PROCESS FOR MAKING CONCRETE BASE IN GROUND

The essence of the invention consists in the fact that the soil (10) is loosened at the location of the foundation body to be constructed and monolithic concrete (13) is injected under the loose soil mass (11), whereby the loosened soil is displaced from the space (12) containing the loosened soil a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: REGELE Z, SIPKA I, JUNOS M, SIRKO M, ILLES J
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator REGELE Z
SIPKA I
JUNOS M
SIRKO M
ILLES J
description The essence of the invention consists in the fact that the soil (10) is loosened at the location of the foundation body to be constructed and monolithic concrete (13) is injected under the loose soil mass (11), whereby the loosened soil is displaced from the space (12) containing the loosened soil and/or is removed in another manner, and at the same time the foundation body is formed once the space is filled with concrete. The apparatus is provided with a drilling tool and a concrete pump (7) and is characterised in that the drilling tool is formed by a screw disc (5), the connecting rod (4) of which can be attached to the rotary device (3) and the concrete pump and is designed as a pipe for delivering the concrete. The advantage of the solution according to the invention lies in the fact that a foundation body of first-class quality and with high strength values can be produced efficiently and quickly.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_YU31184A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>YU31184A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_YU31184A3</originalsourceid><addsrcrecordid>eNrjZNAKCPJ3dg0OVnDzD1LwdfT29HNXcPb3cw5yDXFVcHIMdlXw9FNwD_IP9XPhYWBNS8wpTuWF0twMsm6uIc4euqkF-fGpxQWJyal5qSXxkaHGhoYWJo7GhOQBKnMi9g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS FOR MAKING CONCRETE BASE IN GROUND</title><source>esp@cenet</source><creator>REGELE Z ; SIPKA I ; JUNOS M ; SIRKO M ; ILLES J</creator><creatorcontrib>REGELE Z ; SIPKA I ; JUNOS M ; SIRKO M ; ILLES J</creatorcontrib><description>The essence of the invention consists in the fact that the soil (10) is loosened at the location of the foundation body to be constructed and monolithic concrete (13) is injected under the loose soil mass (11), whereby the loosened soil is displaced from the space (12) containing the loosened soil and/or is removed in another manner, and at the same time the foundation body is formed once the space is filled with concrete. The apparatus is provided with a drilling tool and a concrete pump (7) and is characterised in that the drilling tool is formed by a screw disc (5), the connecting rod (4) of which can be attached to the rotary device (3) and the concrete pump and is designed as a pipe for delivering the concrete. The advantage of the solution according to the invention lies in the fact that a foundation body of first-class quality and with high strength values can be produced efficiently and quickly.</description><edition>4</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1988</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19880831&amp;DB=EPODOC&amp;CC=YU&amp;NR=31184A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19880831&amp;DB=EPODOC&amp;CC=YU&amp;NR=31184A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>REGELE Z</creatorcontrib><creatorcontrib>SIPKA I</creatorcontrib><creatorcontrib>JUNOS M</creatorcontrib><creatorcontrib>SIRKO M</creatorcontrib><creatorcontrib>ILLES J</creatorcontrib><title>PROCESS FOR MAKING CONCRETE BASE IN GROUND</title><description>The essence of the invention consists in the fact that the soil (10) is loosened at the location of the foundation body to be constructed and monolithic concrete (13) is injected under the loose soil mass (11), whereby the loosened soil is displaced from the space (12) containing the loosened soil and/or is removed in another manner, and at the same time the foundation body is formed once the space is filled with concrete. The apparatus is provided with a drilling tool and a concrete pump (7) and is characterised in that the drilling tool is formed by a screw disc (5), the connecting rod (4) of which can be attached to the rotary device (3) and the concrete pump and is designed as a pipe for delivering the concrete. The advantage of the solution according to the invention lies in the fact that a foundation body of first-class quality and with high strength values can be produced efficiently and quickly.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1988</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAKCPJ3dg0OVnDzD1LwdfT29HNXcPb3cw5yDXFVcHIMdlXw9FNwD_IP9XPhYWBNS8wpTuWF0twMsm6uIc4euqkF-fGpxQWJyal5qSXxkaHGhoYWJo7GhOQBKnMi9g</recordid><startdate>19880831</startdate><enddate>19880831</enddate><creator>REGELE Z</creator><creator>SIPKA I</creator><creator>JUNOS M</creator><creator>SIRKO M</creator><creator>ILLES J</creator><scope>EVB</scope></search><sort><creationdate>19880831</creationdate><title>PROCESS FOR MAKING CONCRETE BASE IN GROUND</title><author>REGELE Z ; SIPKA I ; JUNOS M ; SIRKO M ; ILLES J</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_YU31184A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1988</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>REGELE Z</creatorcontrib><creatorcontrib>SIPKA I</creatorcontrib><creatorcontrib>JUNOS M</creatorcontrib><creatorcontrib>SIRKO M</creatorcontrib><creatorcontrib>ILLES J</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>REGELE Z</au><au>SIPKA I</au><au>JUNOS M</au><au>SIRKO M</au><au>ILLES J</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS FOR MAKING CONCRETE BASE IN GROUND</title><date>1988-08-31</date><risdate>1988</risdate><abstract>The essence of the invention consists in the fact that the soil (10) is loosened at the location of the foundation body to be constructed and monolithic concrete (13) is injected under the loose soil mass (11), whereby the loosened soil is displaced from the space (12) containing the loosened soil and/or is removed in another manner, and at the same time the foundation body is formed once the space is filled with concrete. The apparatus is provided with a drilling tool and a concrete pump (7) and is characterised in that the drilling tool is formed by a screw disc (5), the connecting rod (4) of which can be attached to the rotary device (3) and the concrete pump and is designed as a pipe for delivering the concrete. The advantage of the solution according to the invention lies in the fact that a foundation body of first-class quality and with high strength values can be produced efficiently and quickly.</abstract><edition>4</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_YU31184A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title PROCESS FOR MAKING CONCRETE BASE IN GROUND
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T03%3A45%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=REGELE%20Z&rft.date=1988-08-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EYU31184A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true