The uses of an operator training simulator for system restoration

Philadelphia Electric Company (PECo) is the host electric utility for the EPRI operator training simulator (OTS). One of the OTS functional requirements is to provide system restoration training. Some preliminary results from the use of the OTS for restoration scenarios are presented. These scenario...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Chu, R.F., Dobrowolski, E.J., Barr, E.J., McGeehan, J., Scheurer, D., Nodehi, K.
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 177
container_issue
container_start_page 171
container_title
container_volume
creator Chu, R.F.
Dobrowolski, E.J.
Barr, E.J.
McGeehan, J.
Scheurer, D.
Nodehi, K.
description Philadelphia Electric Company (PECo) is the host electric utility for the EPRI operator training simulator (OTS). One of the OTS functional requirements is to provide system restoration training. Some preliminary results from the use of the OTS for restoration scenarios are presented. These scenarios are: blackstart and resynchronization of two islands; blackstart of a hydro generating station; and blackstart of a combustion turbine for providing cranking power for another generating unit within an isolated island. The restoration procedure, the system component models, the OTS results, and potential problem areas are presented. The purpose of this study is to provide a forum to discuss the capability of existing analytical tools and future research, needs to aid system operators in system restoration.< >
doi_str_mv 10.1109/PICA.1991.160625
format Conference Proceeding
fullrecord <record><control><sourceid>ieee_6IE</sourceid><recordid>TN_cdi_ieee_primary_160625</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>160625</ieee_id><sourcerecordid>160625</sourcerecordid><originalsourceid>FETCH-LOGICAL-i104t-11048e0ea77c9ae393378b7640e81e96a799dafe72ebd19f3062a77bff07ad343</originalsourceid><addsrcrecordid>eNotj01LAzEQhgMiqLV38ZQ_sOtkk012jqX4BQU91HOZdSca6e6WJD303xusA8PAw8vwvELcKaiVAnx4f12vaoWoamXBNu2FuIHOoWlsA3gllin9QJm27Szqa7HafrM8Jk5y9pImOR84Up6jzJHCFKYvmcJ43P8hXzadUuZRRk6FUA7zdCsuPe0TL__vQnw8PW7XL9Xm7bm4bKqgwOSqyJmOgcm5TyTWqLXremcNcKcYLTnEgTy7hvtBoddFvmR778HRoI1eiPvz38DMu0MMI8XT7lxS_wL0okgk</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>conference_proceeding</recordtype></control><display><type>conference_proceeding</type><title>The uses of an operator training simulator for system restoration</title><source>IEEE Electronic Library (IEL) Conference Proceedings</source><creator>Chu, R.F. ; Dobrowolski, E.J. ; Barr, E.J. ; McGeehan, J. ; Scheurer, D. ; Nodehi, K.</creator><creatorcontrib>Chu, R.F. ; Dobrowolski, E.J. ; Barr, E.J. ; McGeehan, J. ; Scheurer, D. ; Nodehi, K.</creatorcontrib><description>Philadelphia Electric Company (PECo) is the host electric utility for the EPRI operator training simulator (OTS). One of the OTS functional requirements is to provide system restoration training. Some preliminary results from the use of the OTS for restoration scenarios are presented. These scenarios are: blackstart and resynchronization of two islands; blackstart of a hydro generating station; and blackstart of a combustion turbine for providing cranking power for another generating unit within an isolated island. The restoration procedure, the system component models, the OTS results, and potential problem areas are presented. The purpose of this study is to provide a forum to discuss the capability of existing analytical tools and future research, needs to aid system operators in system restoration.&lt; &gt;</description><identifier>ISBN: 0879426209</identifier><identifier>ISBN: 9780879426200</identifier><identifier>DOI: 10.1109/PICA.1991.160625</identifier><language>eng</language><publisher>IEEE</publisher><subject>Combustion ; Environmental economics ; Hydraulic turbines ; Nuclear power generation ; Power generation ; Power generation economics ; Power system modeling ; Power system planning ; Power system restoration ; Power system simulation</subject><ispartof>[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference, 1991, p.171-177</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/160625$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>309,310,780,784,789,790,2058,4050,4051,27925,54920</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/160625$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Chu, R.F.</creatorcontrib><creatorcontrib>Dobrowolski, E.J.</creatorcontrib><creatorcontrib>Barr, E.J.</creatorcontrib><creatorcontrib>McGeehan, J.</creatorcontrib><creatorcontrib>Scheurer, D.</creatorcontrib><creatorcontrib>Nodehi, K.</creatorcontrib><title>The uses of an operator training simulator for system restoration</title><title>[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference</title><addtitle>PICA</addtitle><description>Philadelphia Electric Company (PECo) is the host electric utility for the EPRI operator training simulator (OTS). One of the OTS functional requirements is to provide system restoration training. Some preliminary results from the use of the OTS for restoration scenarios are presented. These scenarios are: blackstart and resynchronization of two islands; blackstart of a hydro generating station; and blackstart of a combustion turbine for providing cranking power for another generating unit within an isolated island. The restoration procedure, the system component models, the OTS results, and potential problem areas are presented. The purpose of this study is to provide a forum to discuss the capability of existing analytical tools and future research, needs to aid system operators in system restoration.