SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD

A statistical model of a delay time of each mobile body to a plan schedule is generated in a predetermined section on the basis of the plan schedule, an actual schedule that is a daily travel result of the mobile body, and actual values of delay factors in a chronological order, at least either of p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TOMIYAMA, Tomoe, OKAHARA, Natsumi, MAEKAWA, Yuki, TAKAI, Tomohito
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TOMIYAMA, Tomoe
OKAHARA, Natsumi
MAEKAWA, Yuki
TAKAI, Tomohito
description A statistical model of a delay time of each mobile body to a plan schedule is generated in a predetermined section on the basis of the plan schedule, an actual schedule that is a daily travel result of the mobile body, and actual values of delay factors in a chronological order, at least either of past result analysis processing of classifying a first delay time that is a delay time of the mobile body into second delay times that are delay times of the delay factors of the mobile body on the basis of the generated statistical model and the actual values of the delay factors and future prediction analysis processing of predicting a third delay time that is a delay time of a requested mobile body on the basis of the statistical model and assumed values of the delay factors with respect of a new plan schedule is executed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2019318253A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2019318253A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2019318253A13</originalsourceid><addsrcrecordid>eNrjZNAOdvZwdQn1cVVw9HP0iQz2DFYIDg0I8A8KUXBxDfN0Bom7KPi6hnj4u_AwsKYl5hSn8kJpbgZlN9cQZw_d1IL8-NTigsTk1LzUkvjQYCMDQ0tjQwsjU2NHQ2PiVAEAC3Ul3A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD</title><source>esp@cenet</source><creator>TOMIYAMA, Tomoe ; OKAHARA, Natsumi ; MAEKAWA, Yuki ; TAKAI, Tomohito</creator><creatorcontrib>TOMIYAMA, Tomoe ; OKAHARA, Natsumi ; MAEKAWA, Yuki ; TAKAI, Tomohito</creatorcontrib><description>A statistical model of a delay time of each mobile body to a plan schedule is generated in a predetermined section on the basis of the plan schedule, an actual schedule that is a daily travel result of the mobile body, and actual values of delay factors in a chronological order, at least either of past result analysis processing of classifying a first delay time that is a delay time of the mobile body into second delay times that are delay times of the delay factors of the mobile body on the basis of the generated statistical model and the actual values of the delay factors and future prediction analysis processing of predicting a third delay time that is a delay time of a requested mobile body on the basis of the statistical model and assumed values of the delay factors with respect of a new plan schedule is executed.</description><language>eng</language><subject>CALCULATING ; COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS ; COMPUTING ; COUNTING ; ELECTRIC DIGITAL DATA PROCESSING ; ENSURING THE SAFETY OF RAILWAY TRAFFIC ; GUIDING RAILWAY TRAFFIC ; PERFORMING OPERATIONS ; PHYSICS ; RAILWAYS ; TRANSPORTING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191017&amp;DB=EPODOC&amp;CC=US&amp;NR=2019318253A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191017&amp;DB=EPODOC&amp;CC=US&amp;NR=2019318253A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TOMIYAMA, Tomoe</creatorcontrib><creatorcontrib>OKAHARA, Natsumi</creatorcontrib><creatorcontrib>MAEKAWA, Yuki</creatorcontrib><creatorcontrib>TAKAI, Tomohito</creatorcontrib><title>SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD</title><description>A statistical model of a delay time of each mobile body to a plan schedule is generated in a predetermined section on the basis of the plan schedule, an actual schedule that is a daily travel result of the mobile body, and actual values of delay factors in a chronological order, at least either of past result analysis processing of classifying a first delay time that is a delay time of the mobile body into second delay times that are delay times of the delay factors of the mobile body on the basis of the generated statistical model and the actual values of the delay factors and future prediction analysis processing of predicting a third delay time that is a delay time of a requested mobile body on the basis of the statistical model and assumed values of the delay factors with respect of a new plan schedule is executed.</description><subject>CALCULATING</subject><subject>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>ENSURING THE SAFETY OF RAILWAY TRAFFIC</subject><subject>GUIDING RAILWAY TRAFFIC</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICS</subject><subject>RAILWAYS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAOdvZwdQn1cVVw9HP0iQz2DFYIDg0I8A8KUXBxDfN0Bom7KPi6hnj4u_AwsKYl5hSn8kJpbgZlN9cQZw_d1IL8-NTigsTk1LzUkvjQYCMDQ0tjQwsjU2NHQ2PiVAEAC3Ul3A</recordid><startdate>20191017</startdate><enddate>20191017</enddate><creator>TOMIYAMA, Tomoe</creator><creator>OKAHARA, Natsumi</creator><creator>MAEKAWA, Yuki</creator><creator>TAKAI, Tomohito</creator><scope>EVB</scope></search><sort><creationdate>20191017</creationdate><title>SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD</title><author>TOMIYAMA, Tomoe ; OKAHARA, Natsumi ; MAEKAWA, Yuki ; TAKAI, Tomohito</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2019318253A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2019</creationdate><topic>CALCULATING</topic><topic>COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>ENSURING THE SAFETY OF RAILWAY TRAFFIC</topic><topic>GUIDING RAILWAY TRAFFIC</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICS</topic><topic>RAILWAYS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>TOMIYAMA, Tomoe</creatorcontrib><creatorcontrib>OKAHARA, Natsumi</creatorcontrib><creatorcontrib>MAEKAWA, Yuki</creatorcontrib><creatorcontrib>TAKAI, Tomohito</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TOMIYAMA, Tomoe</au><au>OKAHARA, Natsumi</au><au>MAEKAWA, Yuki</au><au>TAKAI, Tomohito</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD</title><date>2019-10-17</date><risdate>2019</risdate><abstract>A statistical model of a delay time of each mobile body to a plan schedule is generated in a predetermined section on the basis of the plan schedule, an actual schedule that is a daily travel result of the mobile body, and actual values of delay factors in a chronological order, at least either of past result analysis processing of classifying a first delay time that is a delay time of the mobile body into second delay times that are delay times of the delay factors of the mobile body on the basis of the generated statistical model and the actual values of the delay factors and future prediction analysis processing of predicting a third delay time that is a delay time of a requested mobile body on the basis of the statistical model and assumed values of the delay factors with respect of a new plan schedule is executed.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2019318253A1
source esp@cenet
subjects CALCULATING
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
COMPUTING
COUNTING
ELECTRIC DIGITAL DATA PROCESSING
ENSURING THE SAFETY OF RAILWAY TRAFFIC
GUIDING RAILWAY TRAFFIC
PERFORMING OPERATIONS
PHYSICS
RAILWAYS
TRANSPORTING
title SCHEDULE ANALYSIS SUPPORT DEVICE AND METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-20T08%3A43%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TOMIYAMA,%20Tomoe&rft.date=2019-10-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2019318253A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true