A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source
84 - technicians coordinate, then push the test button 9 - constructed of carbon steel, with a thickness of 125, 4 mm the cylinder is forged using Terni's imposing machinery. 46 - Ansaldo San Giorgio the carcass of the\ "hostator\" is ready 41 - water pipes built by the Franco Tosi an...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Video |
Sprache: | ita |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Luisi, Daniele G |
description | 84 - technicians coordinate, then push the test button
9 - constructed of carbon steel, with a thickness of 125, 4 mm the cylinder is forged using Terni's imposing machinery.
46 - Ansaldo San Giorgio the carcass of the\ "hostator\" is ready
41 - water pipes built by the Franco Tosi and the BM steel mills and thunderstorms
49 - the train with the precious cargo leaves a tunnel
77 - fuel loading operations in the reactor begin in the sphere
80 - nuclear control is arranged in the premises below
18 - pressure closures for access to the sphere built by an American industry arrive at the port of Naples, and they download
17 - cover sheets are welded and then mounted under the control of a Chicago company
87 - lights that light up one after the other in all areas of working life and not
33 - the shadow of the helicopter that from where the shooting is done
50 - the cylindrical body is raised at 40 meters altitude inside the shell
22 - 18 columns support the sheets that will contain the sphere
6 - workers begin to work on the construction of the shell, machines pierce the ground with large cylinders driven by machines.
27 - health physics laboratory deals with radiometric measurements, equipment for measuring radioactivity
59 - the power station is connected with Rome and Naples via the high voltage wires
61 - Capodichino airport: landing the plane from San Josè in California with two of the 208 elements of combustible
39 - concrete analysis laboratory of which the construction site is equipped with the technicians who carry out the various tests
69 - through a door destined only for the employees you enter the sphere
1 - desks with folders with the names of scientists Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell in the offices of international general electric in Dresden in the USA
79 - 208 combustion elements are inserted into the reactor, closing
64 - fine-tuning of nuclear reaction control bars
8 - at the steel mills of Terni the pressure vessel of the reactor is forged where it takes place and the nuclear reaction is controlled.
30 - the completion of the ball, the latest welds
83 - this is the first work in Europe of nuclear electricity generated through a boiling water reactor.
29 - the surrounding area with the population centers, one is Sessa AURUNCA
73 - the switchroom, control center of the power station where nuclear technicians operate
37 - the foundations of the power plant buildin |
format | Video |
fullrecord | <record><control><sourceid>europeana_1GC</sourceid><recordid>TN_cdi_europeana_collections_08602_IL3000088681</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>08602_IL3000088681</sourcerecordid><originalsourceid>FETCH-europeana_collections_08602_IL30000886813</originalsourceid><addsrcrecordid>eNqVjb0KAjEQhNNYiPoO-wKe0YMj7XH4B5aWB2GJ63GwbGSTIL69CjaCjdMMfDDfTM3QgtAdSEiHB6RYNFAFHUlWZCCmkDVKCUyocCGGPeo48IgSqx6khwz4y9DKN5mbyRU50eLTM7Pabc_dYUlF441Q0IfI77sxSvLWNXbjj6favuJc49b1_4snohNIBQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>video</recordtype></control><display><type>video</type><title>A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source</title><source>Europeana Collections</source><creator>Luisi, Daniele G</creator><creatorcontrib>Luisi, Daniele G</creatorcontrib><description>84 - technicians coordinate, then push the test button
9 - constructed of carbon steel, with a thickness of 125, 4 mm the cylinder is forged using Terni's imposing machinery.
46 - Ansaldo San Giorgio the carcass of the\ "hostator\" is ready
41 - water pipes built by the Franco Tosi and the BM steel mills and thunderstorms
49 - the train with the precious cargo leaves a tunnel
77 - fuel loading operations in the reactor begin in the sphere
80 - nuclear control is arranged in the premises below
18 - pressure closures for access to the sphere built by an American industry arrive at the port of Naples, and they download
17 - cover sheets are welded and then mounted under the control of a Chicago company
87 - lights that light up one after the other in all areas of working life and not
33 - the shadow of the helicopter that from where the shooting is done
50 - the cylindrical body is raised at 40 meters altitude inside the shell
22 - 18 columns support the sheets that will contain the sphere
6 - workers begin to work on the construction of the shell, machines pierce the ground with large cylinders driven by machines.
27 - health physics laboratory deals with radiometric measurements, equipment for measuring radioactivity
59 - the power station is connected with Rome and Naples via the high voltage wires
61 - Capodichino airport: landing the plane from San Josè in California with two of the 208 elements of combustible
39 - concrete analysis laboratory of which the construction site is equipped with the technicians who carry out the various tests
69 - through a door destined only for the employees you enter the sphere
1 - desks with folders with the names of scientists Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell in the offices of international general electric in Dresden in the USA
79 - 208 combustion elements are inserted into the reactor, closing
64 - fine-tuning of nuclear reaction control bars
8 - at the steel mills of Terni the pressure vessel of the reactor is forged where it takes place and the nuclear reaction is controlled.
30 - the completion of the ball, the latest welds
83 - this is the first work in Europe of nuclear electricity generated through a boiling water reactor.
29 - the surrounding area with the population centers, one is Sessa AURUNCA
73 - the switchroom, control center of the power station where nuclear technicians operate
37 - the foundations of the power plant building are completed
16 - at Ansaldo we build the\ "turbo alternator\"
88 - lights in a hospital ward, traffic lights, shop windows, all kinds of signs, St Peter's basilica that lights up inside
43 - the reactor pressure vessel is in the finishing phase after two years of work
Documentary on the construction of the electronuclear power plant in the Garigliano area
26 - in the central continue the sheet metal workers continue to be saladate the ball is almost completed
89 - the central with the shiny shell illuminated in the night
19 - the American ship and the boat with the piece for the power station
47 - Terni steel mills: reactor pressure vessel completed
70 - inside is a continuous alternation of stairs and ladders, pipe tangles, steel conductions, knobs and more.
62 - radiotive-material is transported by truck
44 - the civil works of the laboratory next to the sphere are almost completed
60 - skilled workers move on wires with special wheelchairs.
40 - concrete continues to be thrown in the pipeline for 36 hours in a row
51 - Sessa AURUNCA station: the arrival of the train
82 - everything is complete to give clue to operation
32 - the sphere seen from above with the workers working on it
86 - the power plant begins its production
85 - the panel turns on
81 - the power plant at dawn
21 - then from a burrow some specialized workers descend until they reach the bottom of the box
76 - end of the fifth roller
75 - specialized monitors and equipment
74 - annexed analysis laboratory
72 - the central from above
7 - the yard seen from above
68 - end of the fourth roller
67 - everything is ready for the general test
58 - end of the third roller
34 - a series of poles the iron to support the current wires are subjected to control grips with special pulls
3 - the Garigliano River seen from above and the surrounding plain to the bend
25 - steel mills of Terni, the construction of the shell is worked
63 - technicians detect radiotivity with special appliances
57 - Ansaldo: the turbine is completed
56 - premises of the auxiliary systems of the sphere
55 - the reactor vessel nela sphere
54 - workers paint the sphere of containment
53 - the arrival in central
52 - then the move on a tir
5 - construction of the bridge over the San Bellitto Rio
45 - end of the second roller
4 - aerial recovery of the territory
10 - the moment of cylinder cover with spiral welding, weld control
38 - concrete flows
35 - Ansaldo: stages of rotor processing
31 - the shell inside with the sun that filters
28 - pickup truck with weather station
24 - end of the first roller
23 - the first ring is complete
20 - the compressed air chest under construction
2 - Italy map
13 - excavation of the water intake for cooling
15 - scaffolding
14 - workers at work
12 - area where the plant will be built
11 - the shell has been completed
78 - each operation is communicated in the control room
66 - the chimney for the atmospheric release of the ventilation air dominates with its 100 meters all the plant
36 - building near Terni where sui perform all the welds of the reactor vessel that are photographed with the\ "rosotrone 2000\"
42 - control of the sphere with the pressure that is released inside and the workers who control on the shell by the method of air bubbles
71 - the turbo alternator with the Ansaldo inscription and with operaioo that drives knob
65 - drawing showing the functioning of nuclear power
48 - the huge container is transported on purpose built rail.
Documentario sulla costruzione della centrale elettronucleare nella zona del Garigliano
1 - scrivanie con cartelle con i nomi degli scienziati Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell negli uffici della International General Electric di Dresden negli USA
2 - cartina dell'Italia
3 - il fiume Garigliano visto dall'alto e la pianura circostante fino all'ansa
4 - ripresa aerea del territorio
5 - costruzione del ponte sul Rio San Bellitto
6 - operai cominciano a lavorare alla costruzione della calotta, macchine perforano il terreno con grandi cilindri spinti da macchine
7 - il cantiere visto dall'alto
8 - presso le acciaierie di Terni si forgia il recipiente a pressione del reattore dove avviene ed è controllata la reazione nucleare
9 - costruito in acciaio al carbonio, dallo spessore di 125, 4 mm il cilindro viene forgiato utilizzando gli imponenti macchinari della Terni
10 - il momento della copertura del cilindro con saldatura a spirale, il controllo delle saldature
11 - la calotta è stata ultimata
12 - zona dove verrà costruito l'impianto
13 - scavo della presa d'acqua per il raffreddamento
14 - operai al lavoro
15 - impalcature
16 - all'Ansaldo si costruisce il "turbo alternatore"
17 - le lamiere di copertura vengono saldate e poi montate sotto il controllo di una società di Chicago
18 - al porto di Napoli arrivano le chiusure a pressione per l'accesso alla sfera costruite da un'industria americana, maetranze che scaricano
19 - la nave americana e l'imbarcazione con il pezzo per la centrale
20 - il cassone ad aria compressa in costruzione
21 - poi da un cunicolo alcuni operai specializzati si calano fino a raggiungere il fondo del cassone
22 - 18 colonne sorreggono le lamiere che conterranno la sfera
23 - il primo anello è completo
24 - fine del primo rullo
25 - Acciaierie di Terni, si lavora lla costruzione della calotta
26 - in centrale proseguono i lavorile lamiere continuano ad essere saladate la sfera è quasi ultimata
27 - laboratorio di fisica sanitaria si occupa delle misure radiometriche, apparecchiature per misurare la radioattività
28 - camioncino con stazione metereologica
29 - la zona circostante con i centri abitati, uno è Sessa Aurunca
30 - il completamento della sfera, le ultime saldature
31 - la calotta all'interno con il sole che filtra
32 - la sfera vista dall'alto con gli operai che vi lavorano sopra
33 - l'ombra dell'elicottero che da dove si fanno le riprese
34 - una serie di pali i ferro per sostenere i fili della corrente vengono sottoposti a presi di controllo con tiraggi speciali
35 - Ansaldo: fasi della lavorazione dei rotori
36 - edificio nei pressi della Terni dove sui eseguono tutte le saldature del recipiente del reattore che vengono fotografate con il "rosotrone 2000"
37 - ultimate le fondazioni dell'edificio della centrale
38 - colate di cemento
39 - laboratorio di analisi del calcestruzzo di cui è dotato il cantiere con i tecnici che effettuano le varie prove
40 - in cantiere si continua a gettare calcestruzzo per 36 ore di seguito
41 - tubazioni per l'acqua costruite dalla Franco Tosi e dalla BM Acciaierie e tubifici di brescia
42 - controllo della sfera con la pressione che viene sprigionata all'interno e gli operai che sulla calotta controllano con il metodo delle bolle d'aria
43 - il recipiente a pressione del reattore è nella fase di ultimazione dopo due anni di lavoro
44 - i lavori civili del laboratorio accanto alla sfera sono quasi ultimati
45 - fine del secondo rullo
46 - Ansaldo San Giorgio è pronta la carcassa dell'"ostatore"
47 - Acciaierie di Terni: ultimato il recipiente a pressione del reattore
48 - l'enorme contenitore viene trasportato su rotaia costruita appositamente
49 - il treno con il prezioso carico esce da una galleria
50 - il corpo cilindrico viene sollevato a quota 40 metri all'interno della calotta
51 - stazione dei Sessa Aurunca: l'arrivo del treno
52 - poi lo spostamento su un tir
53 - l'arrivo in centrale
54 - operai</description><language>ita</language><subject>Acciaierie di Terni ; aeroporto di Capodichino ; Basilica di San Pietro ; Campania ; cantieri navali Franco Tosi a Taranto ; Centrale elettronucleare del Garigliano ; energia nucleare ; energie alternative ; ferrovie dello stato ; Fisica nucleare ; fiume Garigliano ; industria BM ; ingegneria nucleare ; lavori pubblici ; porto di Napoli ; processi produttivi ; rapporti italo-americani ; Sessa Aurunca ; vita metropolitana</subject><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://data.europeana.eu/item/08602/IL3000088681$$EHTML$$P50$$Geuropeana$$Hfree_for_read</linktohtml><link.rule.ids>780,38517,76176</link.rule.ids><linktorsrc>$$Uhttps://data.europeana.eu/item/08602/IL3000088681$$EView_record_in_Europeana$$FView_record_in_$$GEuropeana$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Luisi, Daniele G</creatorcontrib><title>A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source</title><description>84 - technicians coordinate, then push the test button
9 - constructed of carbon steel, with a thickness of 125, 4 mm the cylinder is forged using Terni's imposing machinery.
46 - Ansaldo San Giorgio the carcass of the\ "hostator\" is ready
41 - water pipes built by the Franco Tosi and the BM steel mills and thunderstorms
49 - the train with the precious cargo leaves a tunnel
77 - fuel loading operations in the reactor begin in the sphere
80 - nuclear control is arranged in the premises below
18 - pressure closures for access to the sphere built by an American industry arrive at the port of Naples, and they download
17 - cover sheets are welded and then mounted under the control of a Chicago company
87 - lights that light up one after the other in all areas of working life and not
33 - the shadow of the helicopter that from where the shooting is done
50 - the cylindrical body is raised at 40 meters altitude inside the shell
22 - 18 columns support the sheets that will contain the sphere
6 - workers begin to work on the construction of the shell, machines pierce the ground with large cylinders driven by machines.
27 - health physics laboratory deals with radiometric measurements, equipment for measuring radioactivity
59 - the power station is connected with Rome and Naples via the high voltage wires
61 - Capodichino airport: landing the plane from San Josè in California with two of the 208 elements of combustible
39 - concrete analysis laboratory of which the construction site is equipped with the technicians who carry out the various tests
69 - through a door destined only for the employees you enter the sphere
1 - desks with folders with the names of scientists Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell in the offices of international general electric in Dresden in the USA
79 - 208 combustion elements are inserted into the reactor, closing
64 - fine-tuning of nuclear reaction control bars
8 - at the steel mills of Terni the pressure vessel of the reactor is forged where it takes place and the nuclear reaction is controlled.
30 - the completion of the ball, the latest welds
83 - this is the first work in Europe of nuclear electricity generated through a boiling water reactor.
29 - the surrounding area with the population centers, one is Sessa AURUNCA
73 - the switchroom, control center of the power station where nuclear technicians operate
37 - the foundations of the power plant building are completed
16 - at Ansaldo we build the\ "turbo alternator\"
88 - lights in a hospital ward, traffic lights, shop windows, all kinds of signs, St Peter's basilica that lights up inside
43 - the reactor pressure vessel is in the finishing phase after two years of work
Documentary on the construction of the electronuclear power plant in the Garigliano area
26 - in the central continue the sheet metal workers continue to be saladate the ball is almost completed
89 - the central with the shiny shell illuminated in the night
19 - the American ship and the boat with the piece for the power station
47 - Terni steel mills: reactor pressure vessel completed
70 - inside is a continuous alternation of stairs and ladders, pipe tangles, steel conductions, knobs and more.
62 - radiotive-material is transported by truck
44 - the civil works of the laboratory next to the sphere are almost completed
60 - skilled workers move on wires with special wheelchairs.
40 - concrete continues to be thrown in the pipeline for 36 hours in a row
51 - Sessa AURUNCA station: the arrival of the train
82 - everything is complete to give clue to operation
32 - the sphere seen from above with the workers working on it
86 - the power plant begins its production
85 - the panel turns on
81 - the power plant at dawn
21 - then from a burrow some specialized workers descend until they reach the bottom of the box
76 - end of the fifth roller
75 - specialized monitors and equipment
74 - annexed analysis laboratory
72 - the central from above
7 - the yard seen from above
68 - end of the fourth roller
67 - everything is ready for the general test
58 - end of the third roller
34 - a series of poles the iron to support the current wires are subjected to control grips with special pulls
3 - the Garigliano River seen from above and the surrounding plain to the bend
25 - steel mills of Terni, the construction of the shell is worked
63 - technicians detect radiotivity with special appliances
57 - Ansaldo: the turbine is completed
56 - premises of the auxiliary systems of the sphere
55 - the reactor vessel nela sphere
54 - workers paint the sphere of containment
53 - the arrival in central
52 - then the move on a tir
5 - construction of the bridge over the San Bellitto Rio
45 - end of the second roller
4 - aerial recovery of the territory
10 - the moment of cylinder cover with spiral welding, weld control
38 - concrete flows
35 - Ansaldo: stages of rotor processing
31 - the shell inside with the sun that filters
28 - pickup truck with weather station
24 - end of the first roller
23 - the first ring is complete
20 - the compressed air chest under construction
2 - Italy map
13 - excavation of the water intake for cooling
15 - scaffolding
14 - workers at work
12 - area where the plant will be built
11 - the shell has been completed
78 - each operation is communicated in the control room
66 - the chimney for the atmospheric release of the ventilation air dominates with its 100 meters all the plant
36 - building near Terni where sui perform all the welds of the reactor vessel that are photographed with the\ "rosotrone 2000\"
42 - control of the sphere with the pressure that is released inside and the workers who control on the shell by the method of air bubbles
71 - the turbo alternator with the Ansaldo inscription and with operaioo that drives knob
65 - drawing showing the functioning of nuclear power
48 - the huge container is transported on purpose built rail.
