Real-Time Influx Management Envelope Tool with a Multi-Phase Model and Machine Learning
A method of managing an influx encountered during a drilling operation conducted with respect to a wellbore includes drilling a wellbore into a subterranean formation. Drilling the wellbore includes circulating a drilling fluid through a wellbore while operating a drill bit and monitoring one or mor...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!