METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS
In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench,...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | DOEROEMBOEZI L BARSI K RORISEK I KUBURCZIK G STUBER G |
description | In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_YU41696BB</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>YU41696BB</sourcerecordid><originalsourceid>FETCH-epo_espacenet_YU41696BB3</originalsourceid><addsrcrecordid>eNrjZPDzdQ3x8HdR8HdTcI0ICXJ0DvH0c1dw9nf0UfD0Uwjx8HT2VvBxjHQNClZwilRwDgoN9gApcPEP91NwDFHwcXUMDlEICfeHKuJhYE1LzClO5YXS3Axybq4hzh66qQX58anFBYnJqXmpJfGRoSaGZpZmTk7GBBUAAOoDLVk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><source>esp@cenet</source><creator>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</creator><creatorcontrib>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</creatorcontrib><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><edition>4</edition><language>eng</language><subject>ARTIFICIAL STONE ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; LIME, MAGNESIA ; METALLURGY ; MINING ; MINING OR QUARRYING ; REFRACTORIES ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SHAFTS ; SLAG ; TREATMENT OF NATURAL STONE ; TUNNELS</subject><creationdate>1987</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19871231&DB=EPODOC&CC=YU&NR=41696B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19871231&DB=EPODOC&CC=YU&NR=41696B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DOEROEMBOEZI L</creatorcontrib><creatorcontrib>BARSI K</creatorcontrib><creatorcontrib>RORISEK I</creatorcontrib><creatorcontrib>KUBURCZIK G</creatorcontrib><creatorcontrib>STUBER G</creatorcontrib><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><description>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</description><subject>ARTIFICIAL STONE</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIME, MAGNESIA</subject><subject>METALLURGY</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>REFRACTORIES</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SHAFTS</subject><subject>SLAG</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1987</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPDzdQ3x8HdR8HdTcI0ICXJ0DvH0c1dw9nf0UfD0Uwjx8HT2VvBxjHQNClZwilRwDgoN9gApcPEP91NwDFHwcXUMDlEICfeHKuJhYE1LzClO5YXS3Axybq4hzh66qQX58anFBYnJqXmpJfGRoSaGZpZmTk7GBBUAAOoDLVk</recordid><startdate>19871231</startdate><enddate>19871231</enddate><creator>DOEROEMBOEZI L</creator><creator>BARSI K</creator><creator>RORISEK I</creator><creator>KUBURCZIK G</creator><creator>STUBER G</creator><scope>EVB</scope></search><sort><creationdate>19871231</creationdate><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><author>DOEROEMBOEZI L ; BARSI K ; RORISEK I ; KUBURCZIK G ; STUBER G</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_YU41696BB3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1987</creationdate><topic>ARTIFICIAL STONE</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIME, MAGNESIA</topic><topic>METALLURGY</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>REFRACTORIES</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SHAFTS</topic><topic>SLAG</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>DOEROEMBOEZI L</creatorcontrib><creatorcontrib>BARSI K</creatorcontrib><creatorcontrib>RORISEK I</creatorcontrib><creatorcontrib>KUBURCZIK G</creatorcontrib><creatorcontrib>STUBER G</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DOEROEMBOEZI L</au><au>BARSI K</au><au>RORISEK I</au><au>KUBURCZIK G</au><au>STUBER G</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS</title><date>1987-12-31</date><risdate>1987</risdate><abstract>In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay.</abstract><edition>4</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_YU41696BB |
source | esp@cenet |
subjects | ARTIFICIAL STONE CEMENTS CERAMICS CHEMISTRY COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS CONCRETE EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS LIME, MAGNESIA METALLURGY MINING MINING OR QUARRYING REFRACTORIES SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS SHAFTS SLAG TREATMENT OF NATURAL STONE TUNNELS |
title | METHOD OF EXTRACTING COAL IN THICK LAYERS BY CRUSHING DOWN AT LEAST TWO LAYERS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T14%3A37%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DOEROEMBOEZI%20L&rft.date=1987-12-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EYU41696BB%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |