1968-03, Vol.PAS-87 (3), p.844-854
Hauptverfasser: Robertson, Lawrence M., Burt, Lawrence S., Eastom, Frederick W., Hubbard, Clyde W., Brennan, Francis L., Fuller, Jackson F., Johrde, Paul S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 854
container_issue 3
container_start_page 844
container_title IEEE transactions on power apparatus and systems
container_volume PAS-87
creator Robertson, Lawrence M.
Burt, Lawrence S.
Eastom, Frederick W.
Hubbard, Clyde W.
Brennan, Francis L.
Fuller, Jackson F.
Johrde, Paul S.
description The design, construction, and testing of one of the world's highest altitude high head pumped-storage projects presented extraordinary challenges to equipment designers, project design and construction engineers, as well as the testing and operating engineers. Considerations are described that lead to the selection of the major equipment, including the demands of high altitude upon the electrical design criterion. The two generator/motors are believed to be the world's largest 360 r/min synchronous machines. Special procedures for separate balancing of the generator/motor before coupling to the pump/turbine, and balancing techniques utilizing a full range of controlled speed balancing steps made possible by the wound rotor induction starting motor, have resulted in completed machines having exceptionally fine balance. The extensive instrumentation has provided not only a sound basis of testing during start-up, but also a complete hydraulic, mechanical, and electrical record of initial plant and system performance.
doi_str_mv 10.1109/TPAS.1968.292200
format Article
fullrecord <record><control><sourceid>crossref_RIE</sourceid><recordid>TN_cdi_ieee_primary_4073570</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4073570</ieee_id><sourcerecordid>10_1109_TPAS_1968_292200</sourcerecordid><originalsourceid>FETCH-LOGICAL-c263t-b918f262c785c710dd45deb77c6bd8219bd7a9d84eb5775311b69f1452db92343</originalsourceid><addsrcrecordid>eNo9kLFOwzAURS0EEqWwI7H4B1Les2M7HqtQKFIlilrmKLZfqpQ2qeww8Pe0asV073DPHQ5jjwgTRLDP6-V0NUGri4mwQgBcsZGwVmVaCnnNRgBYZFYh3LK7lLYAEjTiiH3OduSH2Pp6x18otZuO113ga0pD22143_Cydm3Hy0j0zZc_-wOFbDX0sd4Qn_-G2NPlgC9jvz3We3bT1LtED5ccs6_X2bqcZ4uPt_dyusi80HLInMWiEVp4UyhvEELIVSBnjNcuFAKtC6a2ocjJKWOURHTaNpgrEZwVMpdjBudfH_uUIjXVIbb7Ov5WCNVJSXVSUp2UVGclR-TpjLRE9D_PwUhlQP4BWftc5Q</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project</title><source>IEEE Electronic Library (IEL)</source><creator>Robertson, Lawrence M. ; Burt, Lawrence S. ; Eastom, Frederick W. ; Hubbard, Clyde W. ; Brennan, Francis L. ; Fuller, Jackson F. ; Johrde, Paul S.</creator><creatorcontrib>Robertson, Lawrence M. ; Burt, Lawrence S. ; Eastom, Frederick W. ; Hubbard, Clyde W. ; Brennan, Francis L. ; Fuller, Jackson F. ; Johrde, Paul S.</creatorcontrib><description>The design, construction, and testing of one of the world's highest altitude high head pumped-storage projects presented extraordinary challenges to equipment designers, project design and construction engineers, as well as the testing and operating engineers. Considerations are described that lead to the selection of the major equipment, including the demands of high altitude upon the electrical design criterion. The two generator/motors are believed to be the world's largest 360 r/min synchronous machines. Special procedures for separate balancing of the generator/motor before coupling to the pump/turbine, and balancing techniques utilizing a full range of controlled speed balancing steps made possible by the wound rotor induction starting motor, have resulted in completed machines having exceptionally fine balance. The extensive instrumentation has provided not only a sound basis of testing during start-up, but also a complete hydraulic, mechanical, and electrical record of initial plant and system performance.</description><identifier>ISSN: 0018-9510</identifier><identifier>EISSN: 2995-6323</identifier><identifier>DOI: 10.1109/TPAS.1968.292200</identifier><language>eng</language><publisher>IEEE</publisher><subject>Couplings ; Design engineering ; Induction generators ; Induction motors ; Magnetic heads ; Pumps ; Synchronous generators ; Synchronous machines ; Synchronous motors ; Testing</subject><ispartof>IEEE transactions on power apparatus and systems, 1968-03, Vol.PAS-87 (3), p.844-854</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c263t-b918f262c785c710dd45deb77c6bd8219bd7a9d84eb5775311b69f1452db92343</citedby><cites>FETCH-LOGICAL-c263t-b918f262c785c710dd45deb77c6bd8219bd7a9d84eb5775311b69f1452db92343</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4073570$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,776,780,792,27903,27904,54737</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4073570$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Robertson, Lawrence M.</creatorcontrib><creatorcontrib>Burt, Lawrence S.</creatorcontrib><creatorcontrib>Eastom, Frederick W.</creatorcontrib><creatorcontrib>Hubbard, Clyde W.</creatorcontrib><creatorcontrib>Brennan, Francis L.</creatorcontrib><creatorcontrib>Fuller, Jackson F.</creatorcontrib><creatorcontrib>Johrde, Paul S.</creatorcontrib><title>Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project</title><title>IEEE transactions on power apparatus and systems</title><addtitle>T-PAS</addtitle><description>The design, construction, and testing of one of the world's highest altitude high head pumped-storage projects presented extraordinary challenges to equipment designers, project design and construction engineers, as well as the testing and operating engineers. Considerations are described that lead to the selection of the major equipment, including the demands of high altitude upon the electrical design criterion. The two generator/motors are believed to be the world's largest 360 r/min synchronous machines. Special procedures for separate balancing of the generator/motor before coupling to the pump/turbine, and balancing techniques utilizing a full range of controlled speed balancing steps made possible by the wound rotor induction starting motor, have resulted in completed machines having exceptionally fine balance. The extensive instrumentation has provided not only a sound basis of testing during start-up, but also a complete hydraulic, mechanical, and electrical record of initial plant and system performance.</description><subject>Couplings</subject><subject>Design engineering</subject><subject>Induction generators</subject><subject>Induction motors</subject><subject>Magnetic heads</subject><subject>Pumps</subject><subject>Synchronous generators</subject><subject>Synchronous machines</subject><subject>Synchronous motors</subject><subject>Testing</subject><issn>0018-9510</issn><issn>2995-6323</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1968</creationdate><recordtype>article</recordtype><recordid>eNo9kLFOwzAURS0EEqWwI7H4B1Les2M7HqtQKFIlilrmKLZfqpQ2qeww8Pe0asV073DPHQ5jjwgTRLDP6-V0NUGri4mwQgBcsZGwVmVaCnnNRgBYZFYh3LK7lLYAEjTiiH3OduSH2Pp6x18otZuO113ga0pD22143_Cydm3Hy0j0zZc_-wOFbDX0sd4Qn_-G2NPlgC9jvz3We3bT1LtED5ccs6_X2bqcZ4uPt_dyusi80HLInMWiEVp4UyhvEELIVSBnjNcuFAKtC6a2ocjJKWOURHTaNpgrEZwVMpdjBudfH_uUIjXVIbb7Ov5WCNVJSXVSUp2UVGclR-TpjLRE9D_PwUhlQP4BWftc5Q</recordid><startdate>196803</startdate><enddate>196803</enddate><creator>Robertson, Lawrence M.</creator><creator>Burt, Lawrence S.</creator><creator>Eastom, Frederick W.</creator><creator>Hubbard, Clyde W.</creator><creator>Brennan, Francis L.</creator><creator>Fuller, Jackson F.</creator><creator>Johrde, Paul S.</creator><general>IEEE</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>196803</creationdate><title>Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project</title><author>Robertson, Lawrence M. ; Burt, Lawrence S. ; Eastom, Frederick W. ; Hubbard, Clyde W. ; Brennan, Francis L. ; Fuller, Jackson F. ; Johrde, Paul S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c263t-b918f262c785c710dd45deb77c6bd8219bd7a9d84eb5775311b69f1452db92343</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1968</creationdate><topic>Couplings</topic><topic>Design engineering</topic><topic>Induction generators</topic><topic>Induction motors</topic><topic>Magnetic heads</topic><topic>Pumps</topic><topic>Synchronous generators</topic><topic>Synchronous machines</topic><topic>Synchronous motors</topic><topic>Testing</topic><toplevel>online_resources</toplevel><creatorcontrib>Robertson, Lawrence M.</creatorcontrib><creatorcontrib>Burt, Lawrence S.</creatorcontrib><creatorcontrib>Eastom, Frederick W.</creatorcontrib><creatorcontrib>Hubbard, Clyde W.</creatorcontrib><creatorcontrib>Brennan, Francis L.</creatorcontrib><creatorcontrib>Fuller, Jackson F.</creatorcontrib><creatorcontrib>Johrde, Paul S.</creatorcontrib><collection>CrossRef</collection><jtitle>IEEE transactions on power apparatus and systems</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Robertson, Lawrence M.</au><au>Burt, Lawrence S.</au><au>Eastom, Frederick W.</au><au>Hubbard, Clyde W.</au><au>Brennan, Francis L.</au><au>Fuller, Jackson F.</au><au>Johrde, Paul S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project</atitle><jtitle>IEEE transactions on power apparatus and systems</jtitle><stitle>T-PAS</stitle><date>1968-03</date><risdate>1968</risdate><volume>PAS-87</volume><issue>3</issue><spage>844</spage><epage>854</epage><pages>844-854</pages><issn>0018-9510</issn><eissn>2995-6323</eissn><abstract>The design, construction, and testing of one of the world's highest altitude high head pumped-storage projects presented extraordinary challenges to equipment designers, project design and construction engineers, as well as the testing and operating engineers. Considerations are described that lead to the selection of the major equipment, including the demands of high altitude upon the electrical design criterion. The two generator/motors are believed to be the world's largest 360 r/min synchronous machines. Special procedures for separate balancing of the generator/motor before coupling to the pump/turbine, and balancing techniques utilizing a full range of controlled speed balancing steps made possible by the wound rotor induction starting motor, have resulted in completed machines having exceptionally fine balance. The extensive instrumentation has provided not only a sound basis of testing during start-up, but also a complete hydraulic, mechanical, and electrical record of initial plant and system performance.</abstract><pub>IEEE</pub><doi>10.1109/TPAS.1968.292200</doi><tpages>11</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 0018-9510
ispartof IEEE transactions on power apparatus and systems, 1968-03, Vol.PAS-87 (3), p.844-854
issn 0018-9510
2995-6323
language eng
recordid cdi_ieee_primary_4073570
source IEEE Electronic Library (IEL)
subjects Couplings
Design engineering
Induction generators
Induction motors
Magnetic heads
Pumps
Synchronous generators
Synchronous machines
Synchronous motors
Testing
title Electrical Design and Testing of Cabin Creek Pumped-Storage Hydroelectric Project
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T01%3A25%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_RIE&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Electrical%20Design%20and%20Testing%20of%20Cabin%20Creek%20Pumped-Storage%20Hydroelectric%20Project&rft.jtitle=IEEE%20transactions%20on%20power%20apparatus%20and%20systems&rft.au=Robertson,%20Lawrence%20M.&rft.date=1968-03&rft.volume=PAS-87&rft.issue=3&rft.spage=844&rft.epage=854&rft.pages=844-854&rft.issn=0018-9510&rft.eissn=2995-6323&rft_id=info:doi/10.1109/TPAS.1968.292200&rft_dat=%3Ccrossref_RIE%3E10_1109_TPAS_1968_292200%3C/crossref_RIE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4073570&rfr_iscdi=true