Dynamic project management system

A dynamic project management system includes a server network and a master database. The network is configured to identify a personnel resource pool including a plurality of users. A project planning tool is used to effect the project plan including a plurality of tasks to be performed by the users...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KNUDSON, JAMES GEORGE, CREGO, MARK S, VIVIAN, WILLIAM LAWRENCE
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KNUDSON
JAMES GEORGE
CREGO
MARK S
VIVIAN
WILLIAM LAWRENCE
description A dynamic project management system includes a server network and a master database. The network is configured to identify a personnel resource pool including a plurality of users. A project planning tool is used to effect the project plan including a plurality of tasks to be performed by the users in accordance with respective time schedules. The network is configured for translating the project plan into the master database to effect an assignments table including a list of project tasks assigned for completion by each of the users. Time sheets are periodically prepared in the master database from the assignments table and include a list of the project tasks assigned to a respective user and a time period record for recording time entries therein. Actual time expended in performing the tasks is fed back to the project plan for managing completion of the tasks in accordance with the time schedules. In a preferred embodiment, a funding source is mapped to the project plan so that cumulative labor cost may be tracked based on actual time expended for the project tasks.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US5765140A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US5765140A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US5765140A3</originalsourceid><addsrcrecordid>eNrjZFB0qcxLzM1MVigoys9KTS5RyE3MS0xPzU3NK1EoriwuSc3lYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXxocGm5mamhiYGjsaEVQAAEHIlSA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Dynamic project management system</title><source>esp@cenet</source><creator>KNUDSON; JAMES GEORGE ; CREGO; MARK S ; VIVIAN; WILLIAM LAWRENCE</creator><creatorcontrib>KNUDSON; JAMES GEORGE ; CREGO; MARK S ; VIVIAN; WILLIAM LAWRENCE</creatorcontrib><description>A dynamic project management system includes a server network and a master database. The network is configured to identify a personnel resource pool including a plurality of users. A project planning tool is used to effect the project plan including a plurality of tasks to be performed by the users in accordance with respective time schedules. The network is configured for translating the project plan into the master database to effect an assignments table including a list of project tasks assigned for completion by each of the users. Time sheets are periodically prepared in the master database from the assignments table and include a list of the project tasks assigned to a respective user and a time period record for recording time entries therein. Actual time expended in performing the tasks is fed back to the project plan for managing completion of the tasks in accordance with the time schedules. In a preferred embodiment, a funding source is mapped to the project plan so that cumulative labor cost may be tracked based on actual time expended for the project tasks.</description><edition>6</edition><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>1998</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19980609&amp;DB=EPODOC&amp;CC=US&amp;NR=5765140A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19980609&amp;DB=EPODOC&amp;CC=US&amp;NR=5765140A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KNUDSON; JAMES GEORGE</creatorcontrib><creatorcontrib>CREGO; MARK S</creatorcontrib><creatorcontrib>VIVIAN; WILLIAM LAWRENCE</creatorcontrib><title>Dynamic project management system</title><description>A dynamic project management system includes a server network and a master database. The network is configured to identify a personnel resource pool including a plurality of users. A project planning tool is used to effect the project plan including a plurality of tasks to be performed by the users in accordance with respective time schedules. The network is configured for translating the project plan into the master database to effect an assignments table including a list of project tasks assigned for completion by each of the users. Time sheets are periodically prepared in the master database from the assignments table and include a list of the project tasks assigned to a respective user and a time period record for recording time entries therein. Actual time expended in performing the tasks is fed back to the project plan for managing completion of the tasks in accordance with the time schedules. In a preferred embodiment, a funding source is mapped to the project plan so that cumulative labor cost may be tracked based on actual time expended for the project tasks.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1998</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFB0qcxLzM1MVigoys9KTS5RyE3MS0xPzU3NK1EoriwuSc3lYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXxocGm5mamhiYGjsaEVQAAEHIlSA</recordid><startdate>19980609</startdate><enddate>19980609</enddate><creator>KNUDSON; JAMES GEORGE</creator><creator>CREGO; MARK S</creator><creator>VIVIAN; WILLIAM LAWRENCE</creator><scope>EVB</scope></search><sort><creationdate>19980609</creationdate><title>Dynamic project management system</title><author>KNUDSON; JAMES GEORGE ; CREGO; MARK S ; VIVIAN; WILLIAM LAWRENCE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US5765140A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1998</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>KNUDSON; JAMES GEORGE</creatorcontrib><creatorcontrib>CREGO; MARK S</creatorcontrib><creatorcontrib>VIVIAN; WILLIAM LAWRENCE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KNUDSON; JAMES GEORGE</au><au>CREGO; MARK S</au><au>VIVIAN; WILLIAM LAWRENCE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Dynamic project management system</title><date>1998-06-09</date><risdate>1998</risdate><abstract>A dynamic project management system includes a server network and a master database. The network is configured to identify a personnel resource pool including a plurality of users. A project planning tool is used to effect the project plan including a plurality of tasks to be performed by the users in accordance with respective time schedules. The network is configured for translating the project plan into the master database to effect an assignments table including a list of project tasks assigned for completion by each of the users. Time sheets are periodically prepared in the master database from the assignments table and include a list of the project tasks assigned to a respective user and a time period record for recording time entries therein. Actual time expended in performing the tasks is fed back to the project plan for managing completion of the tasks in accordance with the time schedules. In a preferred embodiment, a funding source is mapped to the project plan so that cumulative labor cost may be tracked based on actual time expended for the project tasks.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US5765140A
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Dynamic project management system
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T18%3A33%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KNUDSON;%20JAMES%20GEORGE&rft.date=1998-06-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS5765140A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true