A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites

This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit inv...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE Trans. Power Appar. Syst.; (United States) 1966-11, Vol.PAS-85 (11), p.1154-1163
Hauptverfasser: Schneck, Alma MAarie, Watchorn, C. W.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 1163
container_issue 11
container_start_page 1154
container_title IEEE Trans. Power Appar. Syst.; (United States)
container_volume PAS-85
creator Schneck, Alma MAarie
Watchorn, C. W.
description This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.
doi_str_mv 10.1109/TPAS.1966.291536
format Article
fullrecord <record><control><sourceid>crossref_RIE</sourceid><recordid>TN_cdi_ieee_primary_4072967</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4072967</ieee_id><sourcerecordid>10_1109_TPAS_1966_291536</sourcerecordid><originalsourceid>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</originalsourceid><addsrcrecordid>eNo9kF1LwzAUhoMoOKf3gjfB-86TZE2ayzHnBwwcbF6HLD3dKmtT0kyYv96UiVfhhOc9Hw8h9wwmjIF-2qxm6wnTUk64ZrmQF2TEtc4zKbi4JCMAVmQ6Z3BNbvr-C0CAZGxEzIzOfdMdIwa6Cn4XbEMrH-gzpp-mbut2R-Me6cL51je1o-v6B6mvEvCNB9812MahXB2bLltHH-wO6dupDD6REftbclXZQ493f--YfL4sNvO3bPnx-j6fLTPHNcSsZBIQC2aRbae2lMhVaZXVhds6pQsLVouCFSwHBY4jiApTBKeq4iVKpcWYPJ77-j7WpndpttunnVt00ah0LGcyQXCGXPB9H7AyXagbG06GgRksmsGiGSyas8UUeThHakT8x6eguJZK_AIqXW5g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><source>IEEE Electronic Library (IEL)</source><creator>Schneck, Alma MAarie ; Watchorn, C. W.</creator><creatorcontrib>Schneck, Alma MAarie ; Watchorn, C. W.</creatorcontrib><description>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</description><identifier>ISSN: 0018-9510</identifier><identifier>EISSN: 2995-6323</identifier><identifier>DOI: 10.1109/TPAS.1966.291536</identifier><language>eng</language><publisher>United States: IEEE</publisher><subject>130300 - Hydro Energy- Plant Design &amp; Operation ; 250300 - Energy Storage- Pumped Hydro- (-1989) ; COMPUTER CODES ; COST ; Costs ; DESIGN ; ENERGY STORAGE ; Equations ; HYDRO ENERGY ; HYDROELECTRIC POWER PLANTS ; Investments ; Power engineering and energy ; Power engineering computing ; Power generation economics ; POWER PLANTS ; Power system planning ; Power systems ; Printing ; PUMPED STORAGE POWER PLANTS ; SITE SELECTION ; Systems engineering and theory</subject><ispartof>IEEE Trans. Power Appar. Syst.; (United States), 1966-11, Vol.PAS-85 (11), p.1154-1163</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</citedby><cites>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4072967$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,776,780,792,881,27901,27902,54733</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4072967$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc><backlink>$$Uhttps://www.osti.gov/biblio/7306216$$D View this record in Osti.gov$$Hfree_for_read</backlink></links><search><creatorcontrib>Schneck, Alma MAarie</creatorcontrib><creatorcontrib>Watchorn, C. W.</creatorcontrib><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><title>IEEE Trans. Power Appar. Syst.; (United States)</title><addtitle>T-PAS</addtitle><description>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</description><subject>130300 - Hydro Energy- Plant Design &amp; Operation</subject><subject>250300 - Energy Storage- Pumped Hydro- (-1989)</subject><subject>COMPUTER CODES</subject><subject>COST</subject><subject>Costs</subject><subject>DESIGN</subject><subject>ENERGY STORAGE</subject><subject>Equations</subject><subject>HYDRO ENERGY</subject><subject>HYDROELECTRIC POWER PLANTS</subject><subject>Investments</subject><subject>Power engineering and energy</subject><subject>Power engineering computing</subject><subject>Power generation economics</subject><subject>POWER PLANTS</subject><subject>Power system planning</subject><subject>Power systems</subject><subject>Printing</subject><subject>PUMPED STORAGE POWER PLANTS</subject><subject>SITE SELECTION</subject><subject>Systems engineering and theory</subject><issn>0018-9510</issn><issn>2995-6323</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1966</creationdate><recordtype>article</recordtype><recordid>eNo9kF1LwzAUhoMoOKf3gjfB-86TZE2ayzHnBwwcbF6HLD3dKmtT0kyYv96UiVfhhOc9Hw8h9wwmjIF-2qxm6wnTUk64ZrmQF2TEtc4zKbi4JCMAVmQ6Z3BNbvr-C0CAZGxEzIzOfdMdIwa6Cn4XbEMrH-gzpp-mbut2R-Me6cL51je1o-v6B6mvEvCNB9812MahXB2bLltHH-wO6dupDD6REftbclXZQ493f--YfL4sNvO3bPnx-j6fLTPHNcSsZBIQC2aRbae2lMhVaZXVhds6pQsLVouCFSwHBY4jiApTBKeq4iVKpcWYPJ77-j7WpndpttunnVt00ah0LGcyQXCGXPB9H7AyXagbG06GgRksmsGiGSyas8UUeThHakT8x6eguJZK_AIqXW5g</recordid><startdate>19661101</startdate><enddate>19661101</enddate><creator>Schneck, Alma MAarie</creator><creator>Watchorn, C. W.</creator><general>IEEE</general><scope>AAYXX</scope><scope>CITATION</scope><scope>OTOTI</scope></search><sort><creationdate>19661101</creationdate><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><author>Schneck, Alma MAarie ; Watchorn, C. W.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1966</creationdate><topic>130300 - Hydro Energy- Plant Design &amp; Operation</topic><topic>250300 - Energy Storage- Pumped Hydro- (-1989)</topic><topic>COMPUTER CODES</topic><topic>COST</topic><topic>Costs</topic><topic>DESIGN</topic><topic>ENERGY STORAGE</topic><topic>Equations</topic><topic>HYDRO ENERGY</topic><topic>HYDROELECTRIC POWER PLANTS</topic><topic>Investments</topic><topic>Power engineering and energy</topic><topic>Power engineering computing</topic><topic>Power generation economics</topic><topic>POWER PLANTS</topic><topic>Power system planning</topic><topic>Power systems</topic><topic>Printing</topic><topic>PUMPED STORAGE POWER PLANTS</topic><topic>SITE SELECTION</topic><topic>Systems engineering and theory</topic><toplevel>online_resources</toplevel><creatorcontrib>Schneck, Alma MAarie</creatorcontrib><creatorcontrib>Watchorn, C. W.</creatorcontrib><collection>CrossRef</collection><collection>OSTI.GOV</collection><jtitle>IEEE Trans. Power Appar. Syst.; (United States)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Schneck, Alma MAarie</au><au>Watchorn, C. W.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</atitle><jtitle>IEEE Trans. Power Appar. Syst.; (United States)</jtitle><stitle>T-PAS</stitle><date>1966-11-01</date><risdate>1966</risdate><volume>PAS-85</volume><issue>11</issue><spage>1154</spage><epage>1163</epage><pages>1154-1163</pages><issn>0018-9510</issn><eissn>2995-6323</eissn><abstract>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</abstract><cop>United States</cop><pub>IEEE</pub><doi>10.1109/TPAS.1966.291536</doi><tpages>10</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 0018-9510
ispartof IEEE Trans. Power Appar. Syst.; (United States), 1966-11, Vol.PAS-85 (11), p.1154-1163
issn 0018-9510
2995-6323
language eng
recordid cdi_ieee_primary_4072967
source IEEE Electronic Library (IEL)
subjects 130300 - Hydro Energy- Plant Design & Operation
250300 - Energy Storage- Pumped Hydro- (-1989)
COMPUTER CODES
COST
Costs
DESIGN
ENERGY STORAGE
Equations
HYDRO ENERGY
HYDROELECTRIC POWER PLANTS
Investments
Power engineering and energy
Power engineering computing
Power generation economics
POWER PLANTS
Power system planning
Power systems
Printing
PUMPED STORAGE POWER PLANTS
SITE SELECTION
Systems engineering and theory
title A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T19%3A53%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_RIE&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20Computer%20Program%20for%20Determining%20the%20Economic%20Size%20of%20Development%20of%20Pump-Storage%20Hydro%20Sites&rft.jtitle=IEEE%20Trans.%20Power%20Appar.%20Syst.;%20(United%20States)&rft.au=Schneck,%20Alma%20MAarie&rft.date=1966-11-01&rft.volume=PAS-85&rft.issue=11&rft.spage=1154&rft.epage=1163&rft.pages=1154-1163&rft.issn=0018-9510&rft.eissn=2995-6323&rft_id=info:doi/10.1109/TPAS.1966.291536&rft_dat=%3Ccrossref_RIE%3E10_1109_TPAS_1966_291536%3C/crossref_RIE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4072967&rfr_iscdi=true