Power generation complex plant and plant control method
A power generation complex plant has a control switch, an overall control unit and a steam bypass facility. The overall control unit determines that a desired steam volume has reached a limit value of the volume of steam to be generated by a steam generating facility. A steam bypass facility control...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TANI AKINORI NOGAMI KAZUO NAKAI AKIMASA YAMASAKI MASUO KUBO YOJI |
description | A power generation complex plant has a control switch, an overall control unit and a steam bypass facility. The overall control unit determines that a desired steam volume has reached a limit value of the volume of steam to be generated by a steam generating facility. A steam bypass facility control unit adds a bias value B1 to a control command value V4 of the steam bypass facility to generate a new control command value V5 when the desired steam volume is determined to have reached the limit value. The steam bypass facility control unit then controls the volume and pressure of steam passing through the steam bypass facility on the basis of the new control command value V5 so that no switch of control may be made in the control switch. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US8104282B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US8104282B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US8104282B23</originalsourceid><addsrcrecordid>eNrjZDAPyC9PLVJIT81LLUosyczPU0jOzy3ISa1QKMhJzCtRSMxLgbKS8_NKivJzFHJTSzLyU3gYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWIy0MSS-NBgC0MDEyMLIycjYyKUAACZqy3m</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Power generation complex plant and plant control method</title><source>esp@cenet</source><creator>TANI AKINORI ; NOGAMI KAZUO ; NAKAI AKIMASA ; YAMASAKI MASUO ; KUBO YOJI</creator><creatorcontrib>TANI AKINORI ; NOGAMI KAZUO ; NAKAI AKIMASA ; YAMASAKI MASUO ; KUBO YOJI</creatorcontrib><description>A power generation complex plant has a control switch, an overall control unit and a steam bypass facility. The overall control unit determines that a desired steam volume has reached a limit value of the volume of steam to be generated by a steam generating facility. A steam bypass facility control unit adds a bias value B1 to a control command value V4 of the steam bypass facility to generate a new control command value V5 when the desired steam volume is determined to have reached the limit value. The steam bypass facility control unit then controls the volume and pressure of steam passing through the steam bypass facility on the basis of the new control command value V5 so that no switch of control may be made in the control switch.</description><language>eng</language><subject>BLASTING ; ENGINE PLANTS IN GENERAL ; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR ; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES ; HEATING ; LIGHTING ; MACHINES OR ENGINES IN GENERAL ; MECHANICAL ENGINEERING ; STEAM ACCUMULATORS ; STEAM ENGINE PLANTS ; STEAM ENGINES ; WEAPONS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120131&DB=EPODOC&CC=US&NR=8104282B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120131&DB=EPODOC&CC=US&NR=8104282B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TANI AKINORI</creatorcontrib><creatorcontrib>NOGAMI KAZUO</creatorcontrib><creatorcontrib>NAKAI AKIMASA</creatorcontrib><creatorcontrib>YAMASAKI MASUO</creatorcontrib><creatorcontrib>KUBO YOJI</creatorcontrib><title>Power generation complex plant and plant control method</title><description>A power generation complex plant has a control switch, an overall control unit and a steam bypass facility. The overall control unit determines that a desired steam volume has reached a limit value of the volume of steam to be generated by a steam generating facility. A steam bypass facility control unit adds a bias value B1 to a control command value V4 of the steam bypass facility to generate a new control command value V5 when the desired steam volume is determined to have reached the limit value. The steam bypass facility control unit then controls the volume and pressure of steam passing through the steam bypass facility on the basis of the new control command value V5 so that no switch of control may be made in the control switch.</description><subject>BLASTING</subject><subject>ENGINE PLANTS IN GENERAL</subject><subject>ENGINE PLANTS NOT OTHERWISE PROVIDED FOR</subject><subject>ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MACHINES OR ENGINES IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>STEAM ACCUMULATORS</subject><subject>STEAM ENGINE PLANTS</subject><subject>STEAM ENGINES</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAPyC9PLVJIT81LLUosyczPU0jOzy3ISa1QKMhJzCtRSMxLgbKS8_NKivJzFHJTSzLyU3gYWNMSc4pTeaE0N4OCm2uIs4duakF-fGpxQWIy0MSS-NBgC0MDEyMLIycjYyKUAACZqy3m</recordid><startdate>20120131</startdate><enddate>20120131</enddate><creator>TANI AKINORI</creator><creator>NOGAMI KAZUO</creator><creator>NAKAI AKIMASA</creator><creator>YAMASAKI MASUO</creator><creator>KUBO YOJI</creator><scope>EVB</scope></search><sort><creationdate>20120131</creationdate><title>Power generation complex plant and plant control method</title><author>TANI AKINORI ; NOGAMI KAZUO ; NAKAI AKIMASA ; YAMASAKI MASUO ; KUBO YOJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US8104282B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2012</creationdate><topic>BLASTING</topic><topic>ENGINE PLANTS IN GENERAL</topic><topic>ENGINE PLANTS NOT OTHERWISE PROVIDED FOR</topic><topic>ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MACHINES OR ENGINES IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>STEAM ACCUMULATORS</topic><topic>STEAM ENGINE PLANTS</topic><topic>STEAM ENGINES</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>TANI AKINORI</creatorcontrib><creatorcontrib>NOGAMI KAZUO</creatorcontrib><creatorcontrib>NAKAI AKIMASA</creatorcontrib><creatorcontrib>YAMASAKI MASUO</creatorcontrib><creatorcontrib>KUBO YOJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TANI AKINORI</au><au>NOGAMI KAZUO</au><au>NAKAI AKIMASA</au><au>YAMASAKI MASUO</au><au>KUBO YOJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Power generation complex plant and plant control method</title><date>2012-01-31</date><risdate>2012</risdate><abstract>A power generation complex plant has a control switch, an overall control unit and a steam bypass facility. The overall control unit determines that a desired steam volume has reached a limit value of the volume of steam to be generated by a steam generating facility. A steam bypass facility control unit adds a bias value B1 to a control command value V4 of the steam bypass facility to generate a new control command value V5 when the desired steam volume is determined to have reached the limit value. The steam bypass facility control unit then controls the volume and pressure of steam passing through the steam bypass facility on the basis of the new control command value V5 so that no switch of control may be made in the control switch.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US8104282B2 |
source | esp@cenet |
subjects | BLASTING ENGINE PLANTS IN GENERAL ENGINE PLANTS NOT OTHERWISE PROVIDED FOR ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES HEATING LIGHTING MACHINES OR ENGINES IN GENERAL MECHANICAL ENGINEERING STEAM ACCUMULATORS STEAM ENGINE PLANTS STEAM ENGINES WEAPONS |
title | Power generation complex plant and plant control method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T11%3A21%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TANI%20AKINORI&rft.date=2012-01-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS8104282B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |