A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites
This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit inv...
Gespeichert in:
Veröffentlicht in: | IEEE Trans. Power Appar. Syst.; (United States) 1966-11, Vol.PAS-85 (11), p.1154-1163 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 1163 |
---|---|
container_issue | 11 |
container_start_page | 1154 |
container_title | IEEE Trans. Power Appar. Syst.; (United States) |
container_volume | PAS-85 |
creator | Schneck, Alma MAarie Watchorn, C. W. |
description | This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer. |
doi_str_mv | 10.1109/TPAS.1966.291536 |
format | Article |
fullrecord | <record><control><sourceid>crossref_RIE</sourceid><recordid>TN_cdi_ieee_primary_4072967</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4072967</ieee_id><sourcerecordid>10_1109_TPAS_1966_291536</sourcerecordid><originalsourceid>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</originalsourceid><addsrcrecordid>eNo9kF1LwzAUhoMoOKf3gjfB-86TZE2ayzHnBwwcbF6HLD3dKmtT0kyYv96UiVfhhOc9Hw8h9wwmjIF-2qxm6wnTUk64ZrmQF2TEtc4zKbi4JCMAVmQ6Z3BNbvr-C0CAZGxEzIzOfdMdIwa6Cn4XbEMrH-gzpp-mbut2R-Me6cL51je1o-v6B6mvEvCNB9812MahXB2bLltHH-wO6dupDD6REftbclXZQ493f--YfL4sNvO3bPnx-j6fLTPHNcSsZBIQC2aRbae2lMhVaZXVhds6pQsLVouCFSwHBY4jiApTBKeq4iVKpcWYPJ77-j7WpndpttunnVt00ah0LGcyQXCGXPB9H7AyXagbG06GgRksmsGiGSyas8UUeThHakT8x6eguJZK_AIqXW5g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><source>IEEE Electronic Library (IEL)</source><creator>Schneck, Alma MAarie ; Watchorn, C. W.</creator><creatorcontrib>Schneck, Alma MAarie ; Watchorn, C. W.</creatorcontrib><description>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</description><identifier>ISSN: 0018-9510</identifier><identifier>EISSN: 2995-6323</identifier><identifier>DOI: 10.1109/TPAS.1966.291536</identifier><language>eng</language><publisher>United States: IEEE</publisher><subject>130300 - Hydro Energy- Plant Design & Operation ; 250300 - Energy Storage- Pumped Hydro- (-1989) ; COMPUTER CODES ; COST ; Costs ; DESIGN ; ENERGY STORAGE ; Equations ; HYDRO ENERGY ; HYDROELECTRIC POWER PLANTS ; Investments ; Power engineering and energy ; Power engineering computing ; Power generation economics ; POWER PLANTS ; Power system planning ; Power systems ; Printing ; PUMPED STORAGE POWER PLANTS ; SITE SELECTION ; Systems engineering and theory</subject><ispartof>IEEE Trans. Power Appar. Syst.; (United States), 1966-11, Vol.PAS-85 (11), p.1154-1163</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</citedby><cites>FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4072967$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,776,780,792,881,27901,27902,54733</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4072967$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc><backlink>$$Uhttps://www.osti.gov/biblio/7306216$$D View this record in Osti.gov$$Hfree_for_read</backlink></links><search><creatorcontrib>Schneck, Alma MAarie</creatorcontrib><creatorcontrib>Watchorn, C. W.</creatorcontrib><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><title>IEEE Trans. Power Appar. Syst.; (United States)</title><addtitle>T-PAS</addtitle><description>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</description><subject>130300 - Hydro Energy- Plant Design & Operation</subject><subject>250300 - Energy Storage- Pumped Hydro- (-1989)</subject><subject>COMPUTER CODES</subject><subject>COST</subject><subject>Costs</subject><subject>DESIGN</subject><subject>ENERGY STORAGE</subject><subject>Equations</subject><subject>HYDRO ENERGY</subject><subject>HYDROELECTRIC POWER PLANTS</subject><subject>Investments</subject><subject>Power engineering and energy</subject><subject>Power engineering computing</subject><subject>Power generation economics</subject><subject>POWER PLANTS</subject><subject>Power system planning</subject><subject>Power systems</subject><subject>Printing</subject><subject>PUMPED STORAGE POWER PLANTS</subject><subject>SITE SELECTION</subject><subject>Systems engineering and theory</subject><issn>0018-9510</issn><issn>2995-6323</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1966</creationdate><recordtype>article</recordtype><recordid>eNo9kF1LwzAUhoMoOKf3gjfB-86TZE2ayzHnBwwcbF6HLD3dKmtT0kyYv96UiVfhhOc9Hw8h9wwmjIF-2qxm6wnTUk64ZrmQF2TEtc4zKbi4JCMAVmQ6Z3BNbvr-C0CAZGxEzIzOfdMdIwa6Cn4XbEMrH-gzpp-mbut2R-Me6cL51je1o-v6B6mvEvCNB9812MahXB2bLltHH-wO6dupDD6REftbclXZQ493f--YfL4sNvO3bPnx-j6fLTPHNcSsZBIQC2aRbae2lMhVaZXVhds6pQsLVouCFSwHBY4jiApTBKeq4iVKpcWYPJ77-j7WpndpttunnVt00ah0LGcyQXCGXPB9H7AyXagbG06GgRksmsGiGSyas8UUeThHakT8x6eguJZK_AIqXW5g</recordid><startdate>19661101</startdate><enddate>19661101</enddate><creator>Schneck, Alma MAarie</creator><creator>Watchorn, C. W.