Scheduling of Post-Flood Recovery Project with Flexible Project Structure
Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is o...
Gespeichert in:
Veröffentlicht in: | Journal of Engineering, Project, and Production Management Project, and Production Management, 2021-05, Vol.11 (2), p.118-126 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | chi |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 126 |
---|---|
container_issue | 2 |
container_start_page | 118 |
container_title | Journal of Engineering, Project, and Production Management |
container_volume | 11 |
creator | Babatunde Omoniyi Odedairo Odion Ehidebama Olenloa |
description | Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation |
format | Article |
fullrecord | <record><control><sourceid>hyweb</sourceid><recordid>TN_cdi_hyweb_hyread_00576964</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>00576964</sourcerecordid><originalsourceid>FETCH-hyweb_hyread_005769643</originalsourceid><addsrcrecordid>eNqFybsKwjAYQOEMChbtGzjkBQppTFo6i0W3Yt1Lk_w1kWAgF2vf3kVcnQ58Z4UySmlZVJw2G5SHYARhrGaMljxDl15qUMma5x27CXcuxKK1zil8Bele4BfcefcAGfFsosathbcRFn7aR59kTB52aD2NNkD-7Rbt29PteC70MoMY9OJhVAMhvK6aih3-7A9HKTcv</addsrcrecordid><sourcetype>Publisher</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><source>Alma/SFX Local Collection</source><creator>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</creator><creatorcontrib>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</creatorcontrib><description>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</description><identifier>ISSN: 2221-6529</identifier><language>chi</language><publisher>其他: De Gruyter</publisher><subject>disruption ; flexible project structure ; Flood ; project activities</subject><ispartof>Journal of Engineering, Project, and Production Management, 2021-05, Vol.11 (2), p.118-126</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780</link.rule.ids></links><search><creatorcontrib>Babatunde Omoniyi Odedairo</creatorcontrib><creatorcontrib>Odion Ehidebama Olenloa</creatorcontrib><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><title>Journal of Engineering, Project, and Production Management</title><description>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</description><subject>disruption</subject><subject>flexible project structure</subject><subject>Flood</subject><subject>project activities</subject><issn>2221-6529</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNqFybsKwjAYQOEMChbtGzjkBQppTFo6i0W3Yt1Lk_w1kWAgF2vf3kVcnQ58Z4UySmlZVJw2G5SHYARhrGaMljxDl15qUMma5x27CXcuxKK1zil8Bele4BfcefcAGfFsosathbcRFn7aR59kTB52aD2NNkD-7Rbt29PteC70MoMY9OJhVAMhvK6aih3-7A9HKTcv</recordid><startdate>202105</startdate><enddate>202105</enddate><creator>Babatunde Omoniyi Odedairo</creator><creator>Odion Ehidebama Olenloa</creator><general>De Gruyter</general><scope>9RA</scope></search><sort><creationdate>202105</creationdate><title>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</title><author>Babatunde Omoniyi Odedairo ; Odion Ehidebama Olenloa</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-hyweb_hyread_005769643</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>chi</language><creationdate>2021</creationdate><topic>disruption</topic><topic>flexible project structure</topic><topic>Flood</topic><topic>project activities</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Babatunde Omoniyi Odedairo</creatorcontrib><creatorcontrib>Odion Ehidebama Olenloa</creatorcontrib><collection>HyRead台灣全文資料庫</collection><jtitle>Journal of Engineering, Project, and Production Management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Babatunde Omoniyi Odedairo</au><au>Odion Ehidebama Olenloa</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Scheduling of Post-Flood Recovery Project with Flexible Project Structure</atitle><jtitle>Journal of Engineering, Project, and Production Management</jtitle><date>2021-05</date><risdate>2021</risdate><volume>11</volume><issue>2</issue><spage>118</spage><epage>126</epage><pages>118-126</pages><issn>2221-6529</issn><abstract>Flood events around the world result in the loss of human lives, disruption, damage to economic, infrastructural and ecological systems. Although, different frameworks to manage flood events exist; however, the complexity (i.e. adjustment and adaptation) associated with some of these approaches is often limited by constraints of time and resources. Therefore, this study attempts to apply a flexible project structure to schedule a post-flood recovery project (PFRP). Twenty-five (25) restorative activities in a PFRP were identified, categorised and scheduled as resource-constrained project scheduling problem with a flexible structure (RCPSP-FS). Monte Carlo simulation was used to reflect the uncertain characteristics of each restorative activity. PFRP completion time was 42 and 86 days under time and resource constraints assumptions, respectively. Thirty- four (34) network paths (sub-projects) were identified and grouped into 4 restorative measures as follows: (i) removal of hazardous materials (ii) evacuation</abstract><cop>其他</cop><pub>De Gruyter</pub></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2221-6529 |
ispartof | Journal of Engineering, Project, and Production Management, 2021-05, Vol.11 (2), p.118-126 |
issn | 2221-6529 |
language | chi |
recordid | cdi_hyweb_hyread_00576964 |
source | Alma/SFX Local Collection |
subjects | disruption flexible project structure Flood project activities |
title | Scheduling of Post-Flood Recovery Project with Flexible Project Structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T16%3A37%3A10IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-hyweb&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Scheduling%20of%20Post-Flood%20Recovery%20Project%20with%20Flexible%20Project%20Structure&rft.jtitle=Journal%20of%20Engineering,%20Project,%20and%20Production%20Management&rft.au=Babatunde%20Omoniyi%20Odedairo&rft.date=2021-05&rft.volume=11&rft.issue=2&rft.spage=118&rft.epage=126&rft.pages=118-126&rft.issn=2221-6529&rft_id=info:doi/&rft_dat=%3Chyweb%3E00576964%3C/hyweb%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |