Job scheduling with optimization of power consumption
A scheduler is provided, which takes into account the location of the data to be accessed by a set of jobs. Once all the dependencies and the scheduling constraints of the plan are respected, the scheduler optimizes the order of the remaining jobs to be run, also considering the location of the data...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A scheduler is provided, which takes into account the location of the data to be accessed by a set of jobs. Once all the dependencies and the scheduling constraints of the plan are respected, the scheduler optimizes the order of the remaining jobs to be run, also considering the location of the data to be accessed. Several jobs needing an access to a dataset on a specific disk may be grouped together so that the grouped jobs are executed in succession, e.g., to prevent activating and deactivating the storage device several times, thus improving the power consumption and also avoiding input output performances degradation. |
---|