</creator><general>IEEE</general><scope>AAYXX</scope><scope>CITATION</scope><scope>OTOTI</scope></search><sort><creationdate>19661101</creationdate><title>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</title><author>Schneck, Alma MAarie ; Watchorn, C. W.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c290t-d160ee81ae1b4ad6e27da7a98cbc798a0a9381815070c2e03fed16e47f2de6793</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1966</creationdate><topic>130300 - Hydro Energy- Plant Design & Operation</topic><topic>250300 - Energy Storage- Pumped Hydro- (-1989)</topic><topic>COMPUTER CODES</topic><topic>COST</topic><topic>Costs</topic><topic>DESIGN</topic><topic>ENERGY STORAGE</topic><topic>Equations</topic><topic>HYDRO ENERGY</topic><topic>HYDROELECTRIC POWER PLANTS</topic><topic>Investments</topic><topic>Power engineering and energy</topic><topic>Power engineering computing</topic><topic>Power generation economics</topic><topic>POWER PLANTS</topic><topic>Power system planning</topic><topic>Power systems</topic><topic>Printing</topic><topic>PUMPED STORAGE POWER PLANTS</topic><topic>SITE SELECTION</topic><topic>Systems engineering and theory</topic><toplevel>online_resources</toplevel><creatorcontrib>Schneck, Alma MAarie</creatorcontrib><creatorcontrib>Watchorn, C. W.</creatorcontrib><collection>CrossRef</collection><collection>OSTI.GOV</collection><jtitle>IEEE Trans. Power Appar. Syst.; (United States)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Schneck, Alma MAarie</au><au>Watchorn, C. W.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites</atitle><jtitle>IEEE Trans. Power Appar. Syst.; (United States)</jtitle><stitle>T-PAS</stitle><date>1966-11-01</date><risdate>1966</risdate><volume>PAS-85</volume><issue>11</issue><spage>1154</spage><epage>1163</epage><pages>1154-1163</pages><issn>0018-9510</issn><eissn>2995-6323</eissn><abstract>This is a companion paper to an earlier one.1 The computer program described is divided into three parts: a) the determination of the coefficientsfor(l), (2), and (4) of Watchon1 for the best fit to the calculated cost and plant pumping ratio data, b) the determination of the lowest average unit investment cost, and other pertinent information, to be shown later, for each of the potential sites for various conditions, and c) the arrangement of the results of part b in the order of preference. All the programs are written in Fortran for the 7074 computer.</abstract><cop>United States</cop><pub>IEEE</pub><doi>10.1109/TPAS.1966.291536</doi><tpages>10</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISSN: 0018-9510 |
ispartof | IEEE Trans. Power Appar. Syst.; (United States), 1966-11, Vol.PAS-85 (11), p.1154-1163 |
issn | 0018-9510 2995-6323 |
language | eng |
recordid | cdi_ieee_primary_4072967 |
source | IEEE Electronic Library (IEL) |
subjects | 130300 - Hydro Energy- Plant Design & Operation 250300 - Energy Storage- Pumped Hydro- (-1989) COMPUTER CODES COST Costs DESIGN ENERGY STORAGE Equations HYDRO ENERGY HYDROELECTRIC POWER PLANTS Investments Power engineering and energy Power engineering computing Power generation economics POWER PLANTS Power system planning Power systems Printing PUMPED STORAGE POWER PLANTS SITE SELECTION Systems engineering and theory |
title | A Computer Program for Determining the Economic Size of Development of Pump-Storage Hydro Sites |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T19%3A53%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_RIE&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20Computer%20Program%20for%20Determining%20the%20Economic%20Size%20of%20Development%20of%20Pump-Storage%20Hydro%20Sites&rft.jtitle=IEEE%20Trans.%20Power%20Appar.%20Syst.;%20(United%20States)&rft.au=Schneck,%20Alma%20MAarie&rft.date=1966-11-01&rft.volume=PAS-85&rft.issue=11&rft.spage=1154&rft.epage=1163&rft.pages=1154-1163&rft.issn=0018-9510&rft.eissn=2995-6323&rft_id=info:doi/10.1109/TPAS.1966.291536&rft_dat=%3Ccrossref_RIE%3E10_1109_TPAS_1966_291536%3C/crossref_RIE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=4072967&rfr_iscdi=true |