CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM
In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Onishi, Yoshiyuki Uchizono, Toyohito Shimada, Kenjiro Kurihara, Masahiro Aoki, Mitsuhiro |
description | In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2023143733A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2023143733A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2023143733A13</originalsourceid><addsrcrecordid>eNrjZNB29vcLDgkKdQ7x9PdT8HUN8fB3UXD0c1FAEQ-ODA5x9eVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGRsaGJsbmxsaOhsbEqQIAPmwmTQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM</title><source>esp@cenet</source><creator>Onishi, Yoshiyuki ; Uchizono, Toyohito ; Shimada, Kenjiro ; Kurihara, Masahiro ; Aoki, Mitsuhiro</creator><creatorcontrib>Onishi, Yoshiyuki ; Uchizono, Toyohito ; Shimada, Kenjiro ; Kurihara, Masahiro ; Aoki, Mitsuhiro</creatorcontrib><description>In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.</description><language>eng</language><subject>DREDGING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230511&DB=EPODOC&CC=US&NR=2023143733A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230511&DB=EPODOC&CC=US&NR=2023143733A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Onishi, Yoshiyuki</creatorcontrib><creatorcontrib>Uchizono, Toyohito</creatorcontrib><creatorcontrib>Shimada, Kenjiro</creatorcontrib><creatorcontrib>Kurihara, Masahiro</creatorcontrib><creatorcontrib>Aoki, Mitsuhiro</creatorcontrib><title>CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM</title><description>In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.</description><subject>DREDGING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB29vcLDgkKdQ7x9PdT8HUN8fB3UXD0c1FAEQ-ODA5x9eVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGRsaGJsbmxsaOhsbEqQIAPmwmTQ</recordid><startdate>20230511</startdate><enddate>20230511</enddate><creator>Onishi, Yoshiyuki</creator><creator>Uchizono, Toyohito</creator><creator>Shimada, Kenjiro</creator><creator>Kurihara, Masahiro</creator><creator>Aoki, Mitsuhiro</creator><scope>EVB</scope></search><sort><creationdate>20230511</creationdate><title>CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM</title><author>Onishi, Yoshiyuki ; Uchizono, Toyohito ; Shimada, Kenjiro ; Kurihara, Masahiro ; Aoki, Mitsuhiro</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2023143733A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>DREDGING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>Onishi, Yoshiyuki</creatorcontrib><creatorcontrib>Uchizono, Toyohito</creatorcontrib><creatorcontrib>Shimada, Kenjiro</creatorcontrib><creatorcontrib>Kurihara, Masahiro</creatorcontrib><creatorcontrib>Aoki, Mitsuhiro</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Onishi, Yoshiyuki</au><au>Uchizono, Toyohito</au><au>Shimada, Kenjiro</au><au>Kurihara, Masahiro</au><au>Aoki, Mitsuhiro</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM</title><date>2023-05-11</date><risdate>2023</risdate><abstract>In a construction method using an excavator that is controlled by manual operation, and an excavator that includes an automatic working-equipment control unit automatically controlling second working equipment on the basis of at least one of a current terrain and a designed terrain of a construction range in a construction site, and a tooth-edge position of the second working equipment, a progress rate that indicates a volume of soil having been excavated by the excavator to a target volume of soil to be excavated by the excavator in the construction range is calculated, and when the progress rate is equal to or larger than a threshold, the excavator stops construction of the construction range, and the excavator takes over the construction of the construction range, from the excavator.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2023143733A1 |
source | esp@cenet |
subjects | DREDGING FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING |
title | CONSTRUCTION METHOD AND CONSTRUCTION SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T16%3A14%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Onishi,%20Yoshiyuki&rft.date=2023-05-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2023143733A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |