Scheduling of Post-Flood Recovery Project with Flexible Project Structure

Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of Engineering, Project, and Production Management Project, and Production Management, 2021-05, Vol.11 (2), p.118-126
Hauptverfasser: Babatunde Omoniyi Odedairo, Odion Ehidebama Olenloa
Format: Artikel
Sprache:chi
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 126
container_issue 2
container_start_page 118
container_title Journal of Engineering, Project, and Production Management
container_volume 11
creator Babatunde Omoniyi Odedairo
Odion Ehidebama Olenloa
description Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation
format Article
fullrecord <record><control><sourceid>hyweb</sourceid><recordid>TN_cdi_hyweb_hyread_00576964</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>00576964</sourcerecordid><originalsourceid>FETCH-hyweb_hyread_005769643</originalsourceid><addsrcrecordid>eNqFybsKwjAYQOEMChbtGzjkBQppTFo6i0W3Yt1Lk_w1kWAgF2vf3kVcnQ58Z4UySmlZVJw2G5SHYARhrGaMljxDl15qUMma5x27CXcuxKK1zil8Bele4BfcefcAGfFsosathbcRFn7aR59kTB52aD2NNkD-7Rbt29PteC70MoMY9OJhVAMhvK6aih3-7A9HKTcv</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><source>Alma/SFX Local Collection</source><creator>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</creator><creatorcontrib>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</creatorcontrib><description>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</description><identifier>ISSN: 2221-6529</identifier><language>chi</language><publisher>其他: De Gruyter</publisher><subject>disruption ; flexible project structure ; Flood ; project activities</subject><ispartof>Journal of Engineering, Project, and Production Management, 2021-05, Vol.11 (2), p.118-126</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780</link.rule.ids></links><search><creatorcontrib>Babatunde Omoniyi Odedairo</creatorcontrib><creatorcontrib>Odion Ehidebama Olenloa</creatorcontrib><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><title>Journal of Engineering, Project, and Production Management</title><description>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</description><subject>disruption</subject><subject>flexible project structure</subject><subject>Flood</subject><subject>project activities</subject><issn>2221-6529</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNqFybsKwjAYQOEMChbtGzjkBQppTFo6i0W3Yt1Lk_w1kWAgF2vf3kVcnQ58Z4UySmlZVJw2G5SHYARhrGaMljxDl15qUMma5x27CXcuxKK1zil8Bele4BfcefcAGfFsosathbcRFn7aR59kTB52aD2NNkD-7Rbt29PteC70MoMY9OJhVAMhvK6aih3-7A9HKTcv</recordid><startdate>202105</startdate><enddate>202105</enddate><creator>Babatunde Omoniyi Odedairo</creator><creator>Odion Ehidebama Olenloa</creator><general>De Gruyter</general><scope>9RA</scope></search><sort><creationdate>202105</creationdate><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><author>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-hyweb_hyread_005769643</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>chi</language><creationdate>2021</creationdate><topic>disruption</topic><topic>flexible project structure</topic><topic>Flood</topic><topic>project activities</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Babatunde Omoniyi Odedairo</creatorcontrib><creatorcontrib>Odion Ehidebama Olenloa</creatorcontrib><collection>HyRead台灣全文資料庫</collection><jtitle>Journal of Engineering, Project, and Production Management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Babatunde Omoniyi Odedairo</au><au>Odion Ehidebama Olenloa</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</atitle><jtitle>Journal of Engineering, Project, and Production Management</jtitle><date>2021-05</date><risdate>2021</risdate><volume>11</volume><issue>2</issue><spage>118</spage><epage>126</epage><pages>118-126</pages><issn>2221-6529</issn><abstract>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</abstract><cop>其他</cop><pub>De Gruyter</pub></addata></record>
fulltext fulltext
identifier ISSN: 2221-6529
ispartof Journal of Engineering, Project, and Production Management, 2021-05, Vol.11 (2), p.118-126
issn 2221-6529
language chi
recordid cdi_hyweb_hyread_00576964
source Alma/SFX Local Collection
subjects disruption
flexible project structure
Flood
project activities
title Scheduling of Post-Flood Recovery Project with Flexible Project Structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T16%3A37%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-hyweb&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Scheduling%20of%20Post-Flood%20Recovery%20Project%20with%20Flexible%20Project%20Structure&rft.jtitle=Journal%20of%20Engineering,%20Project,%20and%20Production%20Management&rft.au=Babatunde%20Omoniyi%20Odedairo&rft.date=2021-05&rft.volume=11&rft.issue=2&rft.spage=118&rft.epage=126&rft.pages=118-126&rft.issn=2221-6529&rft_id=info:doi/&rft_dat=%3Chyweb%3E00576964%3C/hyweb%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true