&lt; &gt;</description><subject>Combustion</subject><subject>Environmental economics</subject><subject>Hydraulic turbines</subject><subject>Nuclear power generation</subject><subject>Power generation</subject><subject>Power generation economics</subject><subject>Power system modeling</subject><subject>Power system planning</subject><subject>Power system restoration</subject><subject>Power system simulation</subject><isbn>0879426209</isbn><isbn>9780879426200</isbn><fulltext>true</fulltext><rsrctype>conference_proceeding</rsrctype><creationdate>1991</creationdate><recordtype>conference_proceeding</recordtype><sourceid>6IE</sourceid><sourceid>RIE</sourceid><recordid>eNotj01LAzEQhgMiqLV38ZQ_sOtkk012jqX4BQU91HOZdSca6e6WJD303xusA8PAw8vwvELcKaiVAnx4f12vaoWoamXBNu2FuIHOoWlsA3gllin9QJm27Szqa7HafrM8Jk5y9pImOR84Up6jzJHCFKYvmcJ43P8hXzadUuZRRk6FUA7zdCsuPe0TL__vQnw8PW7XL9Xm7bm4bKqgwOSqyJmOgcm5TyTWqLXremcNcKcYLTnEgTy7hvtBoddFvmR778HRoI1eiPvz38DMu0MMI8XT7lxS_wL0okgk</recordid><startdate>1991</startdate><enddate>1991</enddate><creator>Chu, R.F.</creator><creator>Dobrowolski, E.J.</creator><creator>Barr, E.J.</creator><creator>McGeehan, J.</creator><creator>Scheurer, D.</creator><creator>Nodehi, K.</creator><general>IEEE</general><scope>6IE</scope><scope>6IL</scope><scope>CBEJK</scope><scope>RIE</scope><scope>RIL</scope></search><sort><creationdate>1991</creationdate><title>The uses of an operator training simulator for system restoration</title><author>Chu, R.F. ; Dobrowolski, E.J. ; Barr, E.J. ; McGeehan, J. ; Scheurer, D. ; Nodehi, K.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-i104t-11048e0ea77c9ae393378b7640e81e96a799dafe72ebd19f3062a77bff07ad343</frbrgroupid><rsrctype>conference_proceedings</rsrctype><prefilter>conference_proceedings</prefilter><language>eng</language><creationdate>1991</creationdate><topic>Combustion</topic><topic>Environmental economics</topic><topic>Hydraulic turbines</topic><topic>Nuclear power generation</topic><topic>Power generation</topic><topic>Power generation economics</topic><topic>Power system modeling</topic><topic>Power system planning</topic><topic>Power system restoration</topic><topic>Power system simulation</topic><toplevel>online_resources</toplevel><creatorcontrib>Chu, R.F.</creatorcontrib><creatorcontrib>Dobrowolski, E.J.</creatorcontrib><creatorcontrib>Barr, E.J.</creatorcontrib><creatorcontrib>McGeehan, J.</creatorcontrib><creatorcontrib>Scheurer, D.</creatorcontrib><creatorcontrib>Nodehi, K.</creatorcontrib><collection>IEEE Electronic Library (IEL) Conference Proceedings</collection><collection>IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume</collection><collection>IEEE Xplore All Conference Proceedings</collection><collection>IEEE Electronic Library (IEL)</collection><collection>IEEE Proceedings Order Plans (POP All) 1998-Present</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Chu, R.F.</au><au>Dobrowolski, E.J.</au><au>Barr, E.J.</au><au>McGeehan, J.</au><au>Scheurer, D.</au><au>Nodehi, K.</au><format>book</format><genre>proceeding</genre><ristype>CONF</ristype><atitle>The uses of an operator training simulator for system restoration</atitle><btitle>[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference</btitle><stitle>PICA</stitle><date>1991</date><risdate>1991</risdate><spage>171</spage><epage>177</epage><pages>171-177</pages><isbn>0879426209</isbn><isbn>9780879426200</isbn><abstract>Philadelphia Electric Company (PECo) is the host electric utility for the EPRI operator training simulator (OTS). One of the OTS functional requirements is to provide system restoration training. Some preliminary results from the use of the OTS for restoration scenarios are presented. These scenarios are: blackstart and resynchronization of two islands; blackstart of a hydro generating station; and blackstart of a combustion turbine for providing cranking power for another generating unit within an isolated island. The restoration procedure, the system component models, the OTS results, and potential problem areas are presented. The purpose of this study is to provide a forum to discuss the capability of existing analytical tools and future research, needs to aid system operators in system restoration.&lt; &gt;</abstract><pub>IEEE</pub><doi>10.1109/PICA.1991.160625</doi><tpages>7</tpages></addata></record>
fulltext fulltext_linktorsrc
identifier ISBN: 0879426209
ispartof [Proceedings] Conference Papers 1991 Power Industry Computer Application Conference, 1991, p.171-177
issn
language eng
recordid cdi_ieee_primary_160625
source IEEE Electronic Library (IEL) Conference Proceedings
subjects Combustion
Environmental economics
Hydraulic turbines
Nuclear power generation
Power generation
Power generation economics
Power system modeling
Power system planning
Power system restoration
Power system simulation
title The uses of an operator training simulator for system restoration
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T20%3A08%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-ieee_6IE&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=proceeding&rft.atitle=The%20uses%20of%20an%20operator%20training%20simulator%20for%20system%20restoration&rft.btitle=%5BProceedings%5D%20Conference%20Papers%201991%20Power%20Industry%20Computer%20Application%20Conference&rft.au=Chu,%20R.F.&rft.date=1991&rft.spage=171&rft.epage=177&rft.pages=171-177&rft.isbn=0879426209&rft.isbn_list=9780879426200&rft_id=info:doi/10.1109/PICA.1991.160625&rft_dat=%3Cieee_6IE%3E160625%3C/ieee_6IE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=160625&rfr_iscdi=true