Method and apparatus to change generator start delay and runtime following outage
A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been i...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Lathrop Todd M Loucks David G |
description | A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US9696740B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US9696740B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US9696740B23</originalsourceid><addsrcrecordid>eNrjZAj0TS3JyE9RSMwD4oKCxKLEktJihZJ8heSMxLz0VIX01LxUoFh-kUJxSWJRiUJKak5iJVh1UWleSWZuqkJafk5OfnlmXrpCfmlJYnoqDwNrWmJOcSovlOZmUHBzDXH20E0tyI9PLS5ITAYaWRIfGmxpZmlmbmLgZGRMhBIAe583uw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method and apparatus to change generator start delay and runtime following outage</title><source>esp@cenet</source><creator>Lathrop Todd M ; Loucks David G</creator><creatorcontrib>Lathrop Todd M ; Loucks David G</creatorcontrib><description>A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode.</description><language>eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; GENERATION ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PHYSICS ; REGULATING ; SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES ; SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2017</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170704&DB=EPODOC&CC=US&NR=9696740B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170704&DB=EPODOC&CC=US&NR=9696740B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Lathrop Todd M</creatorcontrib><creatorcontrib>Loucks David G</creatorcontrib><title>Method and apparatus to change generator start delay and runtime following outage</title><description>A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode.</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>GENERATION</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PHYSICS</subject><subject>REGULATING</subject><subject>SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES</subject><subject>SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2017</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAj0TS3JyE9RSMwD4oKCxKLEktJihZJ8heSMxLz0VIX01LxUoFh-kUJxSWJRiUJKak5iJVh1UWleSWZuqkJafk5OfnlmXrpCfmlJYnoqDwNrWmJOcSovlOZmUHBzDXH20E0tyI9PLS5ITAYaWRIfGmxpZmlmbmLgZGRMhBIAe583uw</recordid><startdate>20170704</startdate><enddate>20170704</enddate><creator>Lathrop Todd M</creator><creator>Loucks David G</creator><scope>EVB</scope></search><sort><creationdate>20170704</creationdate><title>Method and apparatus to change generator start delay and runtime following outage</title><author>Lathrop Todd M ; Loucks David G</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US9696740B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2017</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>GENERATION</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PHYSICS</topic><topic>REGULATING</topic><topic>SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES</topic><topic>SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>Lathrop Todd M</creatorcontrib><creatorcontrib>Loucks David G</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Lathrop Todd M</au><au>Loucks David G</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method and apparatus to change generator start delay and runtime following outage</title><date>2017-07-04</date><risdate>2017</risdate><abstract>A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US9696740B2 |
source | esp@cenet |
subjects | CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER CONTROL OR REGULATING SYSTEMS IN GENERAL CONTROLLING CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ELECTRICITY FUNCTIONAL ELEMENTS OF SUCH SYSTEMS GENERATION MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS PHYSICS REGULATING SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES SYSTEMS FOR STORING ELECTRIC ENERGY |
title | Method and apparatus to change generator start delay and runtime following outage |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T19%3A45%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Lathrop%20Todd%20M&rft.date=2017-07-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS9696740B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |