Determining electric grid endpoint phase connectivity
The service phase of the electrical connection to a customer endpoint device located within a power distribution system is determined by various techniques. At the feeder level, the system may be programmed to induce disturbances, thereby causing missed zero crossings at the customer endpoint device...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!