Documentario sulla costruzione della centrale elettronucleare nella zona del Garigliano
1 - scrivanie con cartelle con i nomi degli scienziati Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell negli uffici della International General Electric di Dresden negli USA
2 - cartina dell'Italia
3 - il fiume Garigliano visto dall'alto e la pianura circostante fino all'ansa
4 - ripresa aerea del territorio
5 - costruzione del ponte sul Rio San Bellitto
6 - operai cominciano a lavorare alla costruzione della calotta, macchine perforano il terreno con grandi cilindri spinti da macchine
7 - il cantiere visto dall'alto
8 - presso le acciaierie di Terni si forgia il recipiente a pressione del reattore dove avviene ed è controllata la reazione nucleare
9 - costruito in acciaio al carbonio, dallo spessore di 125, 4 mm il cilindro viene forgiato utilizzando gli imponenti macchinari della Terni
10 - il momento della copertura del cilindro con saldatura a spirale, il controllo delle saldature
11 - la calotta è stata ultimata
12 - zona dove verrà costruito l'impianto
13 - scavo della presa d'acqua per il raffreddamento
14 - operai al lavoro
15 - impalcature
16 - all'Ansaldo si costruisce il "turbo alternatore"
17 - le lamiere di copertura vengono saldate e poi montate sotto il controllo di una società di Chicago
18 - al porto di Napoli arrivano le chiusure a pressione per l'accesso alla sfera costruite da un'industria americana, maetranze che scaricano
19 - la nave americana e l'imbarcazione con il pezzo per la centrale
20 - il cassone ad aria compressa in costruzione
21 - poi da un cunicolo alcuni operai specializzati si calano fino a raggiungere il fondo del cassone
22 - 18 colonne sorreggono le lamiere che conterranno la sfera
23 - il primo anello è completo
24 - fine del primo rullo
25 - Acciaierie di Terni, si lavora lla costruzione della calotta
26 - in centrale proseguono i lavorile lamiere continuano ad essere saladate la sfera è quasi ultimata
27 - laboratorio di fisica sanitaria si occupa delle misure radiometriche, apparecchiature per misurare la radioattività
28 - camioncino con stazione metereologica
29 - la zona circostante con i centri abitati, uno è Sessa Aurunca
30 - il completamento della sfera, le ultime saldature
31 - la calotta all'interno con il sole che filtra
32 - la sfera vista dall'alto con gli operai che vi lavorano sopra
33 - l'ombra dell'elicottero che da dove si fanno le riprese
34 - una serie di pali i ferro per sostenere i fili della corrente vengono sottoposti a presi di controllo con tiraggi speciali
35 - Ansaldo: fasi della lavorazione dei rotori
36 - edificio nei pressi della Terni dove sui eseguono tutte le saldature del recipiente del reattore che vengono fotografate con il "rosotrone 2000"
37 - ultimate le fondazioni dell'edificio della centrale
38 - colate di cemento
39 - laboratorio di analisi del calcestruzzo di cui è dotato il cantiere con i tecnici che effettuano le varie prove
40 - in cantiere si continua a gettare calcestruzzo per 36 ore di seguito
41 - tubazioni per l'acqua costruite dalla Franco Tosi e dalla BM Acciaierie e tubifici di brescia
42 - controllo della sfera con la pressione che viene sprigionata all'interno e gli operai che sulla calotta controllano con il metodo delle bolle d'aria
43 - il recipiente a pressione del reattore è nella fase di ultimazione dopo due anni di lavoro
44 - i lavori civili del laboratorio accanto alla sfera sono quasi ultimati
45 - fine del secondo rullo
46 - Ansaldo San Giorgio è pronta la carcassa dell'"ostatore"
47 - Acciaierie di Terni: ultimato il recipiente a pressione del reattore
48 - l'enorme contenitore viene trasportato su rotaia costruita appositamente
49 - il treno con il prezioso carico esce da una galleria
50 - il corpo cilindrico viene sollevato a quota 40 metri all'interno della calotta
51 - stazione dei Sessa Aurunca: l'arrivo del treno
52 - poi lo spostamento su un tir
53 - l'arrivo in centrale
54 - operai</description><subject>Acciaierie di Terni</subject><subject>aeroporto di Capodichino</subject><subject>Basilica di San Pietro</subject><subject>Campania</subject><subject>cantieri navali Franco Tosi a Taranto</subject><subject>Centrale elettronucleare del Garigliano</subject><subject>energia nucleare</subject><subject>energie alternative</subject><subject>ferrovie dello stato</subject><subject>Fisica nucleare</subject><subject>fiume Garigliano</subject><subject>industria BM</subject><subject>ingegneria nucleare</subject><subject>lavori pubblici</subject><subject>porto di Napoli</subject><subject>processi produttivi</subject><subject>rapporti italo-americani</subject><subject>Sessa Aurunca</subject><subject>vita metropolitana</subject><fulltext>true</fulltext><rsrctype>video</rsrctype><recordtype>video</recordtype><sourceid>1GC</sourceid><recordid>eNqVjb0KAjEQhNNYiPoO-wKe0YMj7XH4B5aWB2GJ63GwbGSTIL69CjaCjdMMfDDfTM3QgtAdSEiHB6RYNFAFHUlWZCCmkDVKCUyocCGGPeo48IgSqx6khwz4y9DKN5mbyRU50eLTM7Pabc_dYUlF441Q0IfI77sxSvLWNXbjj6favuJc49b1_4snohNIBQ</recordid><creator>Luisi, Daniele G</creator><scope>1GC</scope></search><sort><title>A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source</title><author>Luisi, Daniele G</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-europeana_collections_08602_IL30000886813</frbrgroupid><rsrctype>videos</rsrctype><prefilter>videos</prefilter><language>ita</language><topic>Acciaierie di Terni</topic><topic>aeroporto di Capodichino</topic><topic>Basilica di San Pietro</topic><topic>Campania</topic><topic>cantieri navali Franco Tosi a Taranto</topic><topic>Centrale elettronucleare del Garigliano</topic><topic>energia nucleare</topic><topic>energie alternative</topic><topic>ferrovie dello stato</topic><topic>Fisica nucleare</topic><topic>fiume Garigliano</topic><topic>industria BM</topic><topic>ingegneria nucleare</topic><topic>lavori pubblici</topic><topic>porto di Napoli</topic><topic>processi produttivi</topic><topic>rapporti italo-americani</topic><topic>Sessa Aurunca</topic><topic>vita metropolitana</topic><toplevel>online_resources</toplevel><creatorcontrib>Luisi, Daniele G</creatorcontrib><collection>Europeana Collections</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Luisi, Daniele G</au><genre>unknown</genre><ristype>VIDEO</ristype><title>A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source</title><abstract>84 - technicians coordinate, then push the test button
9 - constructed of carbon steel, with a thickness of 125, 4 mm the cylinder is forged using Terni's imposing machinery.
46 - Ansaldo San Giorgio the carcass of the\ "hostator\" is ready
41 - water pipes built by the Franco Tosi and the BM steel mills and thunderstorms
49 - the train with the precious cargo leaves a tunnel
77 - fuel loading operations in the reactor begin in the sphere
80 - nuclear control is arranged in the premises below
18 - pressure closures for access to the sphere built by an American industry arrive at the port of Naples, and they download
17 - cover sheets are welded and then mounted under the control of a Chicago company
87 - lights that light up one after the other in all areas of working life and not
33 - the shadow of the helicopter that from where the shooting is done
50 - the cylindrical body is raised at 40 meters altitude inside the shell
22 - 18 columns support the sheets that will contain the sphere
6 - workers begin to work on the construction of the shell, machines pierce the ground with large cylinders driven by machines.
27 - health physics laboratory deals with radiometric measurements, equipment for measuring radioactivity
59 - the power station is connected with Rome and Naples via the high voltage wires
61 - Capodichino airport: landing the plane from San Josè in California with two of the 208 elements of combustible
39 - concrete analysis laboratory of which the construction site is equipped with the technicians who carry out the various tests
69 - through a door destined only for the employees you enter the sphere
1 - desks with folders with the names of scientists Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell in the offices of international general electric in Dresden in the USA
79 - 208 combustion elements are inserted into the reactor, closing
64 - fine-tuning of nuclear reaction control bars
8 - at the steel mills of Terni the pressure vessel of the reactor is forged where it takes place and the nuclear reaction is controlled.
30 - the completion of the ball, the latest welds
83 - this is the first work in Europe of nuclear electricity generated through a boiling water reactor.
29 - the surrounding area with the population centers, one is Sessa AURUNCA
73 - the switchroom, control center of the power station where nuclear technicians operate
37 - the foundations of the power plant building are completed
16 - at Ansaldo we build the\ "turbo alternator\"
88 - lights in a hospital ward, traffic lights, shop windows, all kinds of signs, St Peter's basilica that lights up inside
43 - the reactor pressure vessel is in the finishing phase after two years of work
Documentary on the construction of the electronuclear power plant in the Garigliano area
26 - in the central continue the sheet metal workers continue to be saladate the ball is almost completed
89 - the central with the shiny shell illuminated in the night
19 - the American ship and the boat with the piece for the power station
47 - Terni steel mills: reactor pressure vessel completed
70 - inside is a continuous alternation of stairs and ladders, pipe tangles, steel conductions, knobs and more.
62 - radiotive-material is transported by truck
44 - the civil works of the laboratory next to the sphere are almost completed
60 - skilled workers move on wires with special wheelchairs.
40 - concrete continues to be thrown in the pipeline for 36 hours in a row
51 - Sessa AURUNCA station: the arrival of the train
82 - everything is complete to give clue to operation
32 - the sphere seen from above with the workers working on it
86 - the power plant begins its production
85 - the panel turns on
81 - the power plant at dawn
21 - then from a burrow some specialized workers descend until they reach the bottom of the box
76 - end of the fifth roller
75 - specialized monitors and equipment
74 - annexed analysis laboratory
72 - the central from above
7 - the yard seen from above
68 - end of the fourth roller
67 - everything is ready for the general test
58 - end of the third roller
34 - a series of poles the iron to support the current wires are subjected to control grips with special pulls
3 - the Garigliano River seen from above and the surrounding plain to the bend
25 - steel mills of Terni, the construction of the shell is worked
63 - technicians detect radiotivity with special appliances
57 - Ansaldo: the turbine is completed
56 - premises of the auxiliary systems of the sphere
55 - the reactor vessel nela sphere
54 - workers paint the sphere of containment
53 - the arrival in central
52 - then the move on a tir
5 - construction of the bridge over the San Bellitto Rio
45 - end of the second roller
4 - aerial recovery of the territory
10 - the moment of cylinder cover with spiral welding, weld control
38 - concrete flows
35 - Ansaldo: stages of rotor processing
31 - the shell inside with the sun that filters
28 - pickup truck with weather station
24 - end of the first roller
23 - the first ring is complete
20 - the compressed air chest under construction
2 - Italy map
13 - excavation of the water intake for cooling
15 - scaffolding
14 - workers at work
12 - area where the plant will be built
11 - the shell has been completed
78 - each operation is communicated in the control room
66 - the chimney for the atmospheric release of the ventilation air dominates with its 100 meters all the plant
36 - building near Terni where sui perform all the welds of the reactor vessel that are photographed with the\ "rosotrone 2000\"
42 - control of the sphere with the pressure that is released inside and the workers who control on the shell by the method of air bubbles
71 - the turbo alternator with the Ansaldo inscription and with operaioo that drives knob
65 - drawing showing the functioning of nuclear power
48 - the huge container is transported on purpose built rail.
Documentario sulla costruzione della centrale elettronucleare nella zona del Garigliano
1 - scrivanie con cartelle con i nomi degli scienziati Brunel Lewis, Mason Benedict, Francesco Giordani, Arthur Griswold (?), John M. Hill, Jules Horowits, R. E. Newell negli uffici della International General Electric di Dresden negli USA
2 - cartina dell'Italia
3 - il fiume Garigliano visto dall'alto e la pianura circostante fino all'ansa
4 - ripresa aerea del territorio
5 - costruzione del ponte sul Rio San Bellitto
6 - operai cominciano a lavorare alla costruzione della calotta, macchine perforano il terreno con grandi cilindri spinti da macchine
7 - il cantiere visto dall'alto
8 - presso le acciaierie di Terni si forgia il recipiente a pressione del reattore dove avviene ed è controllata la reazione nucleare
9 - costruito in acciaio al carbonio, dallo spessore di 125, 4 mm il cilindro viene forgiato utilizzando gli imponenti macchinari della Terni
10 - il momento della copertura del cilindro con saldatura a spirale, il controllo delle saldature
11 - la calotta è stata ultimata
12 - zona dove verrà costruito l'impianto
13 - scavo della presa d'acqua per il raffreddamento
14 - operai al lavoro
15 - impalcature
16 - all'Ansaldo si costruisce il "turbo alternatore"
17 - le lamiere di copertura vengono saldate e poi montate sotto il controllo di una società di Chicago
18 - al porto di Napoli arrivano le chiusure a pressione per l'accesso alla sfera costruite da un'industria americana, maetranze che scaricano
19 - la nave americana e l'imbarcazione con il pezzo per la centrale
20 - il cassone ad aria compressa in costruzione
21 - poi da un cunicolo alcuni operai specializzati si calano fino a raggiungere il fondo del cassone
22 - 18 colonne sorreggono le lamiere che conterranno la sfera
23 - il primo anello è completo
24 - fine del primo rullo
25 - Acciaierie di Terni, si lavora lla costruzione della calotta
26 - in centrale proseguono i lavorile lamiere continuano ad essere saladate la sfera è quasi ultimata
27 - laboratorio di fisica sanitaria si occupa delle misure radiometriche, apparecchiature per misurare la radioattività
28 - camioncino con stazione metereologica
29 - la zona circostante con i centri abitati, uno è Sessa Aurunca
30 - il completamento della sfera, le ultime saldature
31 - la calotta all'interno con il sole che filtra
32 - la sfera vista dall'alto con gli operai che vi lavorano sopra
33 - l'ombra dell'elicottero che da dove si fanno le riprese
34 - una serie di pali i ferro per sostenere i fili della corrente vengono sottoposti a presi di controllo con tiraggi speciali
35 - Ansaldo: fasi della lavorazione dei rotori
36 - edificio nei pressi della Terni dove sui eseguono tutte le saldature del recipiente del reattore che vengono fotografate con il "rosotrone 2000"
37 - ultimate le fondazioni dell'edificio della centrale
38 - colate di cemento
39 - laboratorio di analisi del calcestruzzo di cui è dotato il cantiere con i tecnici che effettuano le varie prove
40 - in cantiere si continua a gettare calcestruzzo per 36 ore di seguito
41 - tubazioni per l'acqua costruite dalla Franco Tosi e dalla BM Acciaierie e tubifici di brescia
42 - controllo della sfera con la pressione che viene sprigionata all'interno e gli operai che sulla calotta controllano con il metodo delle bolle d'aria
43 - il recipiente a pressione del reattore è nella fase di ultimazione dopo due anni di lavoro
44 - i lavori civili del laboratorio accanto alla sfera sono quasi ultimati
45 - fine del secondo rullo
46 - Ansaldo San Giorgio è pronta la carcassa dell'"ostatore"
47 - Acciaierie di Terni: ultimato il recipiente a pressione del reattore
48 - l'enorme contenitore viene trasportato su rotaia costruita appositamente
49 - il treno con il prezioso carico esce da una galleria
50 - il corpo cilindrico viene sollevato a quota 40 metri all'interno della calotta
51 - stazione dei Sessa Aurunca: l'arrivo del treno
52 - poi lo spostamento su un tir
53 - l'arrivo in centrale
54 - operai</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | ita |
recordid | cdi_europeana_collections_08602_IL3000088681 |
source | Europeana Collections |
subjects | Acciaierie di Terni aeroporto di Capodichino Basilica di San Pietro Campania cantieri navali Franco Tosi a Taranto Centrale elettronucleare del Garigliano energia nucleare energie alternative ferrovie dello stato Fisica nucleare fiume Garigliano industria BM ingegneria nucleare lavori pubblici porto di Napoli processi produttivi rapporti italo-americani Sessa Aurunca vita metropolitana |
title | A new energy source. Central electronuclear del Garigliano.\ n\ t a new energy source. An energy source |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T23%3A25%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-europeana_1GC&rft_val_fmt=info:ofi/fmt:kev:mtx:&rft.genre=unknown&rft.au=Luisi,%20Daniele%20G&rft_id=info:doi/&rft_dat=%3Ceuropeana_1GC%3E08602_IL3000088681%3C/europeana_1GC%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |