PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION
A first well, configured to act as a production well or an injection well, is formed. The first well includes a first horizontal portion. A second well, configured to act as a production well or an injection well, is formed. The second well includes a second horizontal portion substantially parallel...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ALKHATEEB, AbdulAziz Salah AULIA, Fahmi HALDAR, Surajit ALSHEHRI, Amar Jaber M |
description | A first well, configured to act as a production well or an injection well, is formed. The first well includes a first horizontal portion. A second well, configured to act as a production well or an injection well, is formed. The second well includes a second horizontal portion substantially parallel to the first horizontal portion. The first horizontal portion and the second horizontal portion are at different depths. A fluid is injected into a geologic formation through the first well for a first duration of time. Hydrocarbons are produced from the geologic formation through the second well for the first duration of time. A fluid is injected into a geologic formation through the second well for a second duration of time. Hydrocarbons are produced from the geologic formation through the first well for the second duration of time.
Selon l'invention, un premier puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le premier puits comprend une première partie horizontale. Un second puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le second puits comprend une seconde partie horizontale pratiquement parallèle à la première partie horizontale. La première partie horizontale et la seconde partie horizontale sont à des profondeurs différentes. Un fluide est injecté dans une formation géologique par le premier puits pendant une première durée. Des hydrocarbures sont produits à partir de la formation géologique par le second puits pendant la première durée. Un fluide est injecté dans une formation géologique par le second puits pendant une seconde durée. Des hydrocarbures sont produits à partir de la formation géologique par le premier puits pendant la seconde durée. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_WO2022035749A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>WO2022035749A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_WO2022035749A13</originalsourceid><addsrcrecordid>eNqNirEKwjAURbM4iPoPD5yFmiriGPNiEy15JU2ITqVInEQL9f-xoji73MPlnDFLlSMM0tgC9BkdSeF2ZGuIxmv4HEBDJ4MKhEWIwisHxh6U9GZwXjsKhYbaC3lUCOXbixIwDPPLpmx0bW99mn05YfO98lIvUvdoUt-1l3RPzyYSzzjP8vVmtRXL_L_qBW5JNdc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION</title><source>esp@cenet</source><creator>ALKHATEEB, AbdulAziz Salah ; AULIA, Fahmi ; HALDAR, Surajit ; ALSHEHRI, Amar Jaber M</creator><creatorcontrib>ALKHATEEB, AbdulAziz Salah ; AULIA, Fahmi ; HALDAR, Surajit ; ALSHEHRI, Amar Jaber M</creatorcontrib><description>A first well, configured to act as a production well or an injection well, is formed. The first well includes a first horizontal portion. A second well, configured to act as a production well or an injection well, is formed. The second well includes a second horizontal portion substantially parallel to the first horizontal portion. The first horizontal portion and the second horizontal portion are at different depths. A fluid is injected into a geologic formation through the first well for a first duration of time. Hydrocarbons are produced from the geologic formation through the second well for the first duration of time. A fluid is injected into a geologic formation through the second well for a second duration of time. Hydrocarbons are produced from the geologic formation through the first well for the second duration of time.
Selon l'invention, un premier puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le premier puits comprend une première partie horizontale. Un second puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le second puits comprend une seconde partie horizontale pratiquement parallèle à la première partie horizontale. La première partie horizontale et la seconde partie horizontale sont à des profondeurs différentes. Un fluide est injecté dans une formation géologique par le premier puits pendant une première durée. Des hydrocarbures sont produits à partir de la formation géologique par le second puits pendant la première durée. Un fluide est injecté dans une formation géologique par le second puits pendant une seconde durée. Des hydrocarbures sont produits à partir de la formation géologique par le premier puits pendant la seconde durée.</description><language>eng ; fre</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220217&DB=EPODOC&CC=WO&NR=2022035749A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220217&DB=EPODOC&CC=WO&NR=2022035749A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ALKHATEEB, AbdulAziz Salah</creatorcontrib><creatorcontrib>AULIA, Fahmi</creatorcontrib><creatorcontrib>HALDAR, Surajit</creatorcontrib><creatorcontrib>ALSHEHRI, Amar Jaber M</creatorcontrib><title>PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION</title><description>A first well, configured to act as a production well or an injection well, is formed. The first well includes a first horizontal portion. A second well, configured to act as a production well or an injection well, is formed. The second well includes a second horizontal portion substantially parallel to the first horizontal portion. The first horizontal portion and the second horizontal portion are at different depths. A fluid is injected into a geologic formation through the first well for a first duration of time. Hydrocarbons are produced from the geologic formation through the second well for the first duration of time. A fluid is injected into a geologic formation through the second well for a second duration of time. Hydrocarbons are produced from the geologic formation through the first well for the second duration of time.
Selon l'invention, un premier puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le premier puits comprend une première partie horizontale. Un second puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le second puits comprend une seconde partie horizontale pratiquement parallèle à la première partie horizontale. La première partie horizontale et la seconde partie horizontale sont à des profondeurs différentes. Un fluide est injecté dans une formation géologique par le premier puits pendant une première durée. Des hydrocarbures sont produits à partir de la formation géologique par le second puits pendant la première durée. Un fluide est injecté dans une formation géologique par le second puits pendant une seconde durée. Des hydrocarbures sont produits à partir de la formation géologique par le premier puits pendant la seconde durée.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNirEKwjAURbM4iPoPD5yFmiriGPNiEy15JU2ITqVInEQL9f-xoji73MPlnDFLlSMM0tgC9BkdSeF2ZGuIxmv4HEBDJ4MKhEWIwisHxh6U9GZwXjsKhYbaC3lUCOXbixIwDPPLpmx0bW99mn05YfO98lIvUvdoUt-1l3RPzyYSzzjP8vVmtRXL_L_qBW5JNdc</recordid><startdate>20220217</startdate><enddate>20220217</enddate><creator>ALKHATEEB, AbdulAziz Salah</creator><creator>AULIA, Fahmi</creator><creator>HALDAR, Surajit</creator><creator>ALSHEHRI, Amar Jaber M</creator><scope>EVB</scope></search><sort><creationdate>20220217</creationdate><title>PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION</title><author>ALKHATEEB, AbdulAziz Salah ; AULIA, Fahmi ; HALDAR, Surajit ; ALSHEHRI, Amar Jaber M</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_WO2022035749A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>ALKHATEEB, AbdulAziz Salah</creatorcontrib><creatorcontrib>AULIA, Fahmi</creatorcontrib><creatorcontrib>HALDAR, Surajit</creatorcontrib><creatorcontrib>ALSHEHRI, Amar Jaber M</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ALKHATEEB, AbdulAziz Salah</au><au>AULIA, Fahmi</au><au>HALDAR, Surajit</au><au>ALSHEHRI, Amar Jaber M</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION</title><date>2022-02-17</date><risdate>2022</risdate><abstract>A first well, configured to act as a production well or an injection well, is formed. The first well includes a first horizontal portion. A second well, configured to act as a production well or an injection well, is formed. The second well includes a second horizontal portion substantially parallel to the first horizontal portion. The first horizontal portion and the second horizontal portion are at different depths. A fluid is injected into a geologic formation through the first well for a first duration of time. Hydrocarbons are produced from the geologic formation through the second well for the first duration of time. A fluid is injected into a geologic formation through the second well for a second duration of time. Hydrocarbons are produced from the geologic formation through the first well for the second duration of time.
Selon l'invention, un premier puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le premier puits comprend une première partie horizontale. Un second puits, conçu pour servir de puits de production ou de puits d'injection, est formé. Le second puits comprend une seconde partie horizontale pratiquement parallèle à la première partie horizontale. La première partie horizontale et la seconde partie horizontale sont à des profondeurs différentes. Un fluide est injecté dans une formation géologique par le premier puits pendant une première durée. Des hydrocarbures sont produits à partir de la formation géologique par le second puits pendant la première durée. Un fluide est injecté dans une formation géologique par le second puits pendant une seconde durée. Des hydrocarbures sont produits à partir de la formation géologique par le premier puits pendant la seconde durée.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; fre |
recordid | cdi_epo_espacenet_WO2022035749A1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | PRODUCING HYDROCARBONS WITH CARBON DIOXIDE AND WATER INJECTION THROUGH STACKED LATERAL DUAL INJECTION |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-21T04%3A42%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ALKHATEEB,%20AbdulAziz%20Salah&rft.date=2022-02-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EWO2022035749A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |