ELECRICAL LOAD MANAGEMENT SYSTEM
An electrical load management system for controlling first, second, and third electrical loads is provided. A load management computer determines a demand threshold indicating a threshold amount of demanded power from a utility company power grid. The computer determines whether a time interval has...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Vijayakumar, Clement David Puli, Jyothi Goveas, Terence Antony Ayer, Sridhar K |
description | An electrical load management system for controlling first, second, and third electrical loads is provided. A load management computer determines a demand threshold indicating a threshold amount of demanded power from a utility company power grid. The computer determines whether a time interval has an associated non-peak energy charge. And if so, then the computer determines whether a first total load request from the first, second, and third electrical loads will exceed the demand threshold. And if so, then the computer determines whether a second total load request from the first and second electrical loads having high and medium load priorities, respectively, will exceed the demand threshold. And if not, then the computer commands the first and second electrical loads to be energized for the predetermined time interval. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2022278550A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2022278550A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2022278550A13</originalsourceid><addsrcrecordid>eNrjZFBw9XF1DvJ0dvRR8PF3dFHwdfRzdHf1dfULUQiODA5x9eVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGRkZG5hampgaOhsbEqQIAcg0iww</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>ELECRICAL LOAD MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>Vijayakumar, Clement David ; Puli, Jyothi ; Goveas, Terence Antony ; Ayer, Sridhar K</creator><creatorcontrib>Vijayakumar, Clement David ; Puli, Jyothi ; Goveas, Terence Antony ; Ayer, Sridhar K</creatorcontrib><description>An electrical load management system for controlling first, second, and third electrical loads is provided. A load management computer determines a demand threshold indicating a threshold amount of demanded power from a utility company power grid. The computer determines whether a time interval has an associated non-peak energy charge. And if so, then the computer determines whether a first total load request from the first, second, and third electrical loads will exceed the demand threshold. And if so, then the computer determines whether a second total load request from the first and second electrical loads having high and medium load priorities, respectively, will exceed the demand threshold. And if not, then the computer commands the first and second electrical loads to be energized for the predetermined time interval.</description><language>eng</language><subject>ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVEREDIN A SINGLE OTHER SUBCLASS ; CALCULATING ; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; COMPUTING ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRICITY ; GENERATION ; MEASURING ; MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE ; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR ; PHYSICS ; SYSTEMS FOR STORING ELECTRIC ENERGY ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR ; TARIFF METERING APPARATUS ; TESTING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220901&DB=EPODOC&CC=US&NR=2022278550A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220901&DB=EPODOC&CC=US&NR=2022278550A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Vijayakumar, Clement David</creatorcontrib><creatorcontrib>Puli, Jyothi</creatorcontrib><creatorcontrib>Goveas, Terence Antony</creatorcontrib><creatorcontrib>Ayer, Sridhar K</creatorcontrib><title>ELECRICAL LOAD MANAGEMENT SYSTEM</title><description>An electrical load management system for controlling first, second, and third electrical loads is provided. A load management computer determines a demand threshold indicating a threshold amount of demanded power from a utility company power grid. The computer determines whether a time interval has an associated non-peak energy charge. And if so, then the computer determines whether a first total load request from the first, second, and third electrical loads will exceed the demand threshold. And if so, then the computer determines whether a second total load request from the first and second electrical loads having high and medium load priorities, respectively, will exceed the demand threshold. And if not, then the computer commands the first and second electrical loads to be energized for the predetermined time interval.</description><subject>ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVEREDIN A SINGLE OTHER SUBCLASS</subject><subject>CALCULATING</subject><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>COMPUTING</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MEASURING</subject><subject>MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE</subject><subject>MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR</subject><subject>PHYSICS</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><subject>TARIFF METERING APPARATUS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBw9XF1DvJ0dvRR8PF3dFHwdfRzdHf1dfULUQiODA5x9eVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGRkZG5hampgaOhsbEqQIAcg0iww</recordid><startdate>20220901</startdate><enddate>20220901</enddate><creator>Vijayakumar, Clement David</creator><creator>Puli, Jyothi</creator><creator>Goveas, Terence Antony</creator><creator>Ayer, Sridhar K</creator><scope>EVB</scope></search><sort><creationdate>20220901</creationdate><title>ELECRICAL LOAD MANAGEMENT SYSTEM</title><author>Vijayakumar, Clement David ; Puli, Jyothi ; Goveas, Terence Antony ; Ayer, Sridhar K</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2022278550A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2022</creationdate><topic>ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVEREDIN A SINGLE OTHER SUBCLASS</topic><topic>CALCULATING</topic><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>COMPUTING</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MEASURING</topic><topic>MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE</topic><topic>MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR</topic><topic>PHYSICS</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><topic>TARIFF METERING APPARATUS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>Vijayakumar, Clement David</creatorcontrib><creatorcontrib>Puli, Jyothi</creatorcontrib><creatorcontrib>Goveas, Terence Antony</creatorcontrib><creatorcontrib>Ayer, Sridhar K</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Vijayakumar, Clement David</au><au>Puli, Jyothi</au><au>Goveas, Terence Antony</au><au>Ayer, Sridhar K</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>ELECRICAL LOAD MANAGEMENT SYSTEM</title><date>2022-09-01</date><risdate>2022</risdate><abstract>An electrical load management system for controlling first, second, and third electrical loads is provided. A load management computer determines a demand threshold indicating a threshold amount of demanded power from a utility company power grid. The computer determines whether a time interval has an associated non-peak energy charge. And if so, then the computer determines whether a first total load request from the first, second, and third electrical loads will exceed the demand threshold. And if so, then the computer determines whether a second total load request from the first and second electrical loads having high and medium load priorities, respectively, will exceed the demand threshold. And if not, then the computer commands the first and second electrical loads to be energized for the predetermined time interval.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2022278550A1 |
source | esp@cenet |
subjects | ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVEREDIN A SINGLE OTHER SUBCLASS CALCULATING CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER COMPUTING CONVERSION OR DISTRIBUTION OF ELECTRIC POWER COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRICITY GENERATION MEASURING MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR PHYSICS SYSTEMS FOR STORING ELECTRIC ENERGY SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR TARIFF METERING APPARATUS TESTING |
title | ELECRICAL LOAD MANAGEMENT SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T10%3A24%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Vijayakumar,%20Clement%20David&rft.date=2022-09-01&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2022278550A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |