Maybole to Girvan High Pressure Natural Gas Pipeline, South Ayrshire. Archaeological Watching Brief
A programme of archaeological works was conducted during the construction of the Maybole to Girvan High Pressure Natural Gas Pipeline. This work involved a watching brief, a controlled topsoil strip and a topographic survey and evaluation. The features recorded included a range of field boundary and...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Web Resource |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!