AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION
A system and method for automatically routing datasets based on input and output requirements of information is disclosed. The example method includes obtaining a list of modules executing on one or more processing devices, each module to generate an output dataset of a respective output requirement...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hardie, Terry Marc Hess, Alexander |
description | A system and method for automatically routing datasets based on input and output requirements of information is disclosed. The example method includes obtaining a list of modules executing on one or more processing devices, each module to generate an output dataset of a respective output requirement based on an input dataset of a respective input requirement. The method also includes establishing connections between the modules based on the input requirements and output requirements, including a first connection between a first module and a third module and a second connection between a second module and the third module. The method also includes receiving a first output dataset from the first module and receiving a second output dataset from the second module and, responsive to determining that the first module reported an error, routing the second output dataset to the third module without routing the first output dataset to the third module. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2023134573A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2023134573A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2023134573A13</originalsourceid><addsrcrecordid>eNqNjL0KwjAUhbs4iPoOAWfBNkrnmNyYDL2pyc3QqVSJk2ihvj-m4gM4nR--c5bFVURyjSBQ7AwIXpB1yJxmClpABSg7ZmzuvTQdO4mQwQxYbCMxgTlEmq2HS7QeGkAK89yidr75vq2LxX14TGnz01Wx1UDS7NL46tM0Drf0TO8-hmpf8ZIfjjUXJf-P-gDUHDUr</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION</title><source>esp@cenet</source><creator>Hardie, Terry Marc ; Hess, Alexander</creator><creatorcontrib>Hardie, Terry Marc ; Hess, Alexander</creatorcontrib><description>A system and method for automatically routing datasets based on input and output requirements of information is disclosed. The example method includes obtaining a list of modules executing on one or more processing devices, each module to generate an output dataset of a respective output requirement based on an input dataset of a respective input requirement. The method also includes establishing connections between the modules based on the input requirements and output requirements, including a first connection between a first module and a third module and a second connection between a second module and the third module. The method also includes receiving a first output dataset from the first module and receiving a second output dataset from the second module and, responsive to determining that the first module reported an error, routing the second output dataset to the third module without routing the first output dataset to the third module.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230504&DB=EPODOC&CC=US&NR=2023134573A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230504&DB=EPODOC&CC=US&NR=2023134573A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hardie, Terry Marc</creatorcontrib><creatorcontrib>Hess, Alexander</creatorcontrib><title>AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION</title><description>A system and method for automatically routing datasets based on input and output requirements of information is disclosed. The example method includes obtaining a list of modules executing on one or more processing devices, each module to generate an output dataset of a respective output requirement based on an input dataset of a respective input requirement. The method also includes establishing connections between the modules based on the input requirements and output requirements, including a first connection between a first module and a third module and a second connection between a second module and the third module. The method also includes receiving a first output dataset from the first module and receiving a second output dataset from the second module and, responsive to determining that the first module reported an error, routing the second output dataset to the third module without routing the first output dataset to the third module.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjL0KwjAUhbs4iPoOAWfBNkrnmNyYDL2pyc3QqVSJk2ihvj-m4gM4nR--c5bFVURyjSBQ7AwIXpB1yJxmClpABSg7ZmzuvTQdO4mQwQxYbCMxgTlEmq2HS7QeGkAK89yidr75vq2LxX14TGnz01Wx1UDS7NL46tM0Drf0TO8-hmpf8ZIfjjUXJf-P-gDUHDUr</recordid><startdate>20230504</startdate><enddate>20230504</enddate><creator>Hardie, Terry Marc</creator><creator>Hess, Alexander</creator><scope>EVB</scope></search><sort><creationdate>20230504</creationdate><title>AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION</title><author>Hardie, Terry Marc ; Hess, Alexander</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2023134573A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><toplevel>online_resources</toplevel><creatorcontrib>Hardie, Terry Marc</creatorcontrib><creatorcontrib>Hess, Alexander</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hardie, Terry Marc</au><au>Hess, Alexander</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION</title><date>2023-05-04</date><risdate>2023</risdate><abstract>A system and method for automatically routing datasets based on input and output requirements of information is disclosed. The example method includes obtaining a list of modules executing on one or more processing devices, each module to generate an output dataset of a respective output requirement based on an input dataset of a respective input requirement. The method also includes establishing connections between the modules based on the input requirements and output requirements, including a first connection between a first module and a third module and a second connection between a second module and the third module. The method also includes receiving a first output dataset from the first module and receiving a second output dataset from the second module and, responsive to determining that the first module reported an error, routing the second output dataset to the third module without routing the first output dataset to the third module.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2023134573A1 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING ELECTRIC DIGITAL DATA PROCESSING PHYSICS |
title | AUTOMATED GENERATION OF DEPENDENCY HIERARCHY BASED ON INPUT AND OUTPUT REQUIREMENTS OF INFORMATION |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T23%3A17%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Hardie,%20Terry%20Marc&rft.date=2023-05-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2023134573A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |