Bi-objective dynamic programming for trading off hydropower and irrigation

Reservoir management is examined from the bicriterion viewpoints of hydropower generation and irrigation. Specifically, a decision support system is developed which includes constructing the set of non-inferior solutions, using the constraint, penalty and weighting methods. The reservoir operation m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied mathematics and computation 1997 (88), p.53-76
Hauptverfasser: Michalland, B., Parent, Eric, Duckstein, L.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 76
container_issue 88
container_start_page 53
container_title Applied mathematics and computation
container_volume
creator Michalland, B.
Parent, Eric
Duckstein, L.
description Reservoir management is examined from the bicriterion viewpoints of hydropower generation and irrigation. Specifically, a decision support system is developed which includes constructing the set of non-inferior solutions, using the constraint, penalty and weighting methods. The reservoir operation model, as well as the optimization and simulation software, were initially provided by the R & D Division of the French Electrical Utility (Electricité de France) ; the method is based on a Stochastic Dynamic Programming - SDP - model with daily time steps, using 50 annual values of daily historical inflows and marginal electricty production costs. The water requirement for irrigaton is taken either as preset using a demand curve, or as a soil reservoir model based on SDP running simultaneously with the resevoir model. The model yields trade-off curves of electrical production losses versus, respectively, irrigated surface area, crop yield, and agriculture benefits. A numerical application illustrates the methodology in the French case of the Bort reservoir, in the Dordogne valley. The model reveals releasing water for irrigation could present economic advantages within certain constraints on maximum irrigated surface area and minimum water price. Consequently, the current economic justification of single purpose reservoir management for hydropower ought to be changed. Negotiation should be initiated for the purpose of selecting one of the non-dominated reservoir management policies, hereby minimizing the distance of the " most preferred " solution point from the ideal one or by using the Nash cooperative game solution. Multicriterion decision-making seems to be a promising operational management tool for hydrosystems. La gestion d'un barrage est étudiée avec pour double objectif la production électrique et l'irrigation. Afin de déterminer l'ensemble des solutions non-inférieures, un modèle est développé utilisant successivement la méthode des contraintes, la méthode des pénalités et la méthode des pondérations de critères. Le modèle initial de gestion de barrage, ainsi que le programme d'optimisation et de simulation, proviennent du centre de recherche d'EDF. Ce modèle utilise la programmation dynamique stochastique au pas de temps journalier, la valeur des débits d'entrée journaliers observés au cours des 50 dernières années et le coût marginal de la production électrique donné par le service économique d'EDF. La demande en eau d'irrigation est estimée soit à p
format Article
fullrecord <record><control><sourceid>hal</sourceid><recordid>TN_cdi_hal_primary_oai_HAL_hal_02577189v1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>oai_HAL_hal_02577189v1</sourcerecordid><originalsourceid>FETCH-hal_primary_oai_HAL_hal_02577189v13</originalsourceid><addsrcrecordid>eNqVissKgkAUQGdRkD3-YbYthGuW5rKiiGjZfrg5M3pFZ-Qqhn8fQj_Q6hwOZyYCgCwJY4B4IZZdVwFAmkT7QDzOFPp3ZfKeBiP16LChXLbsC8amIVdI61n2jHpyb60sR82-9R_DEp2WxEwF9uTdWswt1p3Z_LgS29v1dbmHJdaqZWqQR-WR1P30VFOD3SFNo2M2RPE_7xePuUCq</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Bi-objective dynamic programming for trading off hydropower and irrigation</title><source>Elsevier ScienceDirect Journals</source><creator>Michalland, B. ; Parent, Eric ; Duckstein, L.</creator><creatorcontrib>Michalland, B. ; Parent, Eric ; Duckstein, L.</creatorcontrib><description>Reservoir management is examined from the bicriterion viewpoints of hydropower generation and irrigation. Specifically, a decision support system is developed which includes constructing the set of non-inferior solutions, using the constraint, penalty and weighting methods. The reservoir operation model, as well as the optimization and simulation software, were initially provided by the R &amp; D Division of the French Electrical Utility (Electricité de France) ; the method is based on a Stochastic Dynamic Programming - SDP - model with daily time steps, using 50 annual values of daily historical inflows and marginal electricty production costs. The water requirement for irrigaton is taken either as preset using a demand curve, or as a soil reservoir model based on SDP running simultaneously with the resevoir model. The model yields trade-off curves of electrical production losses versus, respectively, irrigated surface area, crop yield, and agriculture benefits. A numerical application illustrates the methodology in the French case of the Bort reservoir, in the Dordogne valley. The model reveals releasing water for irrigation could present economic advantages within certain constraints on maximum irrigated surface area and minimum water price. Consequently, the current economic justification of single purpose reservoir management for hydropower ought to be changed. Negotiation should be initiated for the purpose of selecting one of the non-dominated reservoir management policies, hereby minimizing the distance of the " most preferred " solution point from the ideal one or by using the Nash cooperative game solution. Multicriterion decision-making seems to be a promising operational management tool for hydrosystems. La gestion d'un barrage est étudiée avec pour double objectif la production électrique et l'irrigation. Afin de déterminer l'ensemble des solutions non-inférieures, un modèle est développé utilisant successivement la méthode des contraintes, la méthode des pénalités et la méthode des pondérations de critères. Le modèle initial de gestion de barrage, ainsi que le programme d'optimisation et de simulation, proviennent du centre de recherche d'EDF. Ce modèle utilise la programmation dynamique stochastique au pas de temps journalier, la valeur des débits d'entrée journaliers observés au cours des 50 dernières années et le coût marginal de la production électrique donné par le service économique d'EDF. La demande en eau d'irrigation est estimée soit à partir d'une fonction de demande exogène, soit à partir d'un modèle de réservoir hydrique du sol combiné au modèle de gestion du barrage. Le modèle développé fournit des courbes d'indifférence entre la perte de production électrique et respectivement la surface irriguée, le rendement agricole ou le bénéfice agricole. Une application numérique illustre la méthode dans le cas précis du barrage de Bord (Vallée de la Dordogne, France). Le modèle montre que lâcher de l'eau pour l'irrigation peut être économiquement avantageux dans une certaine limite de surface irriguée et de coût de production électrique. Ceci nous amène à penser que la gestion des barrages hydroélectriques dans le seul but de la production électrique n'est pas économiquement justifiée. Des négociations devraient avoir lieux pour choisir un type de gestion multi-objectifs parmi les solutions non dominées. Plusieurs critères de choix peuvent être envisagés : minimisation de la distance entre la solution idéale et les solutions non dominées, équilibre de Nash dans le cas d'un jeu coopératif.</description><identifier>ISSN: 0096-3003</identifier><language>eng</language><publisher>Elsevier</publisher><subject>Environmental Sciences</subject><ispartof>Applied mathematics and computation, 1997 (88), p.53-76</ispartof><rights>Distributed under a Creative Commons Attribution 4.0 International License</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><orcidid>0000-0001-7868-2994 ; 0000-0001-7868-2994</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,314,776,780,881,4010</link.rule.ids><backlink>$$Uhttps://hal.inrae.fr/hal-02577189$$DView record in HAL$$Hfree_for_read</backlink></links><search><creatorcontrib>Michalland, B.</creatorcontrib><creatorcontrib>Parent, Eric</creatorcontrib><creatorcontrib>Duckstein, L.</creatorcontrib><title>Bi-objective dynamic programming for trading off hydropower and irrigation</title><title>Applied mathematics and computation</title><description>Reservoir management is examined from the bicriterion viewpoints of hydropower generation and irrigation. Specifically, a decision support system is developed which includes constructing the set of non-inferior solutions, using the constraint, penalty and weighting methods. The reservoir operation model, as well as the optimization and simulation software, were initially provided by the R &amp; D Division of the French Electrical Utility (Electricité de France) ; the method is based on a Stochastic Dynamic Programming - SDP - model with daily time steps, using 50 annual values of daily historical inflows and marginal electricty production costs. The water requirement for irrigaton is taken either as preset using a demand curve, or as a soil reservoir model based on SDP running simultaneously with the resevoir model. The model yields trade-off curves of electrical production losses versus, respectively, irrigated surface area, crop yield, and agriculture benefits. A numerical application illustrates the methodology in the French case of the Bort reservoir, in the Dordogne valley. The model reveals releasing water for irrigation could present economic advantages within certain constraints on maximum irrigated surface area and minimum water price. Consequently, the current economic justification of single purpose reservoir management for hydropower ought to be changed. Negotiation should be initiated for the purpose of selecting one of the non-dominated reservoir management policies, hereby minimizing the distance of the " most preferred " solution point from the ideal one or by using the Nash cooperative game solution. Multicriterion decision-making seems to be a promising operational management tool for hydrosystems. La gestion d'un barrage est étudiée avec pour double objectif la production électrique et l'irrigation. Afin de déterminer l'ensemble des solutions non-inférieures, un modèle est développé utilisant successivement la méthode des contraintes, la méthode des pénalités et la méthode des pondérations de critères. Le modèle initial de gestion de barrage, ainsi que le programme d'optimisation et de simulation, proviennent du centre de recherche d'EDF. Ce modèle utilise la programmation dynamique stochastique au pas de temps journalier, la valeur des débits d'entrée journaliers observés au cours des 50 dernières années et le coût marginal de la production électrique donné par le service économique d'EDF. La demande en eau d'irrigation est estimée soit à partir d'une fonction de demande exogène, soit à partir d'un modèle de réservoir hydrique du sol combiné au modèle de gestion du barrage. Le modèle développé fournit des courbes d'indifférence entre la perte de production électrique et respectivement la surface irriguée, le rendement agricole ou le bénéfice agricole. Une application numérique illustre la méthode dans le cas précis du barrage de Bord (Vallée de la Dordogne, France). Le modèle montre que lâcher de l'eau pour l'irrigation peut être économiquement avantageux dans une certaine limite de surface irriguée et de coût de production électrique. Ceci nous amène à penser que la gestion des barrages hydroélectriques dans le seul but de la production électrique n'est pas économiquement justifiée. Des négociations devraient avoir lieux pour choisir un type de gestion multi-objectifs parmi les solutions non dominées. Plusieurs critères de choix peuvent être envisagés : minimisation de la distance entre la solution idéale et les solutions non dominées, équilibre de Nash dans le cas d'un jeu coopératif.</description><subject>Environmental Sciences</subject><issn>0096-3003</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1997</creationdate><recordtype>article</recordtype><recordid>eNqVissKgkAUQGdRkD3-YbYthGuW5rKiiGjZfrg5M3pFZ-Qqhn8fQj_Q6hwOZyYCgCwJY4B4IZZdVwFAmkT7QDzOFPp3ZfKeBiP16LChXLbsC8amIVdI61n2jHpyb60sR82-9R_DEp2WxEwF9uTdWswt1p3Z_LgS29v1dbmHJdaqZWqQR-WR1P30VFOD3SFNo2M2RPE_7xePuUCq</recordid><startdate>1997</startdate><enddate>1997</enddate><creator>Michalland, B.</creator><creator>Parent, Eric</creator><creator>Duckstein, L.</creator><general>Elsevier</general><scope>1XC</scope><orcidid>https://orcid.org/0000-0001-7868-2994</orcidid><orcidid>https://orcid.org/0000-0001-7868-2994</orcidid></search><sort><creationdate>1997</creationdate><title>Bi-objective dynamic programming for trading off hydropower and irrigation</title><author>Michalland, B. ; Parent, Eric ; Duckstein, L.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-hal_primary_oai_HAL_hal_02577189v13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1997</creationdate><topic>Environmental Sciences</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Michalland, B.</creatorcontrib><creatorcontrib>Parent, Eric</creatorcontrib><creatorcontrib>Duckstein, L.</creatorcontrib><collection>Hyper Article en Ligne (HAL)</collection><jtitle>Applied mathematics and computation</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Michalland, B.</au><au>Parent, Eric</au><au>Duckstein, L.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Bi-objective dynamic programming for trading off hydropower and irrigation</atitle><jtitle>Applied mathematics and computation</jtitle><date>1997</date><risdate>1997</risdate><issue>88</issue><spage>53</spage><epage>76</epage><pages>53-76</pages><issn>0096-3003</issn><abstract>Reservoir management is examined from the bicriterion viewpoints of hydropower generation and irrigation. Specifically, a decision support system is developed which includes constructing the set of non-inferior solutions, using the constraint, penalty and weighting methods. The reservoir operation model, as well as the optimization and simulation software, were initially provided by the R &amp; D Division of the French Electrical Utility (Electricité de France) ; the method is based on a Stochastic Dynamic Programming - SDP - model with daily time steps, using 50 annual values of daily historical inflows and marginal electricty production costs. The water requirement for irrigaton is taken either as preset using a demand curve, or as a soil reservoir model based on SDP running simultaneously with the resevoir model. The model yields trade-off curves of electrical production losses versus, respectively, irrigated surface area, crop yield, and agriculture benefits. A numerical application illustrates the methodology in the French case of the Bort reservoir, in the Dordogne valley. The model reveals releasing water for irrigation could present economic advantages within certain constraints on maximum irrigated surface area and minimum water price. Consequently, the current economic justification of single purpose reservoir management for hydropower ought to be changed. Negotiation should be initiated for the purpose of selecting one of the non-dominated reservoir management policies, hereby minimizing the distance of the " most preferred " solution point from the ideal one or by using the Nash cooperative game solution. Multicriterion decision-making seems to be a promising operational management tool for hydrosystems. La gestion d'un barrage est étudiée avec pour double objectif la production électrique et l'irrigation. Afin de déterminer l'ensemble des solutions non-inférieures, un modèle est développé utilisant successivement la méthode des contraintes, la méthode des pénalités et la méthode des pondérations de critères. Le modèle initial de gestion de barrage, ainsi que le programme d'optimisation et de simulation, proviennent du centre de recherche d'EDF. Ce modèle utilise la programmation dynamique stochastique au pas de temps journalier, la valeur des débits d'entrée journaliers observés au cours des 50 dernières années et le coût marginal de la production électrique donné par le service économique d'EDF. La demande en eau d'irrigation est estimée soit à partir d'une fonction de demande exogène, soit à partir d'un modèle de réservoir hydrique du sol combiné au modèle de gestion du barrage. Le modèle développé fournit des courbes d'indifférence entre la perte de production électrique et respectivement la surface irriguée, le rendement agricole ou le bénéfice agricole. Une application numérique illustre la méthode dans le cas précis du barrage de Bord (Vallée de la Dordogne, France). Le modèle montre que lâcher de l'eau pour l'irrigation peut être économiquement avantageux dans une certaine limite de surface irriguée et de coût de production électrique. Ceci nous amène à penser que la gestion des barrages hydroélectriques dans le seul but de la production électrique n'est pas économiquement justifiée. Des négociations devraient avoir lieux pour choisir un type de gestion multi-objectifs parmi les solutions non dominées. Plusieurs critères de choix peuvent être envisagés : minimisation de la distance entre la solution idéale et les solutions non dominées, équilibre de Nash dans le cas d'un jeu coopératif.</abstract><pub>Elsevier</pub><orcidid>https://orcid.org/0000-0001-7868-2994</orcidid><orcidid>https://orcid.org/0000-0001-7868-2994</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0096-3003
ispartof Applied mathematics and computation, 1997 (88), p.53-76
issn 0096-3003
language eng
recordid cdi_hal_primary_oai_HAL_hal_02577189v1
source Elsevier ScienceDirect Journals
subjects Environmental Sciences
title Bi-objective dynamic programming for trading off hydropower and irrigation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T01%3A52%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-hal&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Bi-objective%20dynamic%20programming%20for%20trading%20off%20hydropower%20and%20irrigation&rft.jtitle=Applied%20mathematics%20and%20computation&rft.au=Michalland,%20B.&rft.date=1997&rft.issue=88&rft.spage=53&rft.epage=76&rft.pages=53-76&rft.issn=0096-3003&rft_id=info:doi/&rft_dat=%3Chal%3Eoai_HAL_hal_02577189v1%3C/hal%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true