Planned Lead Time Optimization in MRP Environment for Multilevel Production Systems

This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging costs. The proposed approach is based on discrete time inventory control where the deci...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of systems science and systems engineering 2008, Vol.17 (2), p.132-155
Hauptverfasser: Ould Louly, Mohamed-Aly, Hnaien, Faicel, Dolgui, Alexandre
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!