Toward a Robust Nuclear Management System
Considering the economic growth rate anticipated in India, this projection appears realistic, suggesting that a nuclear capacity of 250 GWe will be necessary to compensate (albeit slightly) for the increase in the quantity of carbon dioxide released from coal-fired electricity production in India. [...
Gespeichert in:
Veröffentlicht in: | Daedalus (Cambridge, Mass.) Mass.), 2010, Vol.139 (1), p.82-92 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Considering the economic growth rate anticipated in India, this projection appears realistic, suggesting that a nuclear capacity of 250 GWe will be necessary to compensate (albeit slightly) for the increase in the quantity of carbon dioxide released from coal-fired electricity production in India. [...] the nuclear power needed in China and India in 2050 should be projected to be at least 500 GWe, rather than 400 GWe as estimated in the 2003 MlT study.\n While a safety system based on procedural rationality should be designed to meet the specific needs of each country, the knowledge developed thus far in developed nations should be transferred to developing countries, especially through international programs. |
---|---|
ISSN: | 0011-5266 1548-6192 |
DOI: | 10.1162/daed.2010.139.1.82 |