Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
A problem of inventory control for assembly systems is considered where the component lead times are random. A periodic “lot-for-lot” policy for component supply is studied. The decision variables are component planned lead times. The aim is to minimize the average holding cost for components while...
Gespeichert in:
Veröffentlicht in: | International journal of production economics 2008-09, Vol.115 (1), p.236-247 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!