CONNECTOR POSITION ASSURANCE MEMBER
A connector position assurance device 200 having a base portion 202 and a pair of resiliently deformable beams 204, 205. Cam engaging members 250 extend from side walls 256 of the pair of resiliently deformable beams 204, 205. A first lockout projection engagement member 230 is provided proximate th...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng ; fre |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | EVANS, Nicholas Lee FOLTZ, Keith Richard |
description | A connector position assurance device 200 having a base portion 202 and a pair of resiliently deformable beams 204, 205. Cam engaging members 250 extend from side walls 256 of the pair of resiliently deformable beams 204, 205. A first lockout projection engagement member 230 is provided proximate the beam front ends 224 of the pair of resiliently deformable beams 204, 205 and extends between the first beam 204 and the second beam 205. A second lockout projection engagement member 240 is spaced from the base front end 210 and spaced from the first lockout projection engagement member 230. The second lockout projection engagement member 240 extends between the first beam 204 and the second beam 205. A lockout projection receiving opening 254 is formed by the first lockout projection engagement member 230, the second lockout projection engagement member 240, and portions of the pair of resiliently deformable beams 204, 205.
L'invention concerne un dispositif d'assurance de position de connecteur (200) comprenant une portion de base (202) et une paire de poutres élastiquement déformables (204, 205). Des éléments de mise en prise de came (250) s'étendent à partir de parois latérales (256) de la paire de poutres élastiquement déformables (204, 205). Un premier élément de mise en prise de saillie de verrouillage (230) est disposé à proximité des extrémités avant (224) de la paire de poutres élastiquement déformables (204, 205) et s'étend entre la première poutre (204) et la deuxième poutre (205). Un deuxième élément de mise en prise de saillie de verrouillage (240) est espacé de l'extrémité avant de base (210) et espacé du premier élément de mise en prise de saillie de verrouillage (230). Le deuxième élément de mise en prise de saillie de verrouillage (240) s'étend entre la première poutre (204) et la deuxième poutre (205). Une ouverture de réception de saillie de verrouillage (254) est formée par le premier élément de mise en prise de saillie de verrouillage (230), le deuxième élément de mise en prise de saillie de verrouillage (240) et des portions de la paire de poutres élastiquement déformables (204, 205). |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_WO2019180562A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>WO2019180562A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_WO2019180562A13</originalsourceid><addsrcrecordid>eNrjZFB29vfzc3UO8Q9SCPAP9gzx9PdTcAwODg1y9HN2VfB19XVyDeJhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfHh_kYGhpaGFgamZkaOhsbEqQIA_b8j2w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONNECTOR POSITION ASSURANCE MEMBER</title><source>esp@cenet</source><creator>EVANS, Nicholas Lee ; FOLTZ, Keith Richard</creator><creatorcontrib>EVANS, Nicholas Lee ; FOLTZ, Keith Richard</creatorcontrib><description>A connector position assurance device 200 having a base portion 202 and a pair of resiliently deformable beams 204, 205. Cam engaging members 250 extend from side walls 256 of the pair of resiliently deformable beams 204, 205. A first lockout projection engagement member 230 is provided proximate the beam front ends 224 of the pair of resiliently deformable beams 204, 205 and extends between the first beam 204 and the second beam 205. A second lockout projection engagement member 240 is spaced from the base front end 210 and spaced from the first lockout projection engagement member 230. The second lockout projection engagement member 240 extends between the first beam 204 and the second beam 205. A lockout projection receiving opening 254 is formed by the first lockout projection engagement member 230, the second lockout projection engagement member 240, and portions of the pair of resiliently deformable beams 204, 205.
L'invention concerne un dispositif d'assurance de position de connecteur (200) comprenant une portion de base (202) et une paire de poutres élastiquement déformables (204, 205). Des éléments de mise en prise de came (250) s'étendent à partir de parois latérales (256) de la paire de poutres élastiquement déformables (204, 205). Un premier élément de mise en prise de saillie de verrouillage (230) est disposé à proximité des extrémités avant (224) de la paire de poutres élastiquement déformables (204, 205) et s'étend entre la première poutre (204) et la deuxième poutre (205). Un deuxième élément de mise en prise de saillie de verrouillage (240) est espacé de l'extrémité avant de base (210) et espacé du premier élément de mise en prise de saillie de verrouillage (230). Le deuxième élément de mise en prise de saillie de verrouillage (240) s'étend entre la première poutre (204) et la deuxième poutre (205). Une ouverture de réception de saillie de verrouillage (254) est formée par le premier élément de mise en prise de saillie de verrouillage (230), le deuxième élément de mise en prise de saillie de verrouillage (240) et des portions de la paire de poutres élastiquement déformables (204, 205).</description><language>eng ; fre</language><subject>BASIC ELECTRIC ELEMENTS ; CURRENT COLLECTORS ; ELECTRICITY ; LINE CONNECTORS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190926&DB=EPODOC&CC=WO&NR=2019180562A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190926&DB=EPODOC&CC=WO&NR=2019180562A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>EVANS, Nicholas Lee</creatorcontrib><creatorcontrib>FOLTZ, Keith Richard</creatorcontrib><title>CONNECTOR POSITION ASSURANCE MEMBER</title><description>A connector position assurance device 200 having a base portion 202 and a pair of resiliently deformable beams 204, 205. Cam engaging members 250 extend from side walls 256 of the pair of resiliently deformable beams 204, 205. A first lockout projection engagement member 230 is provided proximate the beam front ends 224 of the pair of resiliently deformable beams 204, 205 and extends between the first beam 204 and the second beam 205. A second lockout projection engagement member 240 is spaced from the base front end 210 and spaced from the first lockout projection engagement member 230. The second lockout projection engagement member 240 extends between the first beam 204 and the second beam 205. A lockout projection receiving opening 254 is formed by the first lockout projection engagement member 230, the second lockout projection engagement member 240, and portions of the pair of resiliently deformable beams 204, 205.
L'invention concerne un dispositif d'assurance de position de connecteur (200) comprenant une portion de base (202) et une paire de poutres élastiquement déformables (204, 205). Des éléments de mise en prise de came (250) s'étendent à partir de parois latérales (256) de la paire de poutres élastiquement déformables (204, 205). Un premier élément de mise en prise de saillie de verrouillage (230) est disposé à proximité des extrémités avant (224) de la paire de poutres élastiquement déformables (204, 205) et s'étend entre la première poutre (204) et la deuxième poutre (205). Un deuxième élément de mise en prise de saillie de verrouillage (240) est espacé de l'extrémité avant de base (210) et espacé du premier élément de mise en prise de saillie de verrouillage (230). Le deuxième élément de mise en prise de saillie de verrouillage (240) s'étend entre la première poutre (204) et la deuxième poutre (205). Une ouverture de réception de saillie de verrouillage (254) est formée par le premier élément de mise en prise de saillie de verrouillage (230), le deuxième élément de mise en prise de saillie de verrouillage (240) et des portions de la paire de poutres élastiquement déformables (204, 205).</description><subject>BASIC ELECTRIC ELEMENTS</subject><subject>CURRENT COLLECTORS</subject><subject>ELECTRICITY</subject><subject>LINE CONNECTORS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB29vfzc3UO8Q9SCPAP9gzx9PdTcAwODg1y9HN2VfB19XVyDeJhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfHh_kYGhpaGFgamZkaOhsbEqQIA_b8j2w</recordid><startdate>20190926</startdate><enddate>20190926</enddate><creator>EVANS, Nicholas Lee</creator><creator>FOLTZ, Keith Richard</creator><scope>EVB</scope></search><sort><creationdate>20190926</creationdate><title>CONNECTOR POSITION ASSURANCE MEMBER</title><author>EVANS, Nicholas Lee ; FOLTZ, Keith Richard</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_WO2019180562A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre</language><creationdate>2019</creationdate><topic>BASIC ELECTRIC ELEMENTS</topic><topic>CURRENT COLLECTORS</topic><topic>ELECTRICITY</topic><topic>LINE CONNECTORS</topic><toplevel>online_resources</toplevel><creatorcontrib>EVANS, Nicholas Lee</creatorcontrib><creatorcontrib>FOLTZ, Keith Richard</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>EVANS, Nicholas Lee</au><au>FOLTZ, Keith Richard</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONNECTOR POSITION ASSURANCE MEMBER</title><date>2019-09-26</date><risdate>2019</risdate><abstract>A connector position assurance device 200 having a base portion 202 and a pair of resiliently deformable beams 204, 205. Cam engaging members 250 extend from side walls 256 of the pair of resiliently deformable beams 204, 205. A first lockout projection engagement member 230 is provided proximate the beam front ends 224 of the pair of resiliently deformable beams 204, 205 and extends between the first beam 204 and the second beam 205. A second lockout projection engagement member 240 is spaced from the base front end 210 and spaced from the first lockout projection engagement member 230. The second lockout projection engagement member 240 extends between the first beam 204 and the second beam 205. A lockout projection receiving opening 254 is formed by the first lockout projection engagement member 230, the second lockout projection engagement member 240, and portions of the pair of resiliently deformable beams 204, 205.
L'invention concerne un dispositif d'assurance de position de connecteur (200) comprenant une portion de base (202) et une paire de poutres élastiquement déformables (204, 205). Des éléments de mise en prise de came (250) s'étendent à partir de parois latérales (256) de la paire de poutres élastiquement déformables (204, 205). Un premier élément de mise en prise de saillie de verrouillage (230) est disposé à proximité des extrémités avant (224) de la paire de poutres élastiquement déformables (204, 205) et s'étend entre la première poutre (204) et la deuxième poutre (205). Un deuxième élément de mise en prise de saillie de verrouillage (240) est espacé de l'extrémité avant de base (210) et espacé du premier élément de mise en prise de saillie de verrouillage (230). Le deuxième élément de mise en prise de saillie de verrouillage (240) s'étend entre la première poutre (204) et la deuxième poutre (205). Une ouverture de réception de saillie de verrouillage (254) est formée par le premier élément de mise en prise de saillie de verrouillage (230), le deuxième élément de mise en prise de saillie de verrouillage (240) et des portions de la paire de poutres élastiquement déformables (204, 205).</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; fre |
recordid | cdi_epo_espacenet_WO2019180562A1 |
source | esp@cenet |
subjects | BASIC ELECTRIC ELEMENTS CURRENT COLLECTORS ELECTRICITY LINE CONNECTORS |
title | CONNECTOR POSITION ASSURANCE MEMBER |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-24T14%3A52%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=EVANS,%20Nicholas%20Lee&rft.date=2019-09-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EWO2019180562A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |