Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint

A problem of inventory control for assembly systems is considered where the component lead times are random. A periodic “lot-for-lot” policy for component supply is studied. The decision variables are component planned lead times. The aim is to minimize the average holding cost for components while...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics 2008-09, Vol.115 (1), p.236-247
Hauptverfasser: Louly, Mohamed-Aly, Dolgui, Alexandre, Hnaien, Faicel
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!