METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS

In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DOEROEMBOEZI L, BARSI K, RORISEK I, KUBURCZIK G, STUBER G
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DOEROEMBOEZI L
BARSI K
RORISEK I
KUBURCZIK G
STUBER G
description In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_YU41696BB</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>YU41696BB</sourcerecordid><originalsourceid>FETCH-epo_espacenet_YU41696BB3</originalsourceid><addsrcrecordid>eNrjZPDzdQ3x8HdR8HdTcI0ICXJ0DvH0c1dw9nf0UfD0Uwjx8HT2VvBxjHQNClZwilRwDgoN9gApcPEP91NwDFHwcXUMDlEICfeHKuJhYE1LzClO5YXS3Axybq4hzh66qQX58anFBYnJqXmpJfGRoSaGZpZmTk7GBBUAAOoDLVk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><source>esp@cenet</source><creator>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</creator><creatorcontrib>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</creatorcontrib><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><edition>4</edition><language>eng</language><subject>ARTIFICIAL STONE ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; LIME, MAGNESIA ; METALLURGY ; MINING ; MINING OR QUARRYING ; REFRACTORIES ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; SLAG ; TREATMENT OF NATURAL STONE ; TUNNELS</subject><creationdate>1987</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19871231&amp;DB=EPODOC&amp;CC=YU&amp;NR=41696B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19871231&amp;DB=EPODOC&amp;CC=YU&amp;NR=41696B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DOEROEMBOEZI L</creatorcontrib><creatorcontrib>BARSI K</creatorcontrib><creatorcontrib>RORISEK I</creatorcontrib><creatorcontrib>KUBURCZIK G</creatorcontrib><creatorcontrib>STUBER G</creatorcontrib><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><subject>ARTIFICIAL STONE</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIME, MAGNESIA</subject><subject>METALLURGY</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>REFRACTORIES</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>SLAG</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1987</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPDzdQ3x8HdR8HdTcI0ICXJ0DvH0c1dw9nf0UfD0Uwjx8HT2VvBxjHQNClZwilRwDgoN9gApcPEP91NwDFHwcXUMDlEICfeHKuJhYE1LzClO5YXS3Axybq4hzh66qQX58anFBYnJqXmpJfGRoSaGZpZmTk7GBBUAAOoDLVk</recordid><startdate>19871231</startdate><enddate>19871231</enddate><creator>DOEROEMBOEZI L</creator><creator>BARSI K</creator><creator>RORISEK I</creator><creator>KUBURCZIK G</creator><creator>STUBER G</creator><scope>EVB</scope></search><sort><creationdate>19871231</creationdate><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><author>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_YU41696BB3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1987</creationdate><topic>ARTIFICIAL STONE</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIME, MAGNESIA</topic><topic>METALLURGY</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>REFRACTORIES</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>SLAG</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DOEROEMBOEZI L</creatorcontrib><creatorcontrib>BARSI K</creatorcontrib><creatorcontrib>RORISEK I</creatorcontrib><creatorcontrib>KUBURCZIK G</creatorcontrib><creatorcontrib>STUBER G</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DOEROEMBOEZI L</au><au>BARSI K</au><au>RORISEK I</au><au>KUBURCZIK G</au><au>STUBER G</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><date>1987-12-31</date><risdate>1987</risdate><abstract>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</abstract><edition>4</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_YU41696BB
source esp@cenet
subjects ARTIFICIAL STONE
CEMENTS
CERAMICS
CHEMISTRY
COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS
CONCRETE
EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
LIME, MAGNESIA
METALLURGY
MINING
MINING OR QUARRYING
REFRACTORIES
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SHAFTS
SLAG
TREATMENT OF NATURAL STONE
TUNNELS
title METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T14%3A37%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DOEROEMBOEZI%20L&rft.date=1987-12-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EYU41696BB%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true