CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF
A construction management system and method thereof. The system comprising: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: analyze a project data of at least one construction project; based on the ana...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SELLA, Tom AGASSI, Or |
description | A construction management system and method thereof. The system comprising: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: analyze a project data of at least one construction project; based on the analysis of the project data, derive metadata associated with the construction project, wherein the metadata designates at least various stages associated with the construction project and a completion threshold for each stage; and based on the metadata, generate an interface for allowing at least two end-user devices to collaboratively interact with the interface, wherein the interface provides interactive visual features indicative of a progress of each of the stages associated with the construction project. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2020027043A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2020027043A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2020027043A13</originalsourceid><addsrcrecordid>eNrjZLB09vcLDgkKdQ7x9PdTCAjy93J1DlHwdfRzdHf1dfULUQiODA5x9VVw9HNR8HUN8fB3UQjxcA1y9XfjYWBNS8wpTuWF0twMym6uIc4euqkF-fGpxQWJyal5qSXxocFGBkYGBkbmBibGjobGxKkCAFgcKeE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF</title><source>esp@cenet</source><creator>SELLA, Tom ; AGASSI, Or</creator><creatorcontrib>SELLA, Tom ; AGASSI, Or</creatorcontrib><description>A construction management system and method thereof. The system comprising: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: analyze a project data of at least one construction project; based on the analysis of the project data, derive metadata associated with the construction project, wherein the metadata designates at least various stages associated with the construction project and a completion threshold for each stage; and based on the metadata, generate an interface for allowing at least two end-user devices to collaboratively interact with the interface, wherein the interface provides interactive visual features indicative of a progress of each of the stages associated with the construction project.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200123&DB=EPODOC&CC=US&NR=2020027043A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20200123&DB=EPODOC&CC=US&NR=2020027043A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SELLA, Tom</creatorcontrib><creatorcontrib>AGASSI, Or</creatorcontrib><title>CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF</title><description>A construction management system and method thereof. The system comprising: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: analyze a project data of at least one construction project; based on the analysis of the project data, derive metadata associated with the construction project, wherein the metadata designates at least various stages associated with the construction project and a completion threshold for each stage; and based on the metadata, generate an interface for allowing at least two end-user devices to collaboratively interact with the interface, wherein the interface provides interactive visual features indicative of a progress of each of the stages associated with the construction project.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB09vcLDgkKdQ7x9PdTCAjy93J1DlHwdfRzdHf1dfULUQiODA5x9VVw9HNR8HUN8fB3UQjxcA1y9XfjYWBNS8wpTuWF0twMym6uIc4euqkF-fGpxQWJyal5qSXxocFGBkYGBkbmBibGjobGxKkCAFgcKeE</recordid><startdate>20200123</startdate><enddate>20200123</enddate><creator>SELLA, Tom</creator><creator>AGASSI, Or</creator><scope>EVB</scope></search><sort><creationdate>20200123</creationdate><title>CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF</title><author>SELLA, Tom ; AGASSI, Or</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2020027043A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2020</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SELLA, Tom</creatorcontrib><creatorcontrib>AGASSI, Or</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SELLA, Tom</au><au>AGASSI, Or</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF</title><date>2020-01-23</date><risdate>2020</risdate><abstract>A construction management system and method thereof. The system comprising: a processing circuitry; and a memory, the memory containing instructions that, when executed by the processing circuitry, configure the system to: analyze a project data of at least one construction project; based on the analysis of the project data, derive metadata associated with the construction project, wherein the metadata designates at least various stages associated with the construction project and a completion threshold for each stage; and based on the metadata, generate an interface for allowing at least two end-user devices to collaboratively interact with the interface, wherein the interface provides interactive visual features indicative of a progress of each of the stages associated with the construction project.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2020027043A1 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | CONSTRUCTION PROJECT MANAGEMENT SYSTEM AND METHOD THEREOF |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T23%3A44%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SELLA,%20Tom&rft.date=2020-01-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2020027043A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |