A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division

A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mini...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: NING, Jianguo, FAN, Kegong, WEN, Zhijie, QIN, Zhongcheng, GUO, Zhongping, MA, Qihua
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator NING, Jianguo
FAN, Kegong
WEN, Zhijie
QIN, Zhongcheng
GUO, Zhongping
MA, Qihua
description A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mining shall be carried out on the first mining face strip by strip with belt conveyors arranged in the upper main roadway and assistant conveying devices in the lower main roadway and inclined intake roadway; the open-off cut of the first mining face shall be built on the underside of the upper main roadway at the boundary of the mine to carry out the downward inclined mining on the strike and along the inclination.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2023103613A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2023103613A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2023103613A13</originalsourceid><addsrcrecordid>eNqNysEKgkAQgGEvHaJ6h4HOgrrQXcwKwoiss2w65sAyK7tj0dtnVPdOP_x806BPYU_cgG3hYMMjGaMd6HFs7TUsqUHIWdwTTiiamPgGxSdvk1n24oZayDIUKJ1t4EFjBgHp8EdThxrWdCc_unkwabXxuPh2Fiw3-TnbhdjbCn2va2SU6lImUaLiSK1ilcbqP_UCBXRCRQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division</title><source>esp@cenet</source><creator>NING, Jianguo ; FAN, Kegong ; WEN, Zhijie ; QIN, Zhongcheng ; GUO, Zhongping ; MA, Qihua</creator><creatorcontrib>NING, Jianguo ; FAN, Kegong ; WEN, Zhijie ; QIN, Zhongcheng ; GUO, Zhongping ; MA, Qihua</creatorcontrib><description>A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mining shall be carried out on the first mining face strip by strip with belt conveyors arranged in the upper main roadway and assistant conveying devices in the lower main roadway and inclined intake roadway; the open-off cut of the first mining face shall be built on the underside of the upper main roadway at the boundary of the mine to carry out the downward inclined mining on the strike and along the inclination.</description><language>eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; MINING OR QUARRYING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230406&amp;DB=EPODOC&amp;CC=US&amp;NR=2023103613A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25569,76552</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230406&amp;DB=EPODOC&amp;CC=US&amp;NR=2023103613A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NING, Jianguo</creatorcontrib><creatorcontrib>FAN, Kegong</creatorcontrib><creatorcontrib>WEN, Zhijie</creatorcontrib><creatorcontrib>QIN, Zhongcheng</creatorcontrib><creatorcontrib>GUO, Zhongping</creatorcontrib><creatorcontrib>MA, Qihua</creatorcontrib><title>A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division</title><description>A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mining shall be carried out on the first mining face strip by strip with belt conveyors arranged in the upper main roadway and assistant conveying devices in the lower main roadway and inclined intake roadway; the open-off cut of the first mining face shall be built on the underside of the upper main roadway at the boundary of the mine to carry out the downward inclined mining on the strike and along the inclination.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNysEKgkAQgGEvHaJ6h4HOgrrQXcwKwoiss2w65sAyK7tj0dtnVPdOP_x806BPYU_cgG3hYMMjGaMd6HFs7TUsqUHIWdwTTiiamPgGxSdvk1n24oZayDIUKJ1t4EFjBgHp8EdThxrWdCc_unkwabXxuPh2Fiw3-TnbhdjbCn2va2SU6lImUaLiSK1ilcbqP_UCBXRCRQ</recordid><startdate>20230406</startdate><enddate>20230406</enddate><creator>NING, Jianguo</creator><creator>FAN, Kegong</creator><creator>WEN, Zhijie</creator><creator>QIN, Zhongcheng</creator><creator>GUO, Zhongping</creator><creator>MA, Qihua</creator><scope>EVB</scope></search><sort><creationdate>20230406</creationdate><title>A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division</title><author>NING, Jianguo ; FAN, Kegong ; WEN, Zhijie ; QIN, Zhongcheng ; GUO, Zhongping ; MA, Qihua</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2023103613A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>NING, Jianguo</creatorcontrib><creatorcontrib>FAN, Kegong</creatorcontrib><creatorcontrib>WEN, Zhijie</creatorcontrib><creatorcontrib>QIN, Zhongcheng</creatorcontrib><creatorcontrib>GUO, Zhongping</creatorcontrib><creatorcontrib>MA, Qihua</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NING, Jianguo</au><au>FAN, Kegong</au><au>WEN, Zhijie</au><au>QIN, Zhongcheng</au><au>GUO, Zhongping</au><au>MA, Qihua</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division</title><date>2023-04-06</date><risdate>2023</risdate><abstract>A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mining shall be carried out on the first mining face strip by strip with belt conveyors arranged in the upper main roadway and assistant conveying devices in the lower main roadway and inclined intake roadway; the open-off cut of the first mining face shall be built on the underside of the upper main roadway at the boundary of the mine to carry out the downward inclined mining on the strike and along the inclination.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2023103613A1
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
MINING
MINING OR QUARRYING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
title A Kind of No-Pillar and Gob-Side Entry Retaining Mining and Construction Method without the Mining Area Division
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-13T10%3A53%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NING,%20Jianguo&rft.date=2023-04-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2023103613